SkyWave Comments 7-1

COMMENT submitted by SkyWave Mobile Communications, Corp.

SkyWave Comments

2009-07-10

This document pretains to SES-MOD-20090429-00536 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2009042900536_722041

                                 Before the
                    FEDERAL COMMUNICATIONS COMMISSION
                               Washington, D.C. 20554



In the Matter of :
Mobile Satellite Ventures Subsidiary LLC

Application for Minor Modification of Space       File No. SAT—MOD—20090429—00047
Station License (AMSC—1)

Application for Minor Modification of Space       File No. SAT—MOD—20090429—00046
Station License (MSV—1)

Application for Minor Modification of Blanket    File No. SES—MOD—20090429—00536
License to Operate Mobile Earth Terminals
(MSAT—1)




         COMMENTS OF SKYWAVE MOBILE COMMUNICATIONS, CORP.
              AND SKYWAVE MOBILE COMMUNICATIONS, INC.




                                         SkyWave Mobile Communications, Inc.
                                         SkyWave Mobile Communications, Corp.
                                         1145 Innovation Drive, Suite 288
                                         Ottawa, Ontario
                                         Canada K2K 3G8




July 10, 2009


                                                      Table of Contents

SUIMM@TY ....022.22200220esarasevvvvveavvssvvevssrrkresvressvrecrecrrrresressstreserrrrerrsserarverrsecrr es v cce e ev ie e e en reea ces i


I.        |yjpsio}») Hosio oo 1

H1.       SKYWAVE AND ITS END—USERS HAVE A PARAMOUNT INTEREST IN
          AVOIDING INTERFERENCE FROM SKYTERRA‘S ATC SYSTEM................. 2

III.      SKYTERRA‘S WAIVERS WOULD INCREASE INTERFERENCE TO LAND
          iojs] iS | = e 4

          A.         SkyTerra Should Not Be Able to Increase the Base Station EIRP ............. 5

          B.         SkyTerra Should Not Be Able To Increase Overload or Intermodulation
                     Interference by Using Alternative Air Interface PrOtOCOIS .....................2.22. 8

          C.         SkyTerra Should Not Be Able To Increase Out—of—Channel Interference to
                     Land MODiIG@ T@rMIN@AIS ........22.2220000020e¥r¥r k ak e vevrerrrrrrrrverrrkvr k v e e e se r e k e e rrrrrenes 9

IV.       _COMMISSION SHOULD CONFIRM THAT SKYTERRA‘S ATC OPERATIONS
          WILL STILL BE SUBJECT TO 47 C.F.R. §25,255 ....2222022220200200reerre k e rrrrrreerrreag e 10

          CONCLUSION 1122222222222 222v¥rvv e rrrrrrersrrrritrrerrrerrsrrrerrrrsserrss inss r iess e esd errrrer en e raeke4 10


                                         SUMMARY

       SkyWave Mobile Communications, Corp. and SkyWave Mobile Communications,

Inc. (collectively, "SkyWave") file comments on the above—captioned Sky Terra

applications ("Applications") to emphasize the substantial increased interference the

requested SkyTerra waivers could cause SkyWave‘s land mobile satellite services

throughout the United States. SkyWave provides critical tracking, monitoring and

control functions vital to the military, law enforcement, security, first—responders, critical

infrastructure, transportation and commercial sectors.

       SkyWave serves approximately 55,000 land mobile terminals in the United

States using SkyTerra and Inmarsat satellites. SkyWave‘s U.S. end—users include the

Department of Defense Counter—Narcoterrorism Technology Program Office, the Naval

Surface Warfare Center, Department of Homeland Security, Drug Enforcement Agency,

Tennessee Valley Authority, Washington State Department of Transportation, American

Red Cross, Southern California Edison, Union Pacific and more than 500 trucking

companies. These end—users rely on SkyWave‘s ubiquitous coverage throughout the

entire United States (and beyond). Federal government agencies and transportation

companies select SkyWave for their mission—critical tracking, monitoring and control

requirements because the service is reliably available in both urban and rural

environments. SkyWave‘s service has been growing rapidly, adding more than 10,000

new terminals per year.

       As discussed in the comments and technical annex, the SkyTerra‘s waivers to (1)

increase ATC base station EIRP; (2) adopt any air interface standard without

demonstrating that it would not increase interference; and (3) eliminate the out—of—


channel emissions limit for land mobile terminals could substantially increase

interference to SkyWave‘s land mobile service in the U.S.

       Some of SkyTerra‘s waivers implicitly assume that it can narrow the range of

interference cases to cover only aeronautical terminals on planes near airports and

maritime terminals on ships near ports. While there is no question that these

aeronautical and maritime terminals need protection from ATC interference, so do the

55,000 SkyWave terminals, primarily on trucks and other vehicles that move throughout

the urban and suburban environments across the United States.

       SkyTerra‘s principal justification for granting the waivers is to implement the

confidential agreement between SkyTerra and Inmarsat. While SkyWave has the

utmost respect for these two satellite operators who supply its space segment, their

agreement was not made with SkyWave, is not available to SkyWave, and apparently

did not cover all of SkyWave‘s interference concerns.

       SkyWave is committed to working constructively with the Commission, SkyTerra

and other interested parties to resolve the interference issues. SkyWave is willing to

assign sufficient engineering resources to work with SkyTerra‘s engineers and others to

develop acceptable solutions. Until such solutions have been developed that assure

that SkyWave‘s mission—critical services will remain reliably available throughout the

U.S. to military, law enforcement, security, first—responders, critical infrastructure,

transportation and commercial users, the waivers should not be granted.


                                          Before the
                      FEDERAL COMMUNICATIONS COMMISSION
                             Washington, D.C. 20554



In the Matter of :
Mobile Satellite Ventures Subsidiary LLC

Application for Minor Modification of Space            File No. SAT—MOD—20090429—00047
Station License (AMSC—1)

Application for Minor Modification of Space            File No. SAT—MOD—20090429—00046
Station License (MSV—1)

Application for Minor Modification of Blanket )        File No. SES—MOD—20090429—00536
License to Operate Mobile Earth Terminals )
(MSAT—1)                                        )
                                                )
                                                )

           COMMENTS OF SKYWAVE MOBILE COMMUNICATIONS, CORP.
                AND SKYWAVE MOBILE COMMUNICATIONS, INC.



I.     INTRODUCTION

       SkyWave Mobile Communications, Corp. and SkyWave Mobile Communications,

Inc. (collectively, "SkyWave") hereby file their comments on the above—captioned

applications (collectively, "Applications").‘




‘ On July 6, 2009, SkyWave filed a letter, explaining that it would respond to the
identical above—captioned applications in a single filing on July 10, 2009 in response to
the two public notices issued. Policy Branch Information; Space Station Applications
Accepted for Filing, Report No. SAT—00609, File Nos. SAT—MOD—20090429—00047,
SAT—MOD—20090429—00046 (June 5, 2009); Satellite Comme‘ns Servs.; Satellite Radio
Applications Accepted for Filing, Report No. SES—01145, File No. SES—MOD—20090429—
00536 (June 10, 2009).


II.    SKYWAVE AND ITS END—USERS HAVE A PARAMOUNT INTEREST IN
       AVOIDING INTERFERENCE FROM SKYTERRA‘S ATC SYSTEM

       SkyWave serves approximately 55,000 land mobile terminals in the United

States using SkyTerra and Inmarsat satellites. SkyWave is one of the leading U.S.

service providers on both satellite systems, based on the number of mobile earth

terminals ("METs"). SkyWave designed, owns and operates the terrestrial network

used to serve its end—users.

       Inmarsat estimates that the satellite low data rate market served by SkyWave is

$600 million today, with "significant growth potential."" Indeed, SkyWave‘s service has
been growing rapidly, adding more than 10,000 new terminals per year.         This rapid

growth has been driven in significant part by governmental mandates and increased

public and private concerns for freight security.

       SkyWave provides critical tracking, monitoring and control functions vital to the
military, law enforcement, security, first—responders, critical infrastructure, transportation

and commercial sectors.      SkyWave‘s U.S. end—users include the Department of

Defense Counter—Narcoterrorism Technology Program Office, the Naval Surface

Warfare Center, Department of Homeland Security, Drug Enforcement Agency,

Tennessee Valley Authority, Washington State Department of Transportation, American

Red Cross, Southern California Edison, Union Pacific and more than 500 trucking

companies. These end—users rely on SkyWave‘s ubiquitous coverage throughout the

entire United States (and beyond). Federal government agencies and transportation

companies select SkyWave for their mission—critical tracking, monitoring and control

requirements because the service is reliably available in both urban and rural

environments.




* Inmarsat Press Release, July 2, 2009.


       Indeed, SkyWave‘s customers typically have increased message traffic in urban

areas where trucks and other vehicles obtain and dispose of their cargoes. Today,

SkyWave is able to provide reliable service in urban areas.

       SkyWave has the utmost respect for its MSS space segment suppliers, SkyTerra

and Inmarsat." SkyWave files separate comments in this proceeding to highlight the

paramount interest of its end—users in ensuring that SkyWave‘s rapidly growing service

continues to operate throughout the United States reliably without interference from

SkyTerra‘s ATC system. SkyTerra has a strong commercial interest in providing a

robust and profitable ATC service, even at the cost of diminishing or potentially harming

its mobile satellite service. While Inmarsat has entered into a coordination agreement

with SkyTerra, that agreement necessarily involves numerous trade—offs. SkyWave

recognizes that Inmarsat is satisfied with the trade—offs in the SkyTerra—Inmarsat

agreement,* but SkyWave does not have sufficient information about the agreement to

confirm that the agreement will protect ifs 55,000 U.S. terminals from interference

caused by SkyTerra‘s ATC operations. Indeed, based on SkyTerra‘s limited description

of the SkyTerra—Inmarsat agreement in its Applications, it is clear that the agreement

does not protect the SkyWave terminals from interference from ATC.

      The Commission must look beyond the SkyTerra—Inmarsat agreement itself to

resolve SkyWave‘s interference concerns. While the agreement might be sufficient to

resolve the interference issues between the two satellite operators, the SkyTerra—

Inmarsat agreement cannot be dispositive of interference from the ATC service to the

SkyWave terminals. Indeed, while the Commission‘s ATC rules explicitly provide that a

coordination agreement can supersede the Commission‘s specific rules on interference



 In addition to supplying space segment, Inmarsat plc owns approximately 20% of
SkyWave Mobile Communications, Inc.

* See Comments of Inmarsat Global Ltd. (July 6, 2009).

                                          — 3.


from the ATC system to another MSS operator, 47 C.F.R. § 25.253(a)(1)—(2), there is no

similar provision with respect to ATC interference to METs.

         The Commission spent four years developing and refining its ATC rules,

achieving a technically complex balance between providing for a robust ATC service

while still ensuring that the existing and prospective primary satellite users of the MSS

bands would be able to continue to receive their critical mobile satellite service without
significant interference. The Commission noted that "the potential interference between

MSS and terrestrial mobile systems is, in fact, so great.”5 For this reason, the

Commission "adopt[ed] technical parameters for ATC operations. . . designed to protect

adjacent and in—band operations from interference from ATC."° Several of SkyTerra‘s
proposed waivers of the Commission‘s Rules could upset the Commission‘s carefully

crafted balance and permit substantial interference to tens of thousands of primary MSS

users.




III.     SKYTERRA‘S WAIVERS WOULD INCREASE INTERFERENCE TO LAND:
         MOBILE METS

         The Applications request seven waivers of the Commission‘s ATC Rules.

SkyWave comments on three waivers which could lead to significantly increased

interference to land mobile METs: (1) increased ATC base station EIRP; (2) adoption of

any air interface standard; and (3) a new out—of—channel emissions limit.

         The Applications are curiously silent on the legal standard for granting the

requested waivers. The Commission may grant a waiver under Section 1.3 "for good




5 Flexibility for Delivery of Communications by Mobile Satellite Service Providers in the 2
GHz Band, the L—Band, and the 1/6/2.4 GHz Bands, 18 FCC Red 1962 (2003) ("2003
ATC Order‘) 1| 60.

© 2003 ATC Order} 104.


cause shown" if the waiver does not "undermine the purposes of the rule, and there [is]

a stronger public interest benefit in granting the waiver than in applying the rule.""

       A.      SkyTerra Should Not Be Able to Increase the Base Station EIRP

       SkyTerra proposes that the Commission‘s Rules (47 C.F.R. §25.253(d)(1)—(4)),

limiting peak ATC base station ("BTS") EIRP, be relaxed substantially by using an

average EIRP, and by removing the per carrier metric. SkyTerra does not explain how

this average EIRP would be determined. In addition, elimination of the per carrier

metric would allow SkyTerra to increase the BTS power significantly.

       Effectively, SkyTerra seeks a further reconsideration of the Commission‘s Rule

governing BTS power levels. In the Commission‘s 2003 rulemaking establishing the

ATC rules," the Commission established a peak EIRP limit of 23.9 dBW. In response to

a SkyTerra/MSV Petition for Reconsideration, and following a careful technical analysis

and balancing of competing claims and interests, the Commission approved a

SkyTerra/MSV request to increase the peak EIRP by 8 dBW to 31.9 dBW.° Not

satisfied with the rule change it requested, SkyTerra/MSV now asks that its requested




" Rainbow DBS Company LLC; Consent to Withdraw and Unconditionally Release
Bonds and Request for Waiver of the Bond Requirement, Memorandum Opinion and
Order, 22 FCC Red 4272, («}7—8 (2007) (citing WAIT Radio, WAIT Radio v. FCC, 418
F.2d 1153, 1157 (D.C. Cir. 1969) and Northeast Cellular Telephone Co. v. FCC, 897
F.2d 1164, 1166 (D.C. Cir. 1990)).

® Flexibility for Delivery of Communications by Mobile Satellite Service Providers in the 2
GHz Band, the L—Band, and the 1/6/2.4 GHz Bands, 18 FCC Red 1962 (2003) ("2003
ATC Order‘).

° 47 C.F.R. §25.253(d)(1). Flexibility for Delivery of Communications by Mobile
Satellite Service Providers in the 2 GHz Band, the L—Band, and the 1/6/2.4 GHz Bands,
Memorandum Opinion and Second Order on Reconsideration, 20 FCC Red 4616 (2005)
1 53—55 ("ATC Reconsideration Order‘").


rule be waived to permit an additional substantial increase in BTS power of 13.1 dBW,

as shown in SkyWave‘s analysis in the Technical Annex at 3.‘°
       This technical analysis further demonstrates that, in urban environments, the

predicted interference range would approximately double for METs operating at both

less and greater than 2 MHz spacing from the ATC BTS downlink if SkyTerra‘s waiver

were granted. Technical Annex at 7.

      The predicted expansion of the interference range can be substantially greater in

suburban environments. As shown in the Technical Annex, the interference range can

readily extend to as much as 20 square kilometers in the suburban environment for

terminals separated by more than 2 MHz, and more than 100 square kilometers for

terminals separated by less than 2 MHz. Technical Annex at 9—10. While the

Commission has previously considered ATC interference scenarios primarily in urban

environments, the Commission does not limit deployment of ATC base stations to urban

environments. Since SkyTerra‘s requested waiver would have a substantial

interference impact in suburban environments, the Commission should evaluate the

impact of the requested waiver in suburban environments, or should condition the

waiver only to urban ATC BTS.

      SkyTerra first attempts to justify the waiver by claiming it is "consistent with the

parameters and models agreed to in the Coordination Agreement," Applications at 10.

Even if the requested waiver is consistent with the SkyTerra—Inmarsat Agreement,




!9 SkyWave recently completed an acquisition of assets, including technology,
customers and employees, from Transcore (an affiliate of Amtech Systems LLC). The
engineers who performed the technical analysis included people who began the
analysis while Transcore employees and are now SkyWave employees. Transcore now
resells the communications services of SkyWave. Accordingly, both companies face
the same interference risks from SkyTerra ATC, and both companies have relied on a
similar technical analysis for their filings.


SkyWave and its end—users are not parties to that agreement."" While operator—to—

operator interference rules can be superseded by a coordination agreement, 47 C.F.R.

§ 25.253(a)(2)—(3), interference to METs cannot. This critical distinction makes sense.

A satellite operator can agree to accept greater interference into its satellite system than

permitted by FCC Rule if it receives sufficient financial consideration or technical

tradeoffs in a different portion of its agreement. However, the satellite operator cannot

bind other parties, such as the end—users or service providers, with respect to

interference to METs.

       SkyTerra‘s second justification is that the requested waiver would bring ATC

base stations in line with the permitted power limits for PCS and AWS base stations.‘"

This justification also fails because (1) ATC is only an ancillary service in the L—band

that must be provided without significant interference to the co—frequency primary

mobile satellite service; (2) the PCS and AWS services do not present a similar

interference threat to MSS METs because there is substantial separation between these

bands; and (3) the PCS and AWS regulations cited by SkyTerra do not have the same

power limits requested by SkyTerra‘s waivers.

       The attached technical analysis establishes that granting the waiver would lead

to interference in substantially greater areas around ATC base stations in urban and

‘! Given SkyTerra‘s heavy reliance on the SkyTerra—Inmarsat agreement, the
Commission should require the at Sky Terra make it available to the engineers for the
parties participating in this proceeding through a suitable nondisclosure agreement.
Unless SkyWave is given access to the SkyTerra—Inmarsat agreement, it would violate
the Administrative Procedures Act and SkyWave‘s Due Process rights for the
Commission to rely on the confidential SkyTerra—Inmarsat agreement to grant the
Applications. Any request for a waiver of the Commission‘s Rules is "subject to the
provisions of the Administrative Procedures Act. .. ." 47 C.F.R. §1.3. SkyTerra‘s vague
and unsupported claim that its very specific change from peak EIRP to average EIRP is
consistent with the parameters and models agreed to in the agreement cannot be tested
by other interested parties.

‘2 Applications at 10, citing 47 C.F.R. §§ 24.232(a), 27.50(d)(1)(2).


suburban environments than permitted by the Commission‘s Rule. As noted, in 2005,

the Commission granted one SkyTerra request to increase the BTS power levels. This

requested waiver should not be granted because (1) SkyTerra has not demonstrated

good cause for the waiver; (2) the waiver would undermine the purpose of the

Commission‘s Rule, which is to protect the MSS METs from overioad and intermodal

interference caused by the peak EIRP from the ATC BTS; and (3) SkyTerra has not

established that there is "a stronger public interest benefit in granting the waiver than in

applying the rule" to protect MSS METs from interference.‘*

       B.     SkyTerra Should Not Be Able To Increase Overload or
              Intermodulation Interference by Using Alternative Air Interface
              Protocols

       SkyTerra asks the FCC to waive its Rules so it could use "any air interface

protocol" without "first demonstrat{ing] that such operations would produce no more

interference than a standard GSM network." Application at 8 (emphasis in original).

Since the Commission has already determined that another protocol could increase the

interference, and since SkyTerra has not shown good cause for waiving this important

rule, the waiver request should not be granted.

       In the ATC Reconsideration Order, the Commission‘s technical analysis

concluded that protocols other than GSM could lead to greater interference. See ATC

Reconsideration Order, Annex A, §§ 3.3, 3.6—3.7. Evaluating the interference risk in

advance is critical because once an ATC operator has deployed a system with a

different air interface it could be problematic to order that the system be converted to

GSM.


* Rainbow DBS Company LLC; Consent to Withdraw and Unconditionally Release
Bonds and Request for Waiver of the Bond Requirement, Memorandum Opinion and
Order, 22 FCC Red 4272, 4}7—8 (2007) (citing WAIT Radio, WAIT Radio v. FCC, 418
F.2d 1153, 1157 (D.C. Cir. 1969) and Northeast Cellular Telephone Co. v. FCC, 897
F.2d 1164, 1166 (D.C. Cir. 1990)).


       SkyTerra has not offered a good cause justification for overcoming the

Commission‘s prior findings of increased interference from non—GSM protocols.

SkyTerra merely suggests that conformity with parameters in the SkyTerra—Inmarsat

agreement is sufficient. Applications at 8. If the SkyTerra—Inmarsat agreement

parameters are sufficient to avoid increased interference, then SkyTerra should make

the appropriate demonstration of this fact in an application, open to scrutiny from all

interested parties, as required by the Commission‘s Rules. However, SkyTerra has not

demonstrated good cause for skipping this required showing, or for increasing

interference to MSS METs.

       C.     SkyTerra Should Not Be Able To Increase Out—of—Channel
              Interference to Land Mobile Terminals

       SkyTerra has requested a waiver of the out—of—channel emissions ("OOCE") of

BTS in Section 25.253(b). SkyTerra‘s waiver would replace the general requirement to

limit OOCE to —57.9 dBW/MHz at the edge of the frequency assignment with a new set

of limits that would apply only to protection for aeronautical and maritime terminals.

Since there would be no OOCE limit for land mobile METs, SkyWave opposes the
request.

       SkyWave provides service to a large and growing number of terminals on the

Inmarsat system. The Commission previously determined that the limit of —57.9

dBW/MHz at the edge of the frequency assignment struck the appropriate balance

between ATC operations and MSS in adjacent channels. Apparently, this OOCE limit

was requested by SkyTerra/MSV based on a representation from Ericsson thatit could
manufacture ATC base stations to that specification. ATC Order, Annex C.2, § 2.2.1.2.

While the SkyTerra—Inmarsat agreement may provide a reasonable alternative standard

for aeronautical and maritime terminals, SkyTerra has not provided good cause for

varying from the established Commission Rule for land mobile METs.


IV.    COMMISSION SHOULD CONFIRM THAT SKYTERRA‘S ATC OPERATIONS
       WILL STILL BE SUBJECT TO 47 C.F.R. §25.255

        Regardless of how the Commission resolves the pending waiver requests, the

Commission should make clear that Section 25.255 applies to SkyTerra‘s ATC

operations even where other Commission Rules have been waived. This rule provides
in pertinent part that:

               If harmful interference is caused to other services by
               ancillary MSS ATC operations, either from ATC base station
               operations or mobile terminals, the MSS ATC operator must
               resolve any such interference.

In the 2003 ATC Order, the Commission explained that the purpose of Section 25.255 is

to serve as a safety valve, ensuring that, in addition to the detailed interference rules in

Sections 25.252—254, there is a general prohibition on the ancillary ATC operations

causing harmful interference to the primary mobile satellite services.‘* SkyTerra has

not directly requested a waiver of the no harmful interference rule. However, given the

centrality of this Rule, the Commission should make it clear that any waiver granted to

SkyTerra is subject to the continuing duty to avoid harmful interference to mobile

satellite services.


VA     CONCLUSION

       The Applications do not meet the heavy burden of justifying the requested

waivers to (1) increase ATC BTS EIRP; (2) use any air interface protocol without

establishing that it would not cause greater interference than GSM; and (3) increase

OOCE with respect to land mobile METs. Granting these waivers would permit

SkyTerra‘s ATC system to cause substantial interference to tens of thousands of land



4 2003 ATC Order| 104.

                                           —10 —


mobile METs used throughout the U.S. by the military, government, security, first

responders, critical industry and transportation sectors.

       SkyWave is prepared to work with SkyTerra to resolve the interference issues

raised by the waivers. SkyWave is willing to assign sufficient engineering resources to

work with SkyTerra‘s engineers and others to develop acceptable solutions. Until such

solutions have been developed that assure that SkyWave‘s mission—critical services will

remain reliably available throughout the U.S. to military, law enforcement, security, first—

responders, critical infrastructure, transportation and commercial users, the waivers

should not be granted.



                                   Respectfully submitted,

                                   SKYWAVE MOBILE COMMUNICATIONS, INC.
                                   SKYWAVE MOBILE COMMUNICATIONS, CORP .



                                   By:             Is/
                                   Tom Houtman
                                   Director, Product Development
                                   SkyWave Mobile Communications, Inc.
                                   SkyWave Mobile Communications, Corp.
                                   1145 Innovation Drive, Suite 288
                                   Ottawa, Ontario
                                   Canada K2K 3GS8


July 10, 2009




                                          —11 —


                                      Certification

       1, Tom Houtman, Director, Product Development for SkyWave Mobile

Communications, Inc., certify that | am the technically qualified person with overall

responsibility for preparation of the information contained in the foregoing comments. |

am familiar with the requirements of Part 25 of the Commission‘s rules, and the

information contained in the comments is true and correct.




                                                         Is/
                                             Tom Houtman
                                             Director, Product Development
                                             SkyWave Mobile Communications, Inc.



July 10, 2009


                              CERTIFICATE OF SERVICE

       1 hereby certify that on July 10, 2009, | caused a true and correct copy of the

foregoing to be served by first—class mail, unless noted otherwise, on the following:

Gary M. Epstein                             Bruce D. Jacobs
Executive Vice President, Law and           Tony Lin
Regulation                                  John K. Hane
SkyTerra Subsidiary LLC                     Pillsbury Winthrop Shaw Pittman LLP
10802 Park Ridge Boulevard                  2300 N Street, N.W.
Reston, VA 20191                            Washington, DC 20037

                                            Counsel for SkyTerra Subsidiary LLC

                                            Best Copy and Printing, Inc.**
                                            focc@bcepiweb.com

** By electronic mail only


                                                                  /s/
                                                            Tom Houtman


                                      Technical Annex


1     Introduction


1.1    Overview

In this annex some interference impacts of SkyTerra‘s proposed waivers of the FCC‘s ATC rules

in 47 C.F.R. §25.253 are examined. In particular, the focus is on impacts of ATC basestation

("BTS") downlink modifications to SkyWave‘s land mobile MSS terminals operating in the

MSS L—band.


The analysis shows that SkyTerra‘s requested waivers will increase the downlink EIRP, which

will directly increase the overload interference to SkyWave terminals. The analysis shows that

SkyTerra‘s requested waivers will increase intermodulation interference, with direct impact to

SkyWave terminals. The ranges at which overload and intermodulation interfere with MSS

downlinks to SkyWave METs increases substantially, especially in suburban propagation

environments. This is expected to have significant impact to the quality of SkyWave‘s service,

especially in suburban areas, and to increase costs due to the need to detect interference issues in

the SkyWave MSS forward link.


In addition to this analysis the annex points out some areas in which SkyTerra‘s proposed

modification lacks clarity which is needed to determine the impact to SkyWave‘s land mobile

terminals. This is due to replacement of general specifications in the current version of 25.253

with aviation—terminal—specific changes without detail on land mobile specifications. In addition,

the requirement to clarify EIRP averaging is discussed.


1.2    References

In this Annex, FCC 03—15 refers to Flexibilityfor Delivery ofCommunications by Mobile

Satellite Service Providers in the 2 GHz Band, the L—Band, and the 1/6/2.4 GHz Bands, 18 FCC

Red 1962 (2003), while FCC 05—30 refers to Flexibilityfor Delivery of Communications by

Mobile Satellite Service Providers in the 2 GHz Band, the L—Band, and the 1/6/2. 4 GHz Bands,

Memorandum Opinion and Second Order on Reconsideration, 20 FCC Red 4616 (2005). The

SkyTerra modification request that is referred to is titled Modification and Requestfor Expedited

Consideration, dated April 29, 2009. This document is referred to here as the Modification.



2     ATC Basestation Downlink EIRP


2.1    EIRP Averaging

In section I(B)(1) of the Modification, SkyTerra requests a waiver of 47 C.F.R. §25.253(d)(1)),

limiting peak ATC base station ("BTS") EIRP per sector to 31.9 dBW, "to permit a maximum

average EIRP of 32 dBW/MHz per BTS sector..." The nature of the averaging must be specified

to determine the interference impact of this change. Averaging could conceivably be performed

over some combination of elevation, azimuth or solid angle, frequency, different ATC

basestations and time. If averaging is to be performed over time, the precise timeframe of that

averaging must be specified, as different results will pertain if the average is performed (for

example) over seconds during the busy hour, or over the course of 24 hours.


In the analysis of this annex, the term "maximum average EIRP" is assumed to substantially

mean peak EIRP over solid angle (per sector) and time. This peak is assumed to be a limit

applied to each ATC BTS individually.


2.2     Peak Downlink EIRP

SkyTerra‘s proposed Modification is expected to increase the ATC BTS EIRP per sector. The

current regulation of 47 CFR 25.253 (d) (1) states that ATC basestations shall not "exceed a peak

EIRP of 31.9—10*log(number of carriers) dBW/200 kHz, per sector, for each carrier in the 1525—

1541.5 and 1547.5—1559 MHz frequency bands". With reference to FCC 03—15, Appendix C2,

section 2.2.1.1, table 2.2.1.1.¢ and FCC 05—30 paragraph 55, we believe this limits the peak

EIRP per sector to 31.9 dBW in the band of 1525—1559 MHz. SkyTerra‘s requested Rule waiver

would remove the limit on EIRP and replace it with maximum average EIRP per MHz (an EIRP

spectral density measure rather than EIRP measure), with no well defined limitations on the

number of carriers, total bandwidth or peak power.


Although SkyTerra states in their Modification that they intend to have "up to two 10 MHz or

four 5 MHz bandwidth carriers/sector in a BTS sector‘", they have not requested that the waiver

include a BTS downlink bandwidth limitation. Although the worst case bandwidth might be

greater in the future, for this analysis we will assume that a limit of 20 MHz downlink bandwidth

per sector is observed. With this assumption the maximum average EIRP is


32 dBW/MHz + 10 log;, 20 MHz = 45 dBW




Thus, the waiver would yield an increase in peak EIRP of 13.1 dB.


In addition to the increase in power due to the signal bandwidth, the waiver if allowed will

probably increase peak EIRP even further. This is due to its proposal to remove limitations on

modulation. While standard GSM uses constant envelope modulation in the downlink, this is not

likely to be true if other modulations are adopted. For example OFDM modulation, if used,

                                                3


would lead to a peak—to—average power ratio in excess of 10 dB, and multi—carrier W—CDMA

could be similar. Notwithstanding this, the analysis in this annex uses the average power, even

though the nonzero peak—to—average power ratio is expected to increase the impact of both

overload and intermodulation interference.




3     Overload Interference Range Expansion


3.1   Overload Signal Levels

In FCC 05—30, the FCC concluded "that Inmarsat receivers can tolerate another 8 dB increase in

power when the interfering signal is more than approximately two megahertz removed from the

desired signal." The FCC also noted that "in cases where the interfering signal is less than

approximately two megahertz removed from the desired signal, our assumption of Inmarsat MET

receiver tolerance of —60 dBm was correct." SkyWave‘s forward links could be at any frequency

in the MSS L—band, either within 2 MHz of an ATC signal or with greater frequency separation.

Because of this, link budgets and interference ranges are computed here using assumed overload

interference signal limits of both —52 dBm and —60 dBm, to demonstrate the impact of increased

overload interference due to SkyTerra‘s requested waivers both within and outside 2 MHz of

ATC signals.


3.2    Path loss versus Range Computation

The propagation models used to compute range—path loss relationships (other than free space

propagation) were downloaded from the NIST website at

http://w3 .antd.nist.gov/wetg/manet/prd_propcale.html. The significant model parameters used

were: ATC BTS signal frequency of 1545 MHz, basestation height of 30 meters, MET height of

2.5 meters.


The propagation model used for urban environments was the Hata large city model. In the

overload interference analysis of FCC 03—15, Appendix C2, the FCC adopted a path loss of 86

dB at 100 meters.‘ The precise model that was used to derive this path loss was not made

explicit. Rather than attempt to guess the exact model (along with its parameters) that was used

by the FCC, we have used the Hata large city model which computes a path loss at 100 meters

range of 95.4 dB, significantly higher than the FCC value of 86 dB. Because of this the impact of

SkyTerra‘s proposed waiver of the FCC rule on the ATC downlink induced MET overload

interference is understated (and therefore favorable to SkyTerra) in this analysis for urban

propagation environments, when compared to what would be expected if the FCC‘s model was

applied.


Two propagation models are used for suburban environments: the WI—LOS model and free space

propagation.


3.3    Urban Environment

Four link budget versions are included here. The variations on the link budget are:


        Link Budget                    Total Peak EIRP per sector         Interference limit

               A                                 31.9 dBW                      —52 dBm

               B                                 45.0 dBW                      —52 dBm

               C                                 31.9 dBW                      —60 dBm

              D                                 45.0 dBW                       —60 dBm


      Table 3.3—1 Urban Environment Link Budget Variations — Overload Interference




‘ See FCC 03—15, Appendix C2, sections 1.6 and 2.2.1.1


 For urban propagation, the FCC‘s assumptions from FCC 03—15 on power control, voice

 activation, polarization, MET gain, and BTS gain have been adopted without changes*. This is

 because the elevation angle of the BTS with respect to the MET is expected to be similar to the

25° assumed by the FCC.


The link budgets are shown below:


            Parameter                    Units   Link A       Link B        Link C       Link D

      Total EIRP per sector              dBW      31.9         45.0          31.9         45.0

BS to MET Propagation Loss                dB      84.2         97.3          92.2         105.3

         Power Control                    dB      5.2           5.2          5.2             5.2

        Voice Activation                  dB      4.0           4.0          4.0           4.0

      Polarization Isolation              dB      8.0           8.0          8.0           8.0

        MET Gain to BS                    dB       0             0            0              0

        BS Gain to MET                    dB     —12.5         —12.5        —12.5         —12.5

     Received Interference               dBW      —82           —82          —90          —90

        Saturation Level                 dBW      —82          —82           —90          ~90

        Saturation Level                 dBm      —52          —52           —60          —60

             Margin                       dB       0            0             0              0

            Distance                      m       51           113           81           191


            Table 3.3—2 Urban Environment Link Budgets — Overload Interference

Link budgets A and C show the interference ranges at the current peak EIRP, for saturation

levels of —52 and —60 dBm respectively. Link budgets B and D show the interference ranges at an

EIRP of 45 dBW, for saturation levels of —52 and —60 dBm respectively. As can be seen, for


* See FCC 03—15, Appendix C2, section 2.2.1.1.


MET‘s operating at both less than and greater than 2 MHz spacing from the ATC BTS downlink,

the predicted interference range approximately doubles when compared to the interference range

with the current peak EIRP.


With this analysis, we have shown that even with a much more conservative propagation model

than that used by the FCC in its overload interference analysis, the area around each urban ATC

BTS affected by overload interference is expected to increase to 0.04 km" and 0.1 1 km"

respectively for terminals separated by more than and less than 2 MHz from ATC BTS downlink

signals.


3.4   Suburban Environment

Link budget assumptions for suburban environments are somewhat different than those for urban

environments. The elevation of the BTS with respect to the MET is low, between 0—5°. At this

elevation angle, the BS antenna discrimination is no longer —12.5 dB. Comparing the regulations

of 25.253(d) (1) and (2), and also 25.253(d) (3) and (4), a figure of —5 dB is used as the BS

antenna discrimination for low elevation. In addition, the terminal gain and polarization isolation

will change with the lower elevation angle. SkyWave MET‘s are used in applications requiring

low cost and low profile, because of which single microstrip patch antennas are used. These

antennas have high axial ratios at low elevation angles and approach linear polarization. Because

of this, a figure of 1 dB is used for polarization discrimination. The gain of the patches at low

elevation is also low, —7 dBic for elevations of 0°.


Four link budget versions are included here, as in the previous section. The variations on the link

budget are identical to the urban propagation section:


         Link Budget              Total Peak EIRP per sector               Interference limit

               A                           31.9 dBW                            —52 dBm

               B                           45.0 dBW                            —52 dBm

               C                           31.9 dBW                            —60 dBm

               D                           45.0 dBW                            —60 dBm



   Table 3.4—1 Suburban Environment Link Budget Variations — Overload Interference




As previously noted, the WI—LOS and free space models are used to compute propagation ranges

from the required link budget path losses below. The ranges for the two models are included in

separate rows in the link budget; however the path losses in both cases are identical as required

to close the budgets. Free space ranges are computed as follows:


         L—28 logia f—3245
D = 10          20




in which D is the distance in km, L the path loss in dB and f the frequency in MHz.


The link budgets are shown below:


           Parameter               Units         Link A          Link B   Link C       Link D

     Total EIRP per sector         dBW            31.9            45.0     31.9          45.0

BS to MET Propagation Loss          dB            91.7           104.8     99.7         112.8

        Power Control               dB             5.2            5.2       5.2          5.2

       Voice Activation             dB            4.0             4.0       4.0          4.0

     Polarization Isolation         dB             1.0            1.0       1.0          1.0

       MET Gain to BS               dB            —7.0            —7.0     —7.0          —7.0

       BS Gain to MET               dB            —5.0            —5.0     —5.0          —5.0

    Received Interference          dBW            —82             —82       —90          —90

       Saturation Level            dBW            —82             —82       —90          —90

       Saturation Level            dBm            —52             —52       —60          —60

            Margin                  dB             0               0         0            0

  Distance (WI—LOS model)            m            270             870      550          1740

 Distance (free space model)         m            590            2680      1490         6240


         Table 3.4—2 Suburban Environment Link Budgets — Overload Interference




As can be seen from the propagation ranges, with the increased EIRP requested in the SkyTerra

Modification, the ranges from each ATC BTS in which service to SkyWave MET‘s is interrupted

by downlink overload interference will increase substantially.


With this analysis, we have shown that the area around each suburban ATC BTS affected by

overload interference is expected to increase from the 0.03 km* assumed by the FCC in their

analysis (i.e. 100 m interference range) to 2.4 km* and 22.6 km" respectively with WI—LOS and

free space propagation, for terminals separated by more than 2 MHz from ATC BTS downlink


signals. For terminals separated by less than 2 MHz from ATC BTS downlink signals, the area

around each suburban ATC BTS affected by overload interference is expected to increase to 9.5

km* and 122.3 km", depending on whether propagation follows the WI—LOS model or free space

propagation.



4     Intermodulation


4.1    Introduction

With the use of narrowband modulation and a limited number of carriers with cellular frequency

reuse, ATC BTS intermodulation interference to another service operating in the MSS L—band

would only be expected to occur in some fraction of the ATC BTS cells. This is because the

frequencies of the ATC downlink signals and interfered MSS service would have to line up so

that the intermodulation interference falls within the band of the interfered MSS L—band forward

link signal. While this might be true in one ATC cell, another (adjacent, for example) ATC cell

would in general be expected to have a different set of downlink frequencies and intermodulation

interference to the other MSS service might not occur. With broadband modulations on the ATC

downlinks, the intermodulation bandwidth will be widened as well, covering as much or even

more than the entire MSS L—band. Intermodulation interference would be more ubiquitous,

potentially interfering with a given MSS service in every ATC cell rather than a subset. Because

of this, intermodulation deserves close attention in the context of broadband ATC downlink

modulation.


4.2   Interfering Intermodulation Signal Levels

In this section an interfering intermodulation signal level is estimated for broader band signals

than GSM, based on the FCC‘s measurements of FCC 05—30 Appendix A. In particular, two 10

                                                 10


MHz downlink signals are assumed. In line with the FCC‘s overload interference approach, the

interfering signal level is based on the worst case of the 4 terminals tested by the FCC: the one

labeled Inmarsat Terminal A.


The FCC‘s measurements of intermodulation interference showed very little impact of signal

bandwidth on interfering signal level. From figure 5 in FCC 05—30 Appendix A for Inmarsat

Terminal A, across most of the spectrum the cdma2000 signal has a measured interfering level of

—66.5 dBm while the GSM measured interfering signal varies with an average over 1540—1558 of

—69 dBm. With signal bandwidths of 1250 and 200 kHz respectively, the relationship of

interfering signal level to signal bandwidth can then be estimated as


                                    SL = —76.2 + 314log;, BW

(with SL being interfering intermodulation signal level in dBm, inclusive of both signals, and

BW being the bandwidth of each interfering signal in kHz). Only the GSM and cdma2000

interfering levels were used to compute this linear relationship because CW interference is a

special case, being narrower than the Inmarsat signal bandwidth of 40 kHz, while

intermodulation from the GSM and ecdma2000 signals are expected to be 600 kHz and 3750 kHz

wide respectively.


This equation predicts an interfering signal level of —63.6 dBm for intermodulation interference

from two 10 MHz signals. Note that this is the aggregated signal level from both intermodulating

signals; with 2 intermodulating signals it is the total signal level received from the BTS

downlink. It should be noted that this level is higher than the notification and coordination

threshold of —70 dBm set in section 25.253(h). Basing the analysis on —63.6 dBm rather than —70

dBm reduces the estimated impact of intermodulation and so is favorable to Skyterra.


                                                 11


4.3     Urban Intermodulation Interference Range

In this section the urban intermodulation interference range is computed based on two 10 MHz

interfering signals with a total BTS EIRP of 45 dBW, and an interfering intermodulation signal

level of —63.6 dBm. As in section 3.3, the Hata large city propagation model is used.


                                Parameter                Units          Value

                          Total EIRP per sector          dBW            45.0

                     BS to MET Propagation Loss           dB            108.9

                             Power Control                dB             5.2

                            Voice Activation              dB             4.0

                          Polarization Isolation          dB             8.0

                            MET Gain to BS                dB              0

                            BS Gain to MET                dB            —12.5

                         Received Interference           dBW            —93.6

                           Interference Level            dBW            —93.6

                           Interference Level            dBm            —63.6

                                 Margin                   dB              0

                                Distance                  m             242


       Table 4.3—1 Urban Environment Link Budget — Intermodulation Interference

As can be seen, the interference range from broadband intermodulation is predicted to be

significantly larger than that from downlink overload interference. It is substantially larger than

the 100 meter range used by the FCC for overload interference computation, even though the

propagation model generates higher path loss versus distance.




                                                   12


With this analysis, we have shown that even with a much more conservative propagation model

than that used by the FCC in its overload interference analysis, the area around each urban ATC

BTS affected by intermodulation interference is expected to be approximately 0.18 km*.




4.4     Suburban Intermodulation Interference Range

In this section the suburban intermodulation interference range is computed based on two 10

MHz interfering signals with a total BTS EIRP of 45 dBW, and an interfering intermodulation

signal level of —63.6 dBm. As in section 3.4, WI—LOS and free space propagation models are

used.




                                              13


                               Parameter                Units         Value

                         Total EIRP per sector          dBW            45.0

                     BS to MET Propagation Loss          dB           116.4

                             Power Control               dB            5.2

                           Voice Activation              dB            4.0

                         Polarization Isolation          dB             1.0

                           MET Gain to BS                dB            —7.0

                           BS Gain to MET                dB            —5.0

                         Received Interference          dBW           —93.6

                            Saturation Level            dBW           —93.6

                           Saturation Level             dBm           —63.6

                                Margin                   dB             0

                      Distance (WI—LOS model)            m            2430

                     Distance (free space model)         m            10200


      Table 4.4—1 Suburban Environment Link Budget — Intermodulation Interference

With this analysis, we have shown that the area around each suburban ATC BTS affected by

intermodulation interference is expected to be 18.6 km" and 326.9 km*, depending on whether

propagation follows the WI—LOS model or free space propagation. This is significantly larger

than the 0.03 km* assumed by the FCC in their overload interference analysis.



5    Interference Monitoring Cost

The FCC Rules, 47 C.F.R.§25.255, require the MSS ATC operator to resolve any harmful

interference to other services caused by ATC operations. If interference is very infrequent then

no regular monitoring by SkyWave of ATC induced interference is likely to be necessary. With

                                                  14


both downlink overload and intermodulation interference ranges increasing significantly

especially, in suburban areas, and with intermodulation potentially occurring into SkyWave‘s

MSS downlink in every ATC cell, the likelihood of interference to SkyWave‘s MET‘s is

increased immensely. In this case, surveillance of ATC induced interference to SkyWave‘s MSS

will become necessary.


Interference into SkyWave‘s MSS forward link will be difficult to detect remotely. Terminals

operate intermittently rather than continuously, with widely variable duty cycles, sending

messages as infrequently as once per day or as frequently as once every few minutes. If a

terminal lost reception of its forward link due to interference, the back—office would not be able

to determine this; the terminal would merely be muted. The terminal itself would not have the

capability to determine whether it was being blocked by interference or by physical blockage

such as a mountain or parking garage deck.


Because of the inability to remotely diagnose interference issues, and with a large increase in the

probability of interference to SkyWave MET‘s, a regular program offield testing would be

required with substantial cost to SkyWave.




6     General Specifications Replaced with Aeronautical Specifications


6.1    EIRP

In section I(B)(1) of the Modification, SkyTerra references "sections 25.253(d)(1)—(4) of the L—

band ATC rules", and in a related waiver request "proposes that the total PFD from BTS

emissions in the 1.5 GHz band, calculated to be receivable at an aeronautical receiver at an


                                                15


altitude of at least 100 meters from the Earth‘s surface, be limited to —26.8 dBW/m*..." We

believe that SkyTerra is requesting this waiver as a replacement for 25.253(d)(2) and (4) which

control the peak EIRP towards the horizon in the bands 1525—1541.5 MHz/1547.5—1559 MHz

and 1541.5—1547.5 MHz respectively. If this is true, then the proposed modification replaces

general specifications which control the peak EIRP towards the horizon with ones specific to

aviation terminals above the Earth only and not necessarily controlling EIRP towards the

horizon.


This is of significance to SkyWave because the low elevation (i.e. horizontal) EIRP will have a

direct impact on interference in suburban environments, as previously outlined in sections 3.4

and 4.4, and also in open environments. Without a specific limit the long range line of sight

impact to Sky Wave‘s land mobile terminals cannot be predicted, and would not be controlled by

the regulations.


6.2    Out of Channel Emissions

In section I(B)(3) of the Modification, SkyTerra proposes that the FCC waive the rule of

25,253(b), modifying its generally applicable OOCE limit with proposed location—specific PFSD

limits for airports and navigable waterways as well as a non—location—specific proposed

modification:


      (1) the total power flux spectral density (PFSD) from BTS emissions in the 1.5 GHz

      band that are calculated to be receivable at an aeronautical receiver at an altitude

      of 100 meters or greater from Earth‘s surface shall not exceed —187.27 dBW/m—Hz

      at a spectral offset of2 MHzfrom the nominal edge ofspectrum usedfor ATC;




                                               16


The proposed change replaces the general OOCE limit of 23.253(b) with one that is specific to

aviation terminals and does not necessarily control OOCE to land mobile terminals.


This is of significance to SkyWave because its terminals will be susceptible to interference from

out—of—channel emissions. Without a specific limit the out of channel emissions from ATC BTS

to SkyWave terminals cannot be predicted, and would not be bounded by the regulations.




                                               17



Document Created: 2009-07-10 17:08:16
Document Modified: 2009-07-10 17:08:16