Test Report (DFS)

FCC ID: XKB-L2500CL3GWIBT

Test Report

Download: PDF
FCCID_3340176

                                           FCC PART 15.407
                  DYNAMIC FREQUENCY SELECTION
                                             TEST REPORT
                                                              For

                                                  INGENICO
               9 Avenue de la Gare-Rolvatain TGV, BP 25156, Valence Cedex 9,France


                                FCC ID: XKB-L2500CL3GWIBT


            Report Type:                                   Product Name:
            Class II permissive change                     Link/2500




                   Test Engineer:         Edison Hu


                 Report Number:           RXM161124051-00A1


                      Report Date:        2017-03-21

                                          Oscar Ye

                     Reviewed By:         Engineer

                Test Laboratory:          Bay Area Compliance Laboratories Corp. (Kunshan)
                                          No.248 Chenghu Road,Kunshan,
                                          Jiangsu province,China
                                          Tel: +86-0512-86175000
                                          Fax: +86-0512-88934268
                                          www.baclcorp.com.cn




Note: This test report is prepared for the customer shown above and for the device described herein. It may not be duplicated or
used in part without prior written consent from Bay Area Compliance Laboratories Corp. (Kunshan). This report is valid only
with a valid digital signature. The digital signature may be available only under the Adobe software above version 7.0.


 Bay Area Compliance Laboratories Corp. (Kunshan)                                                                  Report No.: RXM161124051-00A1




                                                      TABLE OF CONTENTS

GENERAL INFORMATION .......................................................................................................................................3
 PRODUCT DESCRIPTION FOR EQUIPMENT UNDER TEST (EUT) .....................................................................................3
 OBJECTIVE ...................................................................................................................................................................3
 RELATED SUBMITTAL(S)/GRANT(S) .............................................................................................................................3
 TEST METHODOLOGY ..................................................................................................................................................3
 TEST FACILITY .............................................................................................................................................................4
SYSTEM TEST CONFIGURATION ..........................................................................................................................5
  DESCRIPTION OF TEST CONFIGURATION ......................................................................................................................5
  EUT EXERCISE SOFTWARE ..........................................................................................................................................5
  EQUIPMENT MODIFICATIONS .......................................................................................................................................5
  SUPPORT EQUIPMENT LIST AND DETAILS ....................................................................................................................5
  EXTERNAL CABLE........................................................................................................................................................5
SUMMARY OF TEST RESULTS ...............................................................................................................................6
APPLICABLE STANDARDS........................................................................................................................................7
  DFS REQUIREMENT .....................................................................................................................................................7
  DFS MEASUREMENT SYSTEM ....................................................................................................................................11
  SYSTEM BLOCK DIAGRAM .........................................................................................................................................11
  CONDUCTED METHOD ...............................................................................................................................................12
  RADIATED METHOD ...................................................................................................................................................13
  TEST PROCEDURE ......................................................................................................................................................13
TEST RESULTS ..........................................................................................................................................................14
  DESCRIPTION OF EUT ................................................................................................................................................14
  TEST EQUIPMENT LIST AND DETAILS .........................................................................................................................14
  RADAR WAVEFORM CALIBRATION ............................................................................................................................15
  TEST ENVIRONMENTAL CONDITIONS .........................................................................................................................15
CHANNEL MOVE TIME AND CHANNEL CLOSING TRANSMISSION TIME .............................................17
 TEST PROCEDURE ......................................................................................................................................................17
 TEST RESULTS ...........................................................................................................................................................17




FCC Part 15.407 DFS Test Report                                                                                                                        Page 2 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                          Report No.: RXM161124051-00A1

GENERAL INFORMATION
Product Description for Equipment under Test (EUT)
The INGENICO’s product, model number: LINK/2500 CL/3G/WiFi/BT (FCC ID: XKB-L2500C
L3GWIBT) (or "EUT”) in this report is a Link/2500, which was measured approximately: 12.8 cm (L) x
7.0 cm (W) x 1.7cm (H), rated input voltage: DC 3.7V from rechargeable Li-ion battery or DC 5V from
adapter. The device is a client device.

Adapter information:
MODEL: PSA105R-050QL6
INPUT: 100-240V ~ 0.3A 50-60Hz 11-15VA
OUTPUT: DC 5V, 1.0A MAX

*All measurement and test data in this report was gathered from production sample serial number: 20161124051.
(Assigned by the BACL. The EUT supplied by the applicant was received on 2016-11-25)


Objective
This report is prepared on behalf of INGENICO in accordance with Part 2-Subpart J, Part 15-Subparts A,
B and E of the Federal Communications Commission’s rules.

The tests were performed in order to determine compliance with FCC Part 15.407 rules.

This is the Class II Permissive Change application of the device. The difference between the original
device and the current one is as follows:

1. Add the frequency band: 5250~5350 MHz, 5470~5725 MHz.

The change made to the device affected all the test results, so we updated all test datas, EUT photos were
copied from the report number RXM160823052-00F with FCC ID: XKB-L2500CL3GWIBT.


Related Submittal(s)/Grant(s)
Original submission with FCC ID: XKB-L2500CL3GWIBT which was granted on 2016-10-04.


Test Methodology
FCC KDB 905462 D02 UNII DFS Compliance Procedures New Rules v02
FCC KDB 905462 D03 Client Without DFS New Rules v01r02




FCC Part 15.407 DFS Test Report                                                                  Page 3 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                        Report No.: RXM161124051-00A1

Test Facility
The test site used by Bay Area Compliance Laboratories Corp. (Kunshan) to collect test data is located on
No.248 Chenghu Road, Kunshan, Jiangsu province, China.

Test site at Bay Area Compliance Laboratories Corp. (Kunshan) has been fully described in reports
submitted to the Federal Communication Commission (FCC). The details of these reports have been
found to be in compliance with the requirements of Section 2.948 of the FCC Rules on November 06,
2014. The facility also complies with the radiated and AC line conducted test site criteria set forth in
ANSI C63.4.

The Federal Communications Commission has the reports on file and is listed under FCC Registration
No.: 815570. The test site has been approved by the FCC for public use and is listed in the FCC Public
Access Link (PAL) database.




FCC Part 15.407 DFS Test Report                                                                Page 4 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                      Report No.: RXM161124051-00A1

SYSTEM TEST CONFIGURATION
Description of Test Configuration
The EUT was configured for testing in an engineering mode which was provided by the manufacturer.


EUT Exercise Software
No software was used in test.


Equipment Modifications
N/A


Support Equipment List and Details

          Manufacturer                Description             Model               Serial Number
                                                          EchoLife
             Huawei                  Wireless Router                                    /
                                                          HG8245Q
              Dell                       Laptop               E6410                     /

Note: the Wirless Router FCC ID: QISHG8245Q

External Cable

                          Shielding                    Length
      Cable Description                 Ferrite Core                  From Port              To
                            Type                        (m)
         RJ45 Cable             No           No         1.5             Router              Laptop




FCC Part 15.407 DFS Test Report                                                             Page 5 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                            Report No.: RXM161124051-00A1


SUMMARY OF TEST RESULTS
The following result table represents the list of measurements required under the CFR §47 Part 15.407(h),
and KDB: 905462 D02 UNII DFS Compliance Procedures New Rules v02 and KDB 905462 D03 Client
Without DFS New Rules v01r02

            Items                             Description of Test                         Result

          Detection
                                           UNII Detection Bandwidth                    Not Applicable
          Bandwidth

                                  Initial Channel Availability Check Time (CAC)        Not Applicable
         Performance
         Requirements                Radar Burst at the Beginning of the CAC           Not Applicable
            Check
                                        Radar Burst at the End of the CAC              Not Applicable

                                              Channel Move Time                          Compliant
          In-Service
                                       Channel Closing Transmission Time                 Compliant
          Monitoring
                                             Non-Occupancy Period                        Compliant

       Radar Detection                    Statistical Performance Check                Not Applicable




FCC Part 15.407 DFS Test Report                                                                 Page 6 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)      Report No.: RXM161124051-00A1

APPLICABLE STANDARDS
DFS Requirement

CFR §47 Part 15.407(h)

FCC KDB 905462 D02 UNII DFS Compliance Procedures New Rules v02




FCC Part 15.407 DFS Test Report                                          Page 7 of 24


   Table 3: DFS Detection Thresholds for Master Devices and Client Devices With Radlar
                                              Detection
Mazimum Transmit Power                                            Value
                                                                  (See Notes 1. 2. and 3)
EIRP 2 200 milliwat                                               61 dBm
EIRD 200 milliwat and                                             62 dBm
power spectral density < 10 dBmvMite
EIRP    200 milliwatt that do not meetthe power spectral          64 dBm
density requirement
Note 1: Thi is thelevel at ie mput of he eceiverassuming a 0 dreceive aneuna
Note 2: Throughouthesetet procedures anadditional 1 dB has been added to the amplitude of thtest
transmission waveforms to accourfor variations in measurement equipment. Thi will ensure that the
test signalis at oabove the detection threshold levelto igger a DFS response
NoteS: EIRP is based on the highest antenna gain. For MIMO devices refeto KDB Publication 66291 1
Dol



                         Table 4: DFS Response Requirement Values
Parameter                                                              Value
 Ton—occupancy period                                                  Minimum 30 minutes
Channel Availability Check Time                                        60 seconds
Channel Move Time                                                      10 seconds
                                                                       See Note1
Channel Closmg Transmission Time                                       200 mailliseconds > an
                                                                       agsregate of 60
                                                                       milliseconds over
                                                                       remaining 10 second
                                                                       period
                                                                       See Notes 1 and 2.
UNII Detection Bandwids                                                Minimum 100%of the U—
                                                                       NIT99%transmission
                                                                       power bandwidih. See
                                                                       Note 3.
Note T. Chamel Mow Te and the Chamel Clong Tramsmission Time should be performed with
Radar Type 0. The measurement timing beainsat the end ofthe Radar Type 0 bucst
Note The Channel Closing Pransmission Time is comprised. of 200 millieconds strting at
the beginaing of the Chamel Move ie plus anyadditional intermittent control signals required
to facilitate a Chamne! move (an agaregate of 60 milliseconds) during the remainder of the 10
second period. The ageregnte duration of control signals will not sount quiet periods in between
transmissions
Note 3: During the U—NZIDorection Bandwidth detection test,radar type 0 should be used. For
each frequency step the minimum percentage of detection is 90 percent. Measurements are
performedwith no data traffic


Bay Area Compliance Laboratories Corp. (Kunshan)   Report No.: RXM161124051-00A1




FCC Part 15.407 DFS Test Report                                       Page 9 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)   Report No.: RXM161124051-00A1




FCC Part 15.407 DFS Test Report                                       Page 10 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                 Report No.: RXM161124051-00A1




DFS Measurement System
BACL DFS measurement system consists of two subsystems: (1) The radar signal generating subsystem
and (2) the traffic monitoring subsystem.


System Block Diagram




FCC Part 15.407 DFS Test Report                                                       Page 11 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                    Report No.: RXM161124051-00A1

Conducted Method




                            Setup for Master with injection at the Master




                             Setup for Client with injection at the Master




FCC Part 15.407 DFS Test Report                                                        Page 12 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                    Report No.: RXM161124051-00A1




                             Setup for Client with injection at the Client


Radiated Method




Test Procedure
A spectrum analyzer is used as a monitor verifies that the EUT status including Channel Closing
Transmission Time and Channel Move Time, and does not transmit on a Channel during the Non-
Occupancy Period after the diction and Channel move. It is also used to monitor EUT transmissions
during the Channel Availability Check Time.




FCC Part 15.407 DFS Test Report                                                           Page 13 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                             Report No.: RXM161124051-00A1

TEST RESULTS
Description of EUT
The EUT operates in 5250-5350 MHz and 5470-5725 MHz range.

The maximum EIRP of the master is 21.92dBm<23 dBm, Therefore the required interference
threshold level is -62 dBm, the required radiated threshold at antenna port is -62dBm.

The calibrated radiated DFS detection threshold level was set to -64 dBm, which was more stringent.

WLAN traffic is generated by Laptop, The data streamed from the Access Point to the EUT.


Test Equipment List and Details

                                                                      Serial      Calibration    Calibration
       Manufacturer             Description           Model
                                                                     Number          Date         Due Date
     Rohde & Schwarz        OSP120 BASE UNIT         OSP120          101247        2016-07-04    2017-07-03
                                 SIGNAL
     Rohde & Schwarz                                  FSV40          101116        2016-07-04    2017-07-03
                               ANALYZER
                             VECTOR SIGNAL
     Rohde & Schwarz                               SMBV100A          261558        2016-07-04    2017-07-03
                              GENERATOR
                                SIGNAL
     Rohde & Schwarz                                SMB100A          110390        2016-07-04    2017-07-03
                              GENERATOR
     Rohde & Schwarz        OSP120 BASE UNIT         OSP120          101247        2016-07-04    2017-07-03
                                                     ZX10-2-
        Mini-circuits         Splitter/Combiner                        N/A            N/A            N/A
                                                      1252+
            ETS                Horn Antenna            3115            6229        2016-01-11    2019-01-10

            ETS                Horn Antenna            3115         00066542          N/A            N/A

           Agilent           Spectrum Analyzer       E4440A        SG43360054      2016-12-08     2017-12-08

Note: E4440A was used for Non-Occupancy Period test in 2017-03-15.

* Statement of Traceability: Bay Area Compliance Laboratories Corp. (Kunshan) attests that all calibrations have
been performed, traceable to National Primary Standards and International System of Units (SI).




FCC Part 15.407 DFS Test Report                                                                    Page 14 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                        Report No.: RXM161124051-00A1

Radar Waveform Calibration




Test Environmental Conditions

              Temperature:         26.1~26.3 °C
         Relative Humidity:          32~41 %
            ATM Pressure:         100.8~101.1 kPa

     The testing was performed by Edison Hu from 2016-12-07 to 2017-03-15.

Plots of Radar Waveforms




FCC Part 15.407 DFS Test Report                                                            Page 15 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)           Report No.: RXM161124051-00A1

5280 MHz:
                                            Radar Type 0




                Date:7.DEC.2016 15:08:42




5500 MHz:
                                            Radar Type 0




                Date:12.DEC.2016 19:59:40




FCC Part 15.407 DFS Test Report                                               Page 16 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                     Report No.: RXM161124051-00A1


CHANNEL MOVE TIME AND CHANNEL CLOSING TRANSMISSION
TIME
Test Procedure
Perform type 0 short pulse radar waveform, repeat using a long pulse radar type5 waveform.
The aggregate channel closing transmission time is calculated as follows:

Aggregate Transmission Time = N*Dwell Time

N is the number of spectrum analyzer bins showing a device transmission Dwell Time is the dwell time
per bin (i.e. Dwell Time = S/B, S is the sweep time and B is the number of bin, i.e. 8192)


Test Results

                 Frequency        Bandwidth
                                                   Radar Type              Results
                   (MHz)            (MHz)

                    5270              40             Type 0               Compliant
                    5510              40             Type 0               Compliant

Please refer to the following tables and plots.




FCC Part 15.407 DFS Test Report                                                              Page 17 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)              Report No.: RXM161124051-00A1

5270 MHz
Type 0 radar channel move time result:

                                                                          Limit
                                  Item             Time (s)
                                                                           (s)
                      Closing Move Time             <<10                   10




                Date:12.DEC.2016 19:37:36




FCC Part 15.407 DFS Test Report                                                   Page 18 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                    Report No.: RXM161124051-00A1

Type0 radar channel closing transmission time result:

                                                                                Limit
                           Item                         Time (ms)
                                                                                (ms)
            Channel Closing Transmission Time             16.87                  200
         Aggregate Transmission Time after 200ms          3.75                    60




FCC Part 15.407 DFS Test Report                                                         Page 19 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)   Report No.: RXM161124051-00A1

5510 MHz
Type 0 radar channel move time result:




                Date:12.DEC.2016 19:46:14




FCC Part 15.407 DFS Test Report                                       Page 20 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                    Report No.: RXM161124051-00A1

Type0 radar channel closing transmission time result:

                                                                                Limit
                           Item                         Time (ms)
                                                                                (ms)
                Closing Transmission Time                 9.37                   200
         Aggregate Transmission Time after 200ms          1.87                    60




FCC Part 15.407 DFS Test Report                                                         Page 21 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)                    Report No.: RXM161124051-00A1
NON-OCCUPANCY PERIOD
Test Procedure
Measure the EUT for more than 30 minutes following the channel close/move time to very that the EUT
does not resume any transmissions on this channel. Provide one plot to demonstrate no transmission on
the channel for the non-occupancy period (30 minutes observation time)


Test Result

                                               Bandwidth
              Frequency(MHz)                                        Spectrum Analyzer Display
                                                 (MHz)

                    5270                           40            No transmission within 30 minutes

                    5510                           40            No transmission within 30 minutes

     Please refer to the following plots.




FCC Part 15.407 DFS Test Report                                                            Page 22 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)          Report No.: RXM161124051-00A1


                                               5270 MHz




                                             30 minutes




                                               5510 MHz




                                           30 minutes




FCC Part 15.407 DFS Test Report                                              Page 23 of 24


Bay Area Compliance Laboratories Corp. (Kunshan)          Report No.: RXM161124051-00A1
APPENDIX A - TEST SETUP PHOTOGRAPHS

                       Master                                 Client-EUT




                                  ***** END OF REPORT *****




FCC Part 15.407 DFS Test Report                                              Page 24 of 24



Document Created: 2017-12-28 16:55:14
Document Modified: 2017-12-28 16:55:14

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC