Experimental Licensing System

0595-EX-ST-2016

San Jose State University

Experimental Licensing System filing 0595-EX-ST-2016 submitted by San Jose State University.

Filing overview

StatusDenied/Dismissed
Call signN/A
Date filed2016-04-25
Status date2016-06-27
FCC sourceView the FCC filing record

Special Temporary Authority application - Address

Attention:
Ali Guarneros Luna
City:
Mountain View
E-Mail Address:
ali.guarnerosluna@nasa.gov
State:
CA
Street Address:
67 N Akron Dr PO Box 122
Zip Code:
94035

Special Temporary Authority application - Applicant Name

Name of Applicant:
San Jose State University

Special Temporary Authority application - Best Contact

First Name:
Richard
Last Name:
Morrison
Phone Number:
408 429 4166
Title:
Communications Coordinator

Special Temporary Authority application - Certification

Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2016-04-25 00:00:00.0
Signature of Applicant (Authorized person filing form):
Richard Morrison
Title of Applicant (if any):
Communications Coordinator

Special Temporary Authority application - Explanation

Please explain in the area below why an STA is necessary:
Please explain in the area below why an STA is necessary: An STA is necessary to transmit with two Iridium modems and to test a wifi down link from a low earth orbit (51 deg inclination). All transmitter are FCC certified for terrestrial use but orbit use is experimental.

Special Temporary Authority application - Information

Class of Station:
MO
Nature of Service:
Experimental

Special Temporary Authority application - Initial values - Explanation

Please explain in the area below why an STA is necessary:
Please explain in the area below why an STA is necessary: An STA is necessary to transmit with two Iridium modems.

Special Temporary Authority application - Initial values - Manufacturer

Equipment 1 Manufacturer
iridium
Equipment 2 Manufacturer
etekcity Wireless USB adapter Trans

Special Temporary Authority application - Initial values - Purpose of Operation

Please explain the purpose of operation:
Demonstration of the Exo-Brake and demonstrating the viability of the Iridium 9602 communication module. The Technical Education Satellite 5 (TechEdSat-5) will test and validate two different technologies in Low Earth Orbit (LEO): demonstration of the Exo-Brake and demonstrating the viability of the Iridium 9602 communication module. Transmission will begin 30 minutes after deployment from the ISS. The use of the Exo-Brake will deorbit the satellite in approximately 20 days after deployment from the ISS, thus concluding the mission.

Special Temporary Authority application - Manufacturer

Equipment 1 Experimental
No
Equipment 1 Manufacturer
iridium CFR47 Parts 2, 15, and 25
Equipment 1 Model Number
9602
Equipment 1 No. Of Units
2
Equipment 2 Experimental
No
Equipment 2 Manufacturer
Etekcity Wireless USB FCC ID: UQ2AW
Equipment 2 Model Number
SI-G5000UGL
Equipment 2 No. Of Units
1

Special Temporary Authority application - Purpose of Operation

Please explain the purpose of operation:
Demonstration of the Exo-Brake and demonstrating the viability of the Iridium 9602 communication modem for low earth orbit operation. The Technical Education Satellite 5 (TechEdSat-5) will test and validate two different communication technologies in Low Earth Orbit (LEO): demonstration of the wifi down link and demonstrating the viability of the Iridium 9602 communication module. Iridium transmission will begin 30 minutes after deployment from the ISS. Wifi transmitter will be active only for 10 min when over the Wallops Flight Facility ground station. The use of the Exo-Brake will deorbit the satellite in approximately 20 days after deployment from the ISS, thus concluding the mission.

Special Temporary Authority application - Requested Period of Operation

Operation End Date:
11/30/2016
Operation Start Date:
05/30/2016

Frequencies

ActionLower MHzUpper MHzClassOutput WERP WEmissionSignal
NewMO1.0000001.600000Puse Angle Modulated
NewMO0.7200000.720000DSSS
ModifiedMO0.7200001.00000020M0Q3DDSSS
ModifiedMO1.0000001.60000041K7Q7WQPSK
StateRadius of Operation

Sites

SiteLocationCoordinatesOperating areaCountyRadius
North WestLow Earth Orbit

Sources and provenance

SourceSource recordRetrievedMatch
ELS0595-EX-ST-20162026-07-30 08:57:11Source Primary
Selected field provenance
FieldDisplayed valueSourceObserved
StatusDenied/DismissedELS 0595-EX-ST-20162026-07-30 08:57:11
Applicant NameSan Jose State UniversityELS 0595-EX-ST-20162026-07-30 08:57:11
Call SignN/AELS 0595-EX-ST-20162026-07-30 08:57:11
Receipt Date2016-04-25ELS 0595-EX-ST-20162026-07-30 08:57:11
Status Date2016-06-27ELS 0595-EX-ST-20162026-07-30 08:57:11

Documents

DocumentTypeDateStatus
Dismissal Without Prejudice generated [Jun 27 2016]Correspondence2016-08-25Available
E-Mail generated [Apr 25 2016]Correspondence2016-04-25Available
E-Mail generated [Apr 25 2016]Correspondence2016-04-25Available