Toggle navigation
FCC.report
IBFS
ELS
FCC ID
Contact
About
FCC.report
›
ELS
›
Nextweb, Inc
›
0606-EX-ST-2018
Nextweb, Inc
0606-EX-ST-2018
Status: Granted
WM9XPX
2018-04-19
Documents and Communications:
[
refresh
]
Description
Category
Date
E-Mail generated [Apr 17 2018]
Correspondence
2018-04-17
Grant E-mail Notification generated [Apr 19 2018]
Correspondence
2018-04-19
TOWAIR Determination Clearance
Pre Coordination Document
2018-04-02
Letter of Consent and Support from Verizon
Pre Coordination Document
2018-04-02
Statement of Fee Exemption
Text Documents
2018-04-02
E-Mail generated [Apr 17 2018]
Correspondence
2018-04-17
Grant E-mail Notification generated [Apr 19 2018]
Correspondence
2018-04-19
TOWAIR Determination Clearance
Pre Coordination Document
2018-04-02
Letter of Consent and Support from Verizon
Pre Coordination Document
2018-04-02
Statement of Fee Exemption
Text Documents
2018-04-02
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY
Applicant Name
Name of Applicant:
Nextweb, Inc
Address
Attention:
Harish Bachuwar
Street Address:
55 Nicholson Lane
P.O. Box:
City:
San Jose
State:
CA
Zip Code:
95134
Country:
E-Mail Address:
[email protected]
Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:
Last Name:
Bachuwar
First Name:
Harish
Title:
RF Engineering Manager
Phone Number:
(408) 240-2468
Explanation
Please explain in the area below why an STA is necessary:
An STA is needed in order for TPx Communications to perform a 31GHz field trial in the San Francisco, CA area (BTA404).
Purpose of Operation
Please explain the purpose of operation:
The purpose is to test equipment and performance in the LMDS B-block. Verizon Wireless is planning their 5G network deployment in the LMDS A-block and is requesting that we relocate our current operations from the LMDS A-block to the LMDS B-block. This testing is needed prior to relocation.
Information
Callsign:
WM9XPX
Class of Station:
FX
Nature of Service:
Experimental
Requested Period of Operation
Operation Start Date:
04/16/2018
Operation End Date:
08/16/2018
Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:
Manufacturer
Model Number
No. Of Units
Experimental
CAMBRIDGE BROADBAND NETWORKS
VS600
5
No
Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form):
Michael Cowan
Title of Applicant (if any):
General Counsel
Date:
2018-04-02 00:00:00.0
Station Location
City
State
Latitude
Longitude
Mobile
Radius of Operation
Fremont
California
North 37 29 56
West 121 52 16
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
90.00
(b) Orientation in horizontal plane:
235.00
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
Yes
(a) Overall height above ground to tip of antenna in meters:
24.40
(b) Elevation of ground at antenna site above mean sea level in meters:
807.70
(c) Distance to nearest aircraft landing area in kilometers:
14.80
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Per the TOWAIR determination, "Structure does not require registration. There are no airports within 8 kilometers (5 miles) of the coordinates you provided."
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31265.00000000-31275.00000000 MHz
FX
64.000000 mW 4.000000 W
P
0.00100000 %
10M0W7D
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31285.00000000-31295.00000000 MHz
FX
64.000000 mW 4.000000 W
P
0.00100000 %
10M0W7D
City
State
Latitude
Longitude
Mobile
Radius of Operation
Fremont
California
North 37 29 56
West 121 52 16
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
90.00
(b) Orientation in horizontal plane:
235.00
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
Yes
(a) Overall height above ground to tip of antenna in meters:
24.40
(b) Elevation of ground at antenna site above mean sea level in meters:
807.70
(c) Distance to nearest aircraft landing area in kilometers:
14.80
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Per the TOWAIR determination, "Structure does not require registration. There are no airports within 8 kilometers (5 miles) of the coordinates you provided."
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31265.00000000-31275.00000000 MHz
FX
64.000000 mW 4.000000 W
P
0.00100000 %
10M0W7D
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31285.00000000-31295.00000000 MHz
FX
64.000000 mW 4.000000 W
P
0.00100000 %
10M0W7D
City
State
Latitude
Longitude
Mobile
Radius of Operation
Fremont
California
North 37 29 29
West 121 55 52
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
1.10
(b) Orientation in horizontal plane:
81.00
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31040.00000000-31050.00000000 MHz
FX
64.000000 mW 1072.000000 W
P
0.00100000 %
10M0W7D
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31060.00000000-31070.00000000 MHz
FX
64.000000 mW 1072.000000 W
P
0.00100000 %
10M0W7D
City
State
Latitude
Longitude
Mobile
Radius of Operation
Fremont
California
North 37 29 20
West 121 56 48
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
1.10
(b) Orientation in horizontal plane:
81.00
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31040.00000000-31050.00000000 MHz
FX
64.000000 mW 1072.000000 W
P
0.00100000 %
10M0W7D
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31060.00000000-31070.00000000 MHz
FX
64.000000 mW 1072.000000 W
P
0.00100000 %
10M0W7D
City
State
Latitude
Longitude
Mobile
Radius of Operation
Milpitas
California
North 37 25 22
West 121 55 9
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
1.10
(b) Orientation in horizontal plane:
27.00
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31040.00000000-31050.00000000 MHz
FX
64.000000 mW 1072.000000 W
P
0.00100000 %
10M0W7D
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31060.00000000-31070.00000000 MHz
FX
64.000000 mW 1072.000000 W
P
0.00100000 %
10M0W7D
City
State
Latitude
Longitude
Mobile
Radius of Operation
Milpitas
California
North 37 25 22
West 121 55 9
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
0.90
(b) Orientation in horizontal plane:
27.00
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31040.00000000-31050.00000000 MHz
FX
64.000000 mW 2138.000000 W
P
0.00100000 %
10M0W7D
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
31060.00000000-31070.00000000 MHz
FX
64.000000 mW 2138.000000 W
P
0.00100000 %
10M0W7D
48779
© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC