Cisco Systems

0659-EX-ST-2013

Status: Grant Expired Due to New License

WG9XVY
2013-08-01

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Jul 25 2013]Correspondence2013-07-25
Grant E-mail Notification generated [Aug 2 2013]Correspondence2013-08-02
Experiement OverviewText Documents2013-07-19
Experiement OverviewText Documents2013-07-19
FirstNet Concurrence LetterText Documents2013-07-30
STA Request Letter to Julius KnappText Documents2013-07-25
STA Request Letter to Julius Knapp rev 2Text Documents2013-07-26
STA Request Letter to Julius Knapp rev 3Text Documents2013-07-26
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Cisco Systems

Address
Attention: David Case
Street Address: 4125 Highlander Parkway
P.O. Box:
City: Richfield
State: OH
Zip Code: 44720
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: McFadden
First Name: Kevin
Title: Solution Architect
Phone Number: 703-915-2904

Explanation
Please explain in the area below why an STA is necessary:
Demo equipment at 2013 APCO in California

Purpose of Operation
Please explain the purpose of operation:  Demo of Cisco backhaul equipment with LTE radio

Information
Callsign: WG9XVY
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 08/17/2013
Operation End Date: 08/21/2013

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
NEC MB4300 1 No
Elektrobit H3 2 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): David A Case
Title of Applicant (if any): Technical Leader
Date: 2013-07-11 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Anaheim California North  33  48  15 West  117  55  15 1.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 758.00000000-768.00000000 MHz FX N/A 1.000000 W 10M0F9W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 758.00000000-768.00000000 MHz FX N/A 1.000000 W 5M00F9W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 788.00000000-798.00000000 MHz FX N/A 1.000000 W 10M0F9W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 788.00000000-798.00000000 MHz FX N/A 1.000000 W 5M00F9W