Toggle navigation
FCC.report
IBFS
ELS
FCC ID
Contact
About
FCC.report
›
ELS
›
Analytical Space
›
1560-EX-ST-2019
Analytical Space
1560-EX-ST-2019
Status: Pending
WO9XBG
2019-08-23
Filing Notes:
Description
Date
New experimental on 401.24 - 401.36 MHz, 5.27 - 5.32 GHz, 5.49 - 5.54 GHz to test the FUSE experimental phased array communication antenna.
2019-04-25
New experimental on 401.24 - 401.36 MHz, 5.27 - 5.32 GHz, 5.49 - 5.54 GHz to test the FUSE experimental phased array communication antenna.
2019-04-25
Documents and Communications:
[
refresh
]
Description
Category
Date
Stop Buzzer
Text Documents
2019-08-23
Communications Plan
Text Documents
2019-08-23
Technical Description
Text Documents
2019-08-23
Discussion of STA Modification
Text Documents
2019-08-23
E-Mail generated [Aug 29 2019]
Correspondence
2019-08-29
E-Mail generated [Sep 9 2019]
Correspondence
2019-09-09
Incoming generated [Sep 5 2019]
Correspondence
2019-09-05
Incoming generated [Sep 26 2019]
Correspondence
2019-09-26
Grant E-mail Notification generated [Nov 26 2019]
Correspondence
2019-11-26
Bedford S Band Antenna Rad Pattern
Images
2019-09-26
Satellite S Band Antenna Rad Pattern
Images
2019-09-26
Bedford C Band Antenna Rad Pattern R1
Images
2019-09-26
Notice of Launch and Deploy
Post Grant Documents
2019-12-08
ODAR 2019 Signed
Text Documents
2019-09-05
EMC Analysis Sept 2019
Text Documents
2019-09-26
Ground Station Reference
Text Documents
2019-10-24
ITU Cost Recovery Letter 2019
Text Documents
2019-09-05
NOAA CRSRA License Waiver Letter
Text Documents
2019-08-24
Discussion of STA Modification R1
Text Documents
2019-10-04
Passive Receive Alpha Ops Documentation
Text Documents
2019-09-04
Notice of Termination
Post Grant Documents
2021-11-17
E-Mail generated [Aug 29 2019]
Correspondence
2019-08-29
E-Mail generated [Sep 9 2019]
Correspondence
2019-09-09
Incoming generated [Sep 5 2019]
Correspondence
2019-09-05
Incoming generated [Sep 26 2019]
Correspondence
2019-09-26
Grant E-mail Notification generated [Nov 26 2019]
Correspondence
2019-11-26
Bedford S Band Antenna Rad Pattern
Images
2019-09-26
Satellite S Band Antenna Rad Pattern
Images
2019-09-26
Bedford C Band Antenna Rad Pattern R1
Images
2019-09-26
Notice of Termination
Post Grant Documents
2021-11-17
Notice of Launch and Deploy
Post Grant Documents
2019-12-08
Stop Buzzer
Text Documents
2019-08-23
ODAR 2019 Signed
Text Documents
2019-09-05
Communications Plan
Text Documents
2019-08-23
Technical Description
Text Documents
2019-08-23
EMC Analysis Sept 2019
Text Documents
2019-09-26
Ground Station Reference
Text Documents
2019-10-24
ITU Cost Recovery Letter 2019
Text Documents
2019-09-05
Discussion of STA Modification
Text Documents
2019-08-23
NOAA CRSRA License Waiver Letter
Text Documents
2019-08-24
Discussion of STA Modification R1
Text Documents
2019-10-04
Passive Receive Alpha Ops Documentation
Text Documents
2019-09-04
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY
Applicant Name
Name of Applicant:
Analytical Space
Address
Attention:
Adam Wong
Street Address:
501 Massachusetts Ave.
P.O. Box:
City:
Cambridge
State:
MA
Zip Code:
02139
Country:
E-Mail Address:
[email protected]
Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:
Last Name:
Miller
First Name:
Mike
Title:
Licensing Coordinator
Phone Number:
(415)385-3842
Explanation
Please explain in the area below why an STA is necessary:
The STA is necessary to authorize operation of the radios on the Meshbed spacecraft, to obtain telemetry data about spacecraft operation, and to facilitate test operations of the FUSE experimental antenna.
Purpose of Operation
Please explain the purpose of operation:
The Purpose of Operation is to validate the Meshbed spacecraft bus, and to evaluate the performance of the experimental FUSE license.
Information
Callsign:
WO9XBG
Class of Station:
MO
Nature of Service:
Experimental
Requested Period of Operation
Operation Start Date:
11/01/2019
Operation End Date:
04/30/2020
Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:
Manufacturer
Model Number
No. Of Units
Experimental
GomSpace
100UL
1
No
GomSpace
TR-600
1
No
Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form):
Michael Miller
Title of Applicant (if any):
Licensing Coordinator
Date:
2019-08-23 00:00:00.0
Station Location
City
State
Latitude
Longitude
Mobile
Radius of Operation
North
West
LEO, 505 KM UHF
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
401.24000000-401.36000000 MHz
MO
1.000000 W 0.890000 W
P
0.00025000 %
114KG1D
GMSK
City
State
Latitude
Longitude
Mobile
Radius of Operation
North
West
LEO, 505 KM FUSE
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
Yes
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
2.39500000-2.45000000 GHz
MO
1.000000 W 6.100000 W
P
0.10000000 %
55M0F7D
Binary CPFSK
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
2.39500000-2.45000000 GHz
MO
1.000000 W 6.100000 W
P
0.10000000 %
5M00F7D
Binary CPFSK
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
5.27000000-5.32000000 GHz
MO
0.398000 W 11.600000 W
P
0.10000000 %
50M0F7D
Binary CPFSK
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
5.49000000-5.54000000 GHz
MO
0.200000 W 6.400000 W
P
0.10000000 %
50M0F7D
Binary CPFSK
23784
© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC