Analytical Space

1560-EX-ST-2019

Status: Pending

WO9XBG
2019-08-23

Filing Notes:

DescriptionDate
New experimental on 401.24 - 401.36 MHz, 5.27 - 5.32 GHz, 5.49 - 5.54 GHz to test the FUSE experimental phased array communication antenna. 2019-04-25

Documents and Communications: [refresh]

DescriptionCategoryDate
Stop BuzzerText Documents2019-08-23
Communications PlanText Documents2019-08-23
Technical DescriptionText Documents2019-08-23
Discussion of STA ModificationText Documents2019-08-23
E-Mail generated [Aug 29 2019]Correspondence2019-08-29
E-Mail generated [Sep 9 2019]Correspondence2019-09-09
Incoming generated [Sep 5 2019]Correspondence2019-09-05
Incoming generated [Sep 26 2019]Correspondence2019-09-26
Grant E-mail Notification generated [Nov 26 2019]Correspondence2019-11-26
Bedford S Band Antenna Rad PatternImages2019-09-26
Satellite S Band Antenna Rad PatternImages2019-09-26
Bedford C Band Antenna Rad Pattern R1Images2019-09-26
Notice of Launch and DeployPost Grant Documents2019-12-08
ODAR 2019 SignedText Documents2019-09-05
EMC Analysis Sept 2019Text Documents2019-09-26
Ground Station ReferenceText Documents2019-10-24
ITU Cost Recovery Letter 2019Text Documents2019-09-05
NOAA CRSRA License Waiver LetterText Documents2019-08-24
Discussion of STA Modification R1Text Documents2019-10-04
Passive Receive Alpha Ops DocumentationText Documents2019-09-04
Notice of TerminationPost Grant Documents2021-11-17
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Analytical Space

Address
Attention: Adam Wong
Street Address: 501 Massachusetts Ave.
P.O. Box:
City: Cambridge
State: MA
Zip Code: 02139
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Miller
First Name: Mike
Title: Licensing Coordinator
Phone Number: (415)385-3842

Explanation
Please explain in the area below why an STA is necessary:
The STA is necessary to authorize operation of the radios on the Meshbed spacecraft, to obtain telemetry data about spacecraft operation, and to facilitate test operations of the FUSE experimental antenna.

Purpose of Operation
Please explain the purpose of operation:  The Purpose of Operation is to validate the Meshbed spacecraft bus, and to evaluate the performance of the experimental FUSE license.

Information
Callsign: WO9XBG
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 11/01/2019
Operation End Date: 04/30/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
GomSpace 100UL 1 No
GomSpace TR-600 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Michael Miller
Title of Applicant (if any): Licensing Coordinator
Date: 2019-08-23 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
North      West      LEO, 505 KM UHF
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 401.24000000-401.36000000 MHz MO 1.000000 W 0.890000 W P 0.00025000 % 114KG1D GMSK

City State Latitude Longitude Mobile Radius of Operation
North      West      LEO, 505 KM FUSE
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2.39500000-2.45000000 GHz MO 1.000000 W 6.100000 W P 0.10000000 % 55M0F7D Binary CPFSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2.39500000-2.45000000 GHz MO 1.000000 W 6.100000 W P 0.10000000 % 5M00F7D Binary CPFSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 5.27000000-5.32000000 GHz MO 0.398000 W 11.600000 W P 0.10000000 % 50M0F7D Binary CPFSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 5.49000000-5.54000000 GHz MO 0.200000 W 6.400000 W P 0.10000000 % 50M0F7D Binary CPFSK

24219

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC