                      REQUEST FOR WAIVER OF TEMPORARY FILING FREEZE

                Pursuant to Section 1.925 of the Federal Communications Commission’s (“FCC” or

“Commission”) rules,1 Hawaii Pacific Teleport, L.P. (“HPT”), by counsel, respectfully requests

that the International Bureau (“Bureau”) waive the temporary freeze on new applications for

fixed-satellite service (“FSS”) earth station licenses in the 3.7-4.2 GHz Band (“Filing Freeze”).2

As described below, granting HPT’s waiver request would not undermine the objectives of the

Filing Freeze, and it would serve the public interest by promoting national security, public

safety, and education.

                Section 1.925 of the FCC’s rules permits the Commission to waive its rules on its own

motion or upon request. The Commission may grant a waiver if “(i) the underlying purpose of

the rule(s) would not be served or would be frustrated by application to the instant case, and that

grant of the requested waiver would be in the public interest; or (ii) in view of unique or unusual

factual circumstances of the instant case, application of the rule(s) would be inequitable, unduly

burdensome or contrary to the public interest, or the applicant has no reasonable alternative.”3 In

this case, both grounds for waiver apply to HPT.

                HPT offers satellite and fiber-based communications transport and connectivity around

the Pacific Rim. Among other things, HPT’s satellite services act as a vital communications link

for a number of isolated pacific islands. HPT’s services support a variety of communications

services, including telephony, IP connectivity, and television broadcasting services. Among the




1
  47 C.F.R. § 1.925.
2
  Temporary Freeze on Applications for New or Modified Fixed Satellite Service Earth Stations
and Fixed Microwave Stations in the 3.7-4.2 GHz Band, 90 Day Window to File Applications for
Earth Stations Currently Operating in 3.7-4.2 GHz Band, Public Notice, 33 FCC Rcd 3841 (Int.
Bur. 2018) (“Filing Freeze PN”).
3
  47 C.F.R. § 1.925(b)(3).


{01283869‐1 }


most critical aspects of HPT’s satellite service is the redundancy it provides to remote island

communities for internet access and other IP connectivity.

                While undersea cables connect many of the islands HPT serves, the remote location of

pacific islands make undersea cable outages (as recently occurred in Tonga)4 particularly

devastating for these communities. As the Commission is well aware, many modern services

depend on internet or data connectivity. Hospitals rely on internet connected monitoring

devices; weather stations (which can be particularly important for costal and island communities)

use internet connectivity to produce accurate weather forecasts, and public safety agencies use IP

connected communications devises. Many schools, and their students, also need internet access

to complete their daily lesson plans. And, of particular importance here, U.S. military

installations on a number of the islands HPT serves use IP/data connectivity to fulfill their vital

national security functions.

                HPT seeks this waiver for a new FSS C-Band earth station located on the island of Guam.

More than 150,000 people live on Guam. The United States Navy and Air Force operate a joint

base on the island that has taken on heightened importance in the past decade.5 Guam is more

than 1,500 miles east of Manila, Philippines and is more than 3,800 miles west southwest of

Honolulu, Hawaii.

                Because of Guam’s remoteness, the Commission should view HPT’s waiver request in

the overall context of the unique challenges faced by service providers on Guam. In similar



4
  Jon Brodkin, Undersea cable damage wipes out most Internet access in Tonga islands,
arstechnica.com (Jan. 25, 2019, 1:22 PM), https://arstechnica.com/information-
technology/2019/01/undersea-cable-damage-wipes-out-most-internet-access-in-tonga-islands/.
5
  Praveen Swami, US to build £8bn super base on Pacific island of Guam, The Telegraph (Oct.
25, 2010, 9:00 PM),
https://www.telegraph.co.uk/news/worldnews/australiaandthepacific/guam/8085749/US-to-
build-8bn-super-base-on-Pacific-island-of-Guam.html.


{01283869‐1 }


contexts, the Commission has identified special conditions associated with building in places like

Hawaii or Alaska (albeit without the short construction season Alaska experiences).6 Among

other things, challenges of providing service on Guam include the difficulty in transporting fuel

and other necessary infrastructure to the island and its remoteness, lack of road access, limited

scalability per community/island, limited satellite and backhaul availability, and susceptibility to

extreme weather conditions. These challenges make the provision of service to Guam both

challenging and vital.

                Moreover, the additional backhaul capacity and redundancy offered by HPT’s new FSS

earth station on Guam will serve the public interest. As noted above, military installations in the

pacific along with local hospitals, weather services, public safety agencies, and schools all rely

on the internet access and/or IP connectivity that HPT’s satellite transport service will provide.

These types of national security, public safety, and educational users are a primary reason the

Commission consider dependable broadband access and IP connectivity core public interest

policy goals going forward. In addition to these critical users, HPT’s satellite services can also

support a variety of other commercial and residential services, bringing new competitive service

offerings to Guam. This added competition among internet access and IP backhaul providers

further serves the public interest, especially on Guam where capital costs of deployment and

barriers to entry are otherwise exceptionally high.

                HPT has no viable alternative to its planned satellite service offering. As noted above,

undersea cables do service Guam, but installing additional new cables would take years of

planning and deployment and cost significantly more than HPT’s satellite service. Installing



6
 See, e.g., Connect America Fund; Universal Service Reform – Mobility Fund; Connect America
Fund – Alaska Plan, Report and Order and Further Notice of Proposed Rulemaking, 31 FCC Rcd
10139, 10162, ¶ 72 (2016).


{01283869‐1 }


another undersea cable also would not provide the same kind of backup resiliency as HPT’s

satellite service because multiple undersea cables are similarly susceptible to damage (such as

from super typhoons like the one the Mariana Islands experienced last year).

                Finally, granting HPT’s waiver request will not undermine the objectives of the Filing

Freeze. The Filing Freeze was implemented to allow the Commission to fully consider the

record in its pending C-Band proceeding “while limiting the potential for speculative

applications that might be filed in anticipation of potential future actions by the Commission.”7

HPT recognizes the importance of the Commission’s ongoing efforts to facilitate the deployment

of 5G technology by ensuring the most efficient use of spectrum resources in the United States.

However, again, because of Guam’s remoteness, HPT’s deployment on the island will not have a

meaningful impact on the Commission’s C-Band proceeding. For example, a primary concern of

the ongoing proceeding is how best to allocate spectrum to support 5G deployment in spectrum

constrained areas in the continental United States (and to some extent in Alaska, Hawaii, and

Puerto Rico). Deployment of HPT’s satellite service on Guam will have no impact on the

Commission’s decision as to how best to allocate spectrum in those geographic locations.

Furthermore, HPT’s deployment is not speculative or intended to take advantage of any eventual

rule changes because HPT’s service on Guam is demand-based and will not change (other than

as required by the Commission) based on future C-Band rule changes.

                Accordingly, for the reasons described above, HPT respectfully requests that the

Commission grant its waiver request and allow HPT to file an application to register or license

the operation of its FSS earth station in the 3.7-4.2 GHz band on Guam. Waiver is warranted

because (1) HPT’s service is in the public interest, (2) the provision of that service on Guam



7
    Filing Freeze PN at 3.


{01283869‐1 }


would otherwise be infeasible based on the unique difficulties of providing service on the island,

and (3) granting HPT’s waiver request would not undermine the purpose of the Bureau’s Filing

Freeze.