Attachment 2018_11_27_09_23_02.

2018_11_27_09_23_02.

DECISION submitted by FCC

Grant Conditions

2018-11-27

This document pretains to SES-STA-20181017-03063 for Special Temporal Authority on a Satellite Earth Station filing.

IBFS_SESSTA2018101703063_1580121

                                                                     Fj1Of5ec-37A -,/F,b/7-

                                                                     Call Sn J2o5%              t      i% 7/c-i
                                                          F   .+l
                                                                     (or tthar idi’ntii or)
                                                   *‘$‘


Applicant: GCI Communication Corp.                                                          Torm Dates
Call Sign: E020336                                                                                To:
File Number: SES-$TA-20181017-03063                 GRANTED                      /7
Special Temporary Authority                       lntiuiionaHn1au


GCI Communication Corp. (‘GCI”) is granted special temporary authority to operate two
antennas located in Anchorage, AK for 60 days to communicate with the Permitted List satellites
on 5925-6425 MHz (Earth-to-space) and 3700-4200 MHz (space-to-Earth) frequency bands
under the following conditions:
   1.      Operations with antenna ID Test 3.6m, Scientific-Atlanta model $136, will not
           exceed the operational power levels and parameters requested: maximum input power
           at antenna flange of 50.0 Watts, maximum total output eirp for all carriers of 62.3
           dBW, transmit antenna gain of 45.3 dBi at 6.0 GHz. Operations will comply with the
           maximum input power density per carrier of -2.7 dBW/4kHz pursuant to 47 C.F.R. §
           25 .2 12(d).

   2.      Operations with antenna ID Test 3.$m, Patriot model TXINT-3$OAZ, will not exceed
           the operational power levels and parameters requested: maximum input power at
           antenna flange of 200.0 Watts, maximum total output eirp for all carriers of 69.2
           dBW, transmit antenna gain of 46.2 dBi at 6.0 GHz. Operations will comply with
           the maximum input power density per carrier of -2.7 dBW/4kHz pursuant to 47
           C.F.R. § 25.2 12(d).

   3.      Operations shall not cause harmful interference to, and shall not claim protection
           from interference caused to it by any other lawfully operating station, and it shall
           cease transmission(s) immediately upon notice of such interference and notify the
           FCC in writing.

   4.      Grant of this special temporary authority is without prejudice to future FCC action on
           GCFs pending application, IBFS File No. SES-LIC-201$1017-03064.

   5.      Transmitter(s) must be turned off during antenna maintenance to ensure compliance
           with the FCC-specified safety guidelines for human exposure to radiofrequency
           radiation in the region between the antenna feed and the reflector.

   6.      The licensee shall take all necessary measures to ensure that the antenna does not
           create potential exposure of humans to radiofrequency radiation in excess of the FCC
           exposure limits defined in 47 CFR 1.1307(b) and 1.13 10 wherever such exposures
           might occur. Measures must be taken to ensure compliance with limits for both
           occupational/controlled exposure and for general populationluncontrolled exposure,
           as defined in these rule sections. The FCC’s OET Bulletin 65 (available on-line at
           \‘.fcc1ov/oet/rfsatety) provides information on predicting exposure levels and on


           methods for ensuring compliance, including the use of warning and alert signs and
           protective equipment for workers.

   7.      Any action taken or expense incurred as a result of operations pursuant to this
           authority is solely at GCI’s risk.

   8.      Grant of this authority is without prejudice to any determination that the Commission
           may make regarding any pending or future application filed by GCI.


This action is issued pursuant to Section 0.26 1 of the Commission’s rules on delegated authority,
47 C.F.R. § 0.261, and is effective immediately.




                                        212



Document Created: 2019-04-24 21:15:13
Document Modified: 2019-04-24 21:15:13

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC