                               Request for Special Temporary Authority

        XRS Corporation (“XRS”) is the licensee of satellite earth station E900081, pursuant to

which XRS is authorized to operate up to 19,000 half-duplex mobile earth terminals (“METs”) in

the upper L-band via the MSAT-1 (Canadian licensed), MSAT-2 and SKYTERRA-1 satellites

until September 30, 2013.1 In the instant application, XRS respectfully requests special

temporary authority to continue to operate its authorized METs for an additional sixty days, from

September 30, 2013 through November 29, 2013.

        In early 2009, LightSquared Subsidiary, LLC (“LightSquared”) (formerly, a subsidiary of

SkyTerra Communications, Inc.) proposed to require XRS to migrate its operations from the

lower L-band to the upper L-band in anticipation of the launch of LightSquared’s second

generation satellite, SKYTERRA-1 (which launch was, at the time, scheduled for late 2009).

XRS initially was required (pursuant to a timetable established by LightSquared) to begin

transitioning its customers to the upper L-band as early as November 1, 2009. Consequently, in

August 2009, the FCC authorized XRS to operate in the upper L-band for a two-year term

beginning on October 1, 2009 and terminating on September 30, 2011.2 Thereafter, due to a

delay in the launch and testing of LightSquared’s SKYTERRA-1 satellite,3 XRS requested and



        1
           See SES-MOD-20110722-00850 (authorizing operation of 19,000 half-duplex METs in the upper L-
band). XRS (through its predecessors) historically was authorized to operate 50,100 half-duplex METs in the lower
L-band via the MSAT-1 (Canadian licensed) and MSAT-2 satellites. XRS no longer operates in the lower L-band,
and has migrated all of its METs to the upper L-band for operations pursuant to its FCC authorization.
         2
            See File No. SES-MFS-20090313-00302 (extending XRS’s authority to operate up to 30,000 METs in
the upper L-band).
         3
           At the time, XRS sought to extend its upper L-band authority for twenty-four months only, from
September 30, 2011 through September 30, 2013. This request was consistent with the NTIA’s recommendation
that waivers of Footnote 308 (as defined herein) be limited to two years. See Letter to Julius Knapp, Chief, Office
of Engineering and Technology, FCC from Karl Nebbia, Associate Administrator, Office of Spectrum, NTIA (May
13, 2009) (“NTIA Letter”). However, because Lightsquared had authorized it to operate in the upper L-band
throughout the entire emulation period scheduled by LightSquared for SKYTERRA-1 (which was then scheduled to


                                                                                               XRS Corporation
                                                                                                 Attachment 1
                                                                                                   Page 2 of 2

obtained authority from the FCC to extend its upper L-band authorization to enable it to operate

19,000 METs for an additional two-year period, until September 30, 2013.4

        Since the time the FCC last evaluated XRS’s operations, XRS has continued to reduce its

reliance on upper L-band spectrum for the limited number of METs currently in operation.

Nevertheless, XRS anticipates that it will be unable to cease operation of all of its METs before

September 30, 2013, the date on which XRS’s upper L-band authorization presently is scheduled

to expire. Accordingly, on July 18, 2013, XRS filed an application requesting that the FCC

modify its upper L-band authorization to extend the term for an additional two years, through

September 30, 2015 (“Extension Application”).5 The Extension Application was accepted for

filing and placed on Public Notice on July 31, 2013.6 To XRS’s knowledge, no petitions to deny,

petitions to defer, or objections were filed against the Extension Application. However, to date,

the International Bureau has not acted on the Extension Application. Accordingly, XRS

respectfully requests special temporary authority to operate its presently authorized METs for an

additional sixty days, beginning on September 30, 2013. Grant of the instant application is in

the public interest because it will enable XRS to continue to provide service to its customers

while the Extension Application remains pending.




end on December 31, 2014), XRS noted in its application to the FCC that it was possible that an additional extension
of the term of the upper L-band authorization beyond September 30, 2013 may be necessary in order to enable XRS
to access SKYTERRA-1 throughout the emulation period. See Attachment B to FCC File No. SES-MOD-
20110722-00850.
          4
            See supra at note 1.
          5
            See File No. SES-MOD-20130718-00644. LightSquared has agreed to permit its current customers,
including GeoLogic, to continue to operate in the upper L-band using their current devices throughout the emulation
period, which is currently scheduled to run through the end of 2015. See Press Release, LightSquared Announces
Extension of Emulation on its Skyterra-1 Satellite Network for Existing Customers (March 6, 2012) (available at
http://www.lightsquared.com/press-room/press-releases/lightsquared-announces-extension-of-emulation-on-its-
skyterra-1-satellite-network-for-existing-customers/).
          6
            See Public Notice, Report No. SES-01572 (rel. July 31, 2013).



Document Created: 2013-09-18 10:56:13
Document Modified: 2013-09-18 10:56:13

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC