DECISION submitted by IB/FCC

GRANT

2013-06-03

This document pretains to SES-STA-20130522-00441 for Special Temporal Authority on a Satellite Earth Station filing.

IBFS_SESSTA2013052200441_1000009

                                                        E100088     SES—STA—20130522—00441         182013001106
                                                        O3b Limited



                                                                                                                           Approved by OMB
                                                                                                                                  3060—0678

                            APPLICATION FOR EARTH STATION SPECIAL TEMPORARY AUTHORITY



APPLICANT INFORMATIONEnter a description of this application to identify it on the main menu:
O3b STA to operate Vernon prior to launch (May 2013) /00#
 1. Applicant


           Name:        O3b Limited                     Phone Number:                        202 478 7183
           DBA Name:                                    Fax Number:
           Street:      1129 20th St., NW, Suite 1000   E—Mail:                              joslyn.read@o03bnetworks.com



           City:        Washington                      State:
           Country:     USA                             Zipcode:                                   =—
           Attention:   Ms Joslyn Read


                                                                                        _     .m                  ¥4   p      ++
                                                        «sdimc4s                        )17 1G, Conds C695
                                                                   ses STh—2n,3055A—00¥1
                                                                    E/o


O3b Limited
E100088
SES—STA—20130522—00441
Special Temporary Authority


O3b limited (O3b) is granted, under the following conditions, Special Temporary Authority for
45 days, from June 4, 2012 to July 18, 2012 to test its Vernon, Texas earth station as described in
its application.

    1)   E100088, shall not cause harmful interference to, and shall not claim protection from,
         interference caused to it by any other lawfully operating station and it shall cease
         transmission(s) immediately upon notice of such interference.

    2) Grant of this authorization is without prejudice to any determination that the Commission
         may make regarding pending O3b application, IBFS File Nos. SES—LIC—201301 24—
         00089.

    3) Any action taken or expense incurred as a result of operations pursuant to this special
       temporary authority is solely at O3b‘s risk.

    4) This action is issued pursuant to Section 0.261 of the Commission‘s rules on delegated
         authority, 47 C.F.R. § 0.261, and is effective immediately.




                                     4/5/04)%5                  ;lefl Couhd)froms —

                                                     Ses—57f22(30522—004L4(

                                                    imE/LDOSS Cren               oc/ox/;wg


2. Contact


             Name:         Joseph A. Godles                    Phone Number:                        202—429—4900
             Company:      Goldberg Godles Wiener & Wright Fax Number:                              202—429—4912
                           LLP
             Street:       1229 19th St., NW                   E—Mail:                              jgodles@g2w2.com


             City:         Washington                          State:                                DC
             Country:      USA                                 Zipcode:                             20036      —2413
             Attention:                                        Relationship:                         Legal Counsel


(If your application is related to an application filed with the Commission, enter either the file number or the IB Submission ID of the related
application. Please enter only one.)
 3. Reference File Number SESLIC2013012400089 or Submission ID
  4a. Is a fee submitted with this application?
@) IfYes, complete and attach FCC Form 159.        If No, indicate reason for fee exemption (see 47 C.F.R.Section 1.1114).
C Governmental Entity        C Noncommercial educational licensee
C Other(please explain):

4b. Fee Classification    CGX — Fixed Satellite Transmit/Receive Earth Station

5. Type Request


 «y Use Prior to Grant                            J Change Station Location                         J Other



6. Requested Use Prior Date
      06/04/2013


7. CityVernon                                                              8. Latitude
                                                                           (dd mm ss.s h)     34   13     4.73    N
9. State TX                                                                 10. Longitude
                                                                           (dd mm ss.s h)     99   23     46.53   W
11. Please supply any need attachments.
Attachment 1: STA                                 Attachment 2:                                         Attachment 3:


12. Description.   (If the complete description does not appear in this box, please go to the end of the form to view it in its entirety.)
    Applicant herein seeks Special Temporary Authority to permit it to conduct on—site testing
    and integration of the earth station in Vernon,                             Texas for which it has sought a Commission
    license.




13. By checking Yes, the undersigned certifies that neither applicant nor any other party to the application is               Yes        £34 No
subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti—Drug Act
of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance.
See 47 CFR 1.2002(b) for the meaning of "party to the application" for these purposes.


14. Name of Person Signing                                                 15. Title of Person Signing
   Joslyn Read                                                                Vice—President, Regulatory Affairs
          WILLEFUL FALSE STATEMENTS MADE ON THIS FORM ARE PUNISHABLE BY FINE AND / OR IMPRISONMENT
                  (U.S. Code, Title 18, Section 1001), AND/OR REVOCATION OF ANY STATION AUTHORIZATION
                   (U.S. Code, Title 47, Section 312(a)(1)), AND/OR FORFEITURE (U.S. Code, Title 47, Section 503).


FCC NOTICE REQUIRED BY THE PAPERWORK REDUCTION ACT

The public reporting for this collection of information is estimated to average 2 hours per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the required data, and completing and reviewing the collection of information. If you
have any comments on this burden estimate, or how we can improve the collection and reduce the burden it causes you, please write to the
Federal Communications Commission, AMD—PERM, Paperwork Reduction Project (3060—0678), Washington, DC 20554. We will also accept
your comments regarding the Paperwork Reduction Act aspects of this collection via the Internet if you send them to PRA@fce.gov. PLEASE
DO NOT SEND COMPLETED FORMS TO THIS ADDRESS.

Remember — You are not required to respond to a collection of information sponsored by the Federal government, and the government may not
conduct or sponsor this collection, unless it displays a currently valid OMB control number or if we fail to provide you with this notice. This
collection has been assigned an OMB control number of 3060—0678.

THE FOREGOING NOTICE IS REQUIRED BY THE PAPERWORK REDUCTION ACT OF 1995, PUBLIC LAW 104—13, OCTOBER
1, 1995, 44 U.S.C. SECTION 3507.


                            Request for Special Temporary Authority

        O3b Limited ("O3b") hereby requests Special Temporary Authority ("STA") for
 45 days, beginning on June 4, 2013, to conduct on—site testing and integration of the
 gateway earth station in Vernon, Texas (the "Vernon Earth Station"), for which it has
filed an application for a Commission license (the "Vernon Application").1. The
 Commission may grant an STA for up to 60 days without placing the request on public
 notice as long as the applicant "plans to file a request for regular authority for the
 service." See 47 C.F.R. § 25.120(b)(3). O3b filed the Vernon Application on January 24,
2013, and that application remains pending at the Commission.

       Public Interest Statement. This STA request is similar to STA requests that O3b
filed and the Commission granted for testing and integration of O3b‘s gateway earth
station in Hawaii.2 The requested STA will serve the public interest by permitting O3b
to conduct antenna pattern verification, RF chain performance verification, as well as
other tests of the Vernon Earth Station to establish performance standards and to
resolve any issues in preparation for the launch of its NGSO Ka—band service.3 O3b
hereby confirms that it will operate the Vernon Earth Station under its requested STA
on a non—interference basis only and will cease operations immediately if alerted to any
interference events.

        Therefore, O3b respectfully requests that the Commission grant this STA request
as expeditiously as possible, but in any event on or before June 4, 2013.




1 See ECC File No. SES—LIC—20130124—00089.
2 See FCC File Nos. SES—STA—20120529—00490, SES—STA—20120529—00491.
3 03b recently provided notification that it has received launch and space operations authority from the
administration of the United Kingdom. See Letter from Joseph A. Godles, Counsel to O3b Limited, to
Marlene H. Dortch, Secretary, Federal Communications Commission (dated May 7, 2013), in File No. SES—
LIC—20100723—00952.


      Technical Parameters of Proposed Testing. O3b proposes to test its gateway
antennas using the following range of transmit and receive frequencies:

             ~ Downlink Frequency __|_____ Ka—Band Plan _
             17.8—18.3 GHz                  FS
             18.3—18.6 GHz                  GSO FSS down
             18.8—19.3 GHz                  NGSO FSS down
              ___ Uplink Frequency_         _____Ka—Band Plan _
             27.6—28.35 GHz                 LMDS
                                            fss (secondary)
             28.35—28.4 GHz                 GSO FSS up
                                            ngsofss up (secondary)
             28.6—29.1 GHz                  NGSO FSS up
                                            gso fss up (secondary)


      03b offers the following technical information concerning its proposed
operations during the STA period (which is consistent with the information set forth in
the Vernon Application where applicable):

1. Maximum Transmit EIRP:                     92.17 dBW for all carriers, each antenna.
                                              87.29 dBW for a single carrier.


2. Maximum Transmit EJIRP Density:            72.13 dBW/4 kHz.

3. Avoidance of Harmful Interference into     O3b‘s test procedures specify pointing the
the Geostationary Arc during Transmission     earth station to 90 degrees elevation,
Tests:                                        which provides 39.75 degrees of
                                              separation from the GSO arc, thereby
                                              protecting geostationary satellites.


4. Avoidance of Harmful Interference into             During testing, 03b will not transmit less
Terrestrial Stations During Transmission              than 5.1 degrees above the horizon, which
Tests:                                                in a worst case scenario would yield a
                                                      maximum EIRP density towards the
                                                      horizon of only 27.81 dBW/4kHz.4
                                                      Moreover, a Comsearch frequency
                                                      coordination report filed with the Vernon
                                                      Application demonstrates that O3b can
                                                      transmit in the 28.35—28.4 GHz band
                                                      without causing harmful interference to
                                                      LMDS licensees.5 Accordingly, operation
                                                      of the Vernon Earth Station in accordance
                                                      with the requested STA will not pose a
                                                      risk of interference to terrestrial stations.


5. Target Satellite for Receive Tests:                Receive testing of the O3b gateways will
                                                      involve pointing the O3b gateway at the
                                                      geostationary arc. Viasat—1 will be the
                                                      primary target for testing the gateway
                                                      receivers (but other satellites may be used
                                                      as needed). Viasat also happens to be the
                                                      vendor of the O3b gateway antennas. O3b
                                                      claims no protection from interference
                                                      during receive testing. To be clear, O3b
                                                      gateways will not be transmitting when
                                                      pointed at the geostationary are during
                                                      receive tests.
6. Protection of Other NGSO Ka—Band                   03b is not aware of any other NGSO
Satellite Networks.                                   satellites capable of receiving on O3b‘s
                                                      transmit frequencies. O3b will operate on
                                                      a non—interference basis during testing,
                                                      and will therefore shut down
                                                      transmissions in the event of any
                                                      interference.




4 See Vernon Application, Form 312, items E59—60.
5 See Vernon Application, Legal Narrative, pp. 4—5.


7. 03b Contacts in the Event of                           Primary: Gary Mattie
Interference:                                                     (720) 480—9371
                                                          Secondary: Brian Mathews
                                                                        (303) 591—3247
                                                          Tertiary: Matt Lucero
                                                                   (571) 239—3812



         Waivers Requested. O3b respectfully requests all necessary waivers of the FCC‘s
Ka—Band Plan, the U.S. Table of Allocations, and the Commission‘s rules for it to
conduct transmission and receive tests of its Vernon Earth Station antennas. Waivers
are warranted in the circumstances because they will enable O3b to verify the operation
of its Vernon Earth Station antennas and will not cause harmful interference to any
other lawfully authorized user of the spectrum.©

        To summarize, all testing will be conducted on a non—conforming, non—protected,
and non—harmful interference basis. Because the 03b NGSO system is not yet launched
or operational, transmission tests will not be to any particular satellite. O3b‘s transmit
tests will involve pointing the antennas at a 90 degree elevation, which provides more
than 39 degrees of separation from the geostationary arc, thereby protecting any
geostationary satellites. O3b is also not aware of any Ka—band NGSO satellites that
could be affected during transmit testing, but will shut down in the event of any
interference. O3b‘s receive testing will involve pointing its gateway antennas at a
geostationary satellite (primarily ViaSat—1). O3b will claim no protection from
interference during receive testing, and no transmissions will take place while O3b is
pointed at the geostationary arc.




6 The Commission may waive a rule for good cause shown. 47 C.F.R. § 1.3. See also WAIT Radio v. FCC,
418 E.2d 1153 (D.C. Cir. 1969); Northeast Cellular Telephone Co. v. FCC, 897 F.2d 1164, 1166 (D.C. Cir. 1990).
A waiver is appropriate if special circumstances warrant a deviation from the general rule and such
deviation would better serve the public interest than would strict adherence to the rule. See Northeast
Cellular, 897 F.2d at 1166. Generally, the Commission may grant a waiver of a rule if the relief requested
would not undermine the policy objective of the rule and would otherwise serve the public interest. See
WAIT Radio, 418 F.2d at 1157.

                                                      4