Attachment 20170816125826.pdf

20170816125826.pdf

DECISION submitted by IB-FCC

Grant

2017-08-16

This document pretains to SES-RWL-20170503-00492 for Renewal on a Satellite Earth Station filing.

IBFS_SESRWL2017050300492_1262342

                                                   UNITED STATES OF AMERICA
                                              FEDERAL COMMUNICATIONS COMMISSION

                                            RADIO STATION AUTHORIZATION
 Name: Cable One, Inc.                                                                                    Call Sign: KRS58
 Authorization Type: Renewal ofLicense                                                                 File Number: SES—RWL—20170503—00492
 Non Common Carrier                         Grant date:     05/11/2017         Expiration Date:         07/02/2032    «es




Nature of Service: Domestic Fixed Satellite Service
Class of Station: Fixed EarthStations

A) Site Location(s)
                                                                                                              Elevation
#. Site ID                          Address                             Latitude       Longitude               (Meters)         NAD (Refer to SectionH)

111                                                                «3636‘24.0"N       116917(10.0°w                820 .2        83
                         rotss,

                         Licensee certifies antenna(s) comply with gain patterns specified in Section 25.209



Subject to the provisions ofthe Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, andall present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use andoperate the radio facilities described
below for radio communicationsfor the term beginning July                                        stern Standard Time) andending July                   2032
(3 AM Eastern Standard Time) The required date of completion of construction and commencement ofoperation is
00/00/0000. Grantee must file with the Commission a certification upon completion of construction and commencement of
operation.

B) Particulars of Operations

The General Provision 1010 applies to all receiving frequencybands
The General Provision 1900 applies to all transmitting frequeneybands
For the text of these provisions, refer to Section H.                       Max      Max EIRP                          Special
                                                                           EIRP       Density                        Provisions
             Frequency             Polarization               To/Rx       /Carrier   ICxlrricr    Associaned          (Re_l‘cr 19—       Modulation/
#                (MHM)                 Code       Emission Mode           (UBW) (dBWAKHz) Anfenng                    525000 H)            Services
11 3700.0000—4200 . 0000              H.V       3600058                                            1


C) Frequency Coordination Limits
                                                   Satellite Are               Elevation               Azimuth         Max EIRP
             .              122                    (Deg. Long.)                (Degrees)               (Degrees)     Densitytoward
             FrequencyLimits                       East      West           East     West         East       West       Horizon                  Associated
 #                (MHz)                           Limit      Limit         Limit     Limit       Limit       Limit    (dBW/AkHz)                 Antenna(s)

1)      3700 .0000—4200 . 0000                    70. 0#—136 . O#            20.1—36.0            133.2—207.5                        0      1




                                                                 (page 1 of 4 )                                                                 FCC Form 488


                                             UNITED STATES OF AMERICA
                                        FEDERAL COMMUNICATIONS COMMISSION

                                       RADIO STATION AUTHORIZATION
Name: Cable One, Inc.                                                                          Call Sign: KRS8
Authorization Type: Renewal of License                                                   File Number: SES—RWL—20170503—00492
Non Common Carrier                     Grant date:   05/11/2017       Expiration Date:    07/02/2032




D) Points of Communications
  The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

 1) 1 to Permitted Space Station List

E) Antenna Facilities
                                                                                                                                          Special
   .                                                                                                  S'te_                Max           Provisions
 Site            Antenna                Diameter                                                    Elevation      Antenna Height        (Refer to
  ID               ID          Units      (meters)     Manufacturer            Model number         (Meters)          (Meters)           Section H)

                       1         1          4 .5     ANDREW CORPORATION           ESAS—4HP          B20.2         6 AGL/   826.2 AMSL

       Max Gains(s) :       44.0 dBi @     4.0000 GHz
       Maximum total input power at antenna flange (Watts)                               .00
       Maximum aggregate output EIRP for all carriers             (dBW) =                .00




G) Antenna Structure marking and lighting requirements:
        None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
       A)This RADIO STATION            AUTHORIZATION is granted subject to the following special provisions and general
         conditions:
           4 ——— Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
                 number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
                 International Bureau Filing System (IBFS) in the "Other Filings" tab within 10 days of the change.
            5 ——— Licensee must notify the Commission when an earth station is no longer operational or when it has not been used
                  to provide any service during any 6—month operation.

            6 ——— Licensee must comply with the license modification and notification requirements of 47 CFR § 25.118 to change
                  the coordinates ofits authorized earth station.

        2465 ——— This provision relates to potential interference from terrestrial microwave stations. "Operation of the receive—only
                 earth station shall be in accordance with the frequency coordination exhibit completed for this station. "

       90398 ——— Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
                 may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
                 Environmental Assessment (EA) by the             licensee.     (see 47 C.F.R.        §§1.1307,    1.1308 and       1.1311)




                                                         ( page 2 of 4 )                                                    FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION
Name: Cable One, Inc.                                                                   Call Sign: KRS8
Authorization Type: Renewal of License                                                File Number: SES—RWL—20170503—00492
Non Common Carrier               Grant date:      05/11/2017       Expiration Date:    07/02/2032




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
    90399 ——— The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized earth
              station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC exposure
              limits defined in 47 CFR §§ 1.1307(b) and 1.1310. Physical measures must be taken to ensure compliance with
              limits for both occupational/controlled exposure and for general population/uncontrolled exposure, as defined in
              these rule sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.




                                                      ( page 3 of 4 )                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                  RADIO STATION AUTHORIZATION
Name: Cable One, Inc.                                                                 Call Sign: KR58
Authorization Type: Renewal of License                                              File Number: SES—RWL—20170503—00492
Non Common Carrier               Grant date:—   053/11/2017      Expiration Date:    07/02/2032




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakingsdescribed will be carried outin goodfaith.

              This authorization shall not be construed in any manner as a finding bythe Commission on the question of
              marking or lighting of the antenna systemshould future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) ofthe
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted bythis authorization shall be assigned or otherwise transferred to
              anyperson, firm, companyor corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed byPart 25 of the Commission‘s
              Rules. 47 C.F.R, Part 25.

              This authorization shall not vest in the licensee anyright to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, norin anyother manner thanauthorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forthin Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
               17.4.

              The following conditionapplies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automaticallyforfeited if the stationis not ready for operation bythe required date of
              completion of construction unless an application for modification of authorization to request additional time to
              complete construction is filed by that date, togetherwith a showing that failure to complete construction by the
              required date was due to factors not under control of the grantee.

              Licensees are required to pay    annual regulatoryfees related to this authorization. The requirement to
              collect annual regulatory fees fromregulatees is contained in Public Law103—66, "The Omnibus Budget
              Reconciliation Act of 1993.". These regulatoryfees, which are likelyto change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the newregulatory
              fee rates. Receive only earth stations are exempt from payment of l‘%’guln(ury Tees.




                                                    (page 4 of 4 )                                                FCC Form488



Document Created: 2017-08-16 12:58:42
Document Modified: 2017-08-16 12:58:42

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC