Attachment SESMOD2017041800399.

SESMOD2017041800399.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-MOD-20170418-00399 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2017041800399_1235302

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

    Name: EchoStar Operating L.L.C.                                                                           Call Sign: EQ20248
    Authorization Type: Modification of License                                                         File Number: SES—MOD—2017041 8-0.‘0‘3‘“,‘9"9.,_ —
    Non Common Carrier                          Grant date:         05/30/2017      Expiration Date:     04/22/2018         4 No \ mnasosonce UZ1




Nature of Service: Other

Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                                 Elevation              Special Provisions
#     Site ID                           Address                              Latitude       Longitude             (Meters)     NAD (Refer to Section H)

1) BH                    10020    LIBERTY STREET                        44°11‘15.3"N        103°20‘9.7"W           1109.4       83
                         BLACKHAWK,       MEADE,        SD 57718



                         Licensee certifies antenna(s)                  comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning April 22, 2003 (3 AM Eastern Standard Time) and ending April 22,
2018 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is May
30, 2018 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement of operation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                                Max      Max EIRP                       Special
                                                                               EIRP       Density                     Provisions
»           Fr(;;[l;le;)cy            Polg(i)zaetion Emissi          Tx/Rx    /Carrier    /Carrier aAggociated         (Re'fer to    Modulfltion/
                                                          mission    Mode      (dBW)     (dBW/4kHZ)    Antenna        Section H)       Services

1) 17790.0000—17800.0000                 OTHER          1M50F2D        Tx      85 .10       59.40      BH13                          COMMAND

2) 17790.0000—17800.0000                 OTHER     . 1M50F3D           Tx      85 .10       59.40      BH13                          COMMAND

3) 17790.0000—17800.0000                 OTHER          800KF3D        Tx      82 .60       59 .60     BH13                          COMMAND


4) 17300.0000—17800.0000                 L, R           24M0GIW        Tz      85 .10       47 .30     BH13                          DIGITAL COMPRESSED VIDEO


5) 17300.0000—17310.0000                 OTHER          1M50F2D        Ts      85 .10       59 .40     BH13                          COMMAND


6) 17300.0000—17310.0000                 OTHER          1M50F3D        x       85 .10       59.40      BH13                          COMMAND

7)17300.0000—17310.0000                  OTHER          800KF3D        Tx      $2.60        59.60      BH13                          COMMAND


8) 12690.0000—12700.0000                 OTHER          300KGXD        Rx                              BH13                          TELEMETRY


9) 12690.0000—12700.0000                 OTHER          800KF3D        Rx                              BH13                          TELEMETRY




                                                                       ( page 1 of 5 )                                                    FCC Form 488


                 C m                                   UNITED STATES OF AMERICA
                   s. N4                          FEDERAL COMMUNICATIONS COMMISSION

                           o)                    RADIO STATION AUTHORIZATION
           "Cf"/mss\"‘\¥
              Irmmmet®


  Name: EchoStar Operating L.L.C.                                                                              Call Sign: E020248
  Authorization Type: Modification of License                                                             File Number: SES—MOD—20170418—00399
  Non Common Carrier                             Grant date:       05/30/2017      Expiration Date:        04/22/2018




 B) Particulars of Operations

 The General Provision 1010 applies to all receiving frequency bands.
 The General Provision 1900 applies to all transmitting frequency bands.
 For the text of these provisions, refer to Section H.
                                                                                Max     Max EIRP                         Special
                                                                               EIRP      Density                       Provisions
             Frequency                 Polarization                 Tx/Rx    /Carrier    /Carrier Asgociated            (Refer t0   Modulation/
 #               (MHz)                  _ Code            Emission Mode       (dBW) (dBW/A4KHZ) aApgeonna              Section H)     Services
10) 12200.0000—12700.0000                 L, R           24M0GLW      Rx                                BH13                        DIGITAL COMPRESSED VIDEO


11) 12200.0000—12210.0000                 OTHER          300KGXD      Rx                                BH13                        TELEMETRY


12) 12200.0000—12210.0000                 OTHER          800KF3D      Rx                                BH13                        TELEMETRY


13) 17790.0000—17800.0000                OTHER       1MSOF2D          Tx      77.20          51.50      BH8                         COMMAND


14) 17790.0000—17800.0000                OTHER       1M50F3D          Tx      77.20          51.50      BHS8                        COMMAND


15) 17790.0000—17800.0000                OTHER       800KF3D          Tx      77.20          54 .20     BH8                         COMMAND


16) 17300.0000—17800.0000                 L, R       24M0GIW          Tx      77.20          39.40      BHS                         DIGITAL COMPRESSED VIDEO


17) 17300.0000—17310.0000                OTHER       1M50F2D          Tx      77 .20         51.50      BH8                         COMMAND


18) 17300.0000—17310.0000                OTHER           1M50F3D      Tx      77 .20         51.50       BH8     _                  COMMAND

19) 17300.0000—17310.0000                OTHER       800KF3D          Tx      77.20          54 .20     BHS8                        COMMAND


20) 12690.0000—12700.0000                OTHER       300KGXD          Rx                                BHS8                        TELEMETRY


21) 12690.0000—12700.0000                OTHER       800KF3D          Rx                                BHS8                        TELEMETRY

22) 12200.0000—12700.0000                L, R        24M0GLW          Rx                                BHS                         DIGITAL COMPRESSED VIDEO


23) 12200.0000—12210.0000                OTHER       300KGXD          Rx                                BH8                         TELEMETRY


24) 12200.0000—12210.0000                OTHER       800KF3D          Rx                                BH8                         TELEMETRY




 C) Frequency Coordination Limits

                                                          Satellite Arc          Elevation               Azimuth        Max EIRP
             p              wl                            (Deg. Long.)           (Degrees)               (Degrees) Density toward
                 requency Limits                          East    West         East    West            East    West    Horizon               Associated
 #                  (MHz)                                Limit    Limit       Limit    Limit          Limit    Limit (dBW/4kHz)              Antenna(s)
 1)    12200.0000—12700.0000                             33 .0W—174 . OW        05.3—05 .1             104.0—256.3              0      BH8

 2)    17300.0000—17800.0000                             33 .0W— 174 . OW       05.3—05 .1             104.0—256.3         25 .04      BH8

 3)    12200.0000—12700.0000                             33 .0W—174 . OW        05.3—05 .1             104.0—256.3                     BH13

 4)    17300.0000—17800.0000                             33 .0W—174 . OW        05.3—05 .1             104.0—256.3         19 .64      BH13




                                                                      ( page 2 of 5 )                                                    FCC Form 488


                  commigh                         UNITED STATES OF AMERICA
                Y       e
             é‘f" (e NEA                     FEDERAL COMMUNICATIONS COMMISSION
            (€( \7 %%
         é@l\;)j                            RADIO STATION AUTHORIZATION

     Name: EchoStar Operating L.L.C.           _                                                             Call Sign: E020248
     Authorization Type: Modification of License                                                        File Number: SES—MOD—20170418—00399
     Non Common Carrier                     Grant date:     05/30/2017        Expiration Date:           04/22/2018




 D) Points of Communications
       The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

      1) BH to ECHOSTAR 10 @ 110.2 degrees W.L. (S2694) of the Direct Broadcast satellite system (U.S.—licensed)
      2) BH to ECHOSTAR 7 @ 119 W.L. of the Direct Broadcast satellite system (U.S.—licensed)
      3) BH to US LICENSED Echostar and Dish satellites at 61.5, 110,and 119 WL clusters
      4) BH to ECHOSTAR 23@ 44.9 W.L. (Brazil—licensed) TT&C only from E150098 and E980047


     E) Antenna Facilities
                                                                                                                       .                            Special
                                                                                                                      S‘te.          Max           Provisions
      Site           Antenna                 Diameter                                                              Elevation    Antenna Height      (Refer to
       ID               ID         Units      (meters)         Manufacturer                   Model number         (Meters)        (Meters)        Section H)
BH                     BH13           1            13 .2        VERTEX RSI                      13 .2M KU          1109 .4     17.9 AGL/ 1127.2
                                                                                                                                     AMSL

            Max Gains(s) :           65.4    dBi @         17.8000   GHz              62.5   dBi @       12.2000 GHz
            Maximum total input power at antenna flange (Watts) =                                     324 .00
            Maximum aggregate output EIRP for all carriers (dBW) =                                     90 .50



BH                      BHS8          1             8           VERTEX RSI            _              BM KU         1109 .4     11.67 AGL/ 1121.1
                                                                                                                                      AMSL

            Max Gains(s) :           60.0   dBi @          17.8000 GHz                s8.0   dBi e       12.2000    GHz
            Maximum total input power at antenna flange (Watts) =                                     53.00
            Maximum aggregate output EIRP for all carriers (dBW) =                                    77.20




 F) Remote Control Point:
 BH                    530 Echostar Drive                                         j                                Call Sign: E020094
                       Cheyenne, Laramie, WV §2007
                       307—633—5212


 G) Antenna Structure marking and lighting requirements:
             None unless otherwise specified under Special and General Provisions


 H) Special and General Provisions
        A)This RADIO STATION                 AUTHORIZATION is granted subject to the following special provisions and general
           conditions:
                4 ——— Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
                      number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
                      International Bureau Filing System (IBFS) in the "Other Filings" tab within 10 days of the change.

                                                                ( page 3 of 5 )                                                         FCC Form 488


                                           UNITED STATES OF AMERICA
                                      FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION

Name: EchoStar Operating L.L.C.                                                          Call Sign: E020248
Authorization Type: Modification of License                                           File Number: SES—MOD—20170418—00399
Non Common Carrier                  Grant date:    05/30/2017      Expiration Date:    04/22/2018                                  ’




H) Special and General Provisions
   A)This RADIO STATION               AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
         5 ——— Licensee must notify the Commission when an earth station is no longer operational or when it has not been used
               to provide any service during any 6—month operation.

         6 ——— Licensee must comply with the license modification and notification requirements of 47 CFR § 25.118 to change
               the coordinates of its authorized earth station.

       134 ——— This grant is without prejudice and subject to the outcome of the rulemaking "The Establishment of Policies and
               Service Rules for the Broadcasting—Satellite Service at the 17.3—17.7 GHz Frequency Band and at the 17.7—17.8
               GHz Frequency Band Internationally, and at the 24.75—25.25 GHz Frequency Band for Fixed Satellite Services
               Providing Feeder Links to the Broadcasting—Satellite Service and for the Satellite Services Operating
               Bi—directionally in the 17.3—17.8 GHz Frequency Band" (IB Docket No. 06—123). Accordingly, whether the
              facilities authorized in this action will be subject to new interference—mitigation requirements will be addressed in
              IB                                  Docket                                 No.                                 06—123.


     2300 ——— Authority is granted to operate this station by remote control provided that: (1)the parameters of the transmissions
              of this station monitored at the remote control point, and the operational functions sufficient to ensure that the
              operations of this station are in full compliance with the station authorization at all times; (2) upon detection by
              the grantee, or upon notification from the Commission, of a deviation of the operation of this station,
              transmissions shall be immediately suspended until the deviation is corrected, except that transmissions
              concerning the immediate safety of life or property may be conducted for the duration of such emergency; and (3)
              the grantee shall have available, at all times, the technical personnel necessary to perform the technical servicing
              and maintenance of this station expeditiously. See also Public Notice "The International Bureau Provides
              Guidance Concerning the Relocation of Earth Station Remote Control Points", DA 06—978 (rel. May 4, 2006).
     3677 ——— Operations shall be consistent with applicable coordination agreements; to the extent such agreements have not
              been reached, operations shall be on a non—harmful interference basis, i.e., operations of the EchoStar 5 satellite
              shall not cause interference to, and shall not claim protection from, interference caused to it by any other lawfully
              operating satellites.
    90398 ——— Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
              may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
              Environmental Assessment (EA) by the licensee.               (see 47 CFR. §§1.1307, 1.1308 and 1.1311)
    90399 —~— The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized earth
              station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC exposure
              limits defined in 47 CFR §§ 1.1307(b) and 1.1310. Physical measures must be taken to ensure compliance with
              limits for both occupational/controlled exposure and for general population/uncontrolled exposure, as defined in
              these rule sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fee.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.




                                                      ( page 4 of 5 )                             ’                  FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: EchoStar Operating L.L.C.                                                         Call Sign: EQ20248
Authorization Type: Modification of License                                          File Number: SES—MOD—20170418—00399
Non Common Carrier                 Grant date:—   05/30/2017      Expiration Date:   04/22/2018




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

             This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
             completion of construction unless an application for modification of authorization to request additional time to
             complete construction is filed by that date, together with a showing that failure to complete COHS[IUCthH by the
             required date was due to factors not under control of the grantee.

             Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
             collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
             Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
             to offset costs associated with the Commission‘s enforcement, public service, international and policy and
             rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatmy
             fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 5 of 5 )                                               FCC Form 488



Document Created: 2017-06-07 16:28:07
Document Modified: 2017-06-07 16:28:07

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC