Attachment Technical Appendix

This document pretains to SES-MOD-20170228-00210 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2017022800210_1189772

                         United Teleports
                      Modification Application

              ASC Signal 6.5m Gateway Earth Station
                       Technical Appendix

I.     Supplemental Schedule S Technical Information
II.    ASC Signal 6.5m Radiation Hazard Study
III.   FCC Letter to ANATEL
IV.    Frequency Coordination Notice
V.     Engineer Certification




                                 1


         I.      Supplemental Schedule S Technical Information

    1. PURPOSE AND SCOPE

The purpose of this Attachment is to provide the Commission with the technical
characteristics of the EUTELSAT 65 WEST A (“E65WA”) satellite in support of the earth
station application filed by United Teleports. This attachment, prepared with the
cooperation of the satellite operator Eutelsat do Brasil LTDA (“Eutelsat”), contains
information required by the Commission that cannot be entered online into the Schedule S
submission.

    2. GENERAL DESCRIPTION

Eutelsat operates the E65WA satellite at the nominal 65° W.L. location. The satellite is
capable of providing a wide range of FSS services using the C-, Ku- and Ka-bands. For
purposes of the instant application, U.S. market access is being sought only for the
Appendix 30B C-band uplink frequencies. Accordingly, only the characteristics of the C-
band payload are described herein and in the Schedule S submission.

The C-band frequencies used by the satellite are the International Telecommunications
Union (“ITU”) Appendix 30B bands: the 6725-7025 MHz uplink band and the 4500-
4800 MHz downlink band. The satellite employs ten 54 MHz C-band transponders.
There are two cross-polarized C-band beams in the uplink direction and two cross-
polarized C-band beams in the downlink direction.

    3. FREQUENCY PLAN AND POLARIZATION

The E65WA satellite’s C-band frequency and polarization plan are provided in the
associated Schedule S submission. The satellite provides full frequency reuse as required
by Section 25.210(f) of the Commission’s rules, 47 C.F.R. § 25.210(f).

The satellite’s C-band frequency plan is provided below.




                                             2


    4. SPACE STATION TRANSMIT & RECEIVE CAPABILITIES

The transmit and receive antenna gain contours of the satellite’s C-band beams are
provided in GXT format and are embedded in the associated Schedule S submission. The
maximum EIRP and EIRP densities for the downlink beams are listed in Table 1. Also
listed are the maximum and minimum saturating flux-density (“SFD”) levels, referenced
at the 0 dB/K contour, for the uplink beams.

  Table 1. Maximum Downlink EIRP and EIRP Densities. Maximum and Minimum
                                  SFD’s.

                       Maximum        Maximum
                       Downlink       Downlink          Maximum SFD        Minimum SFD
 Beam
                       EIRP           EIRP Density       (dBW/m2)           (dBW/m2)
                       (dBW)          (dBW/4kHz)
 CTX                 43.08           2.5
 CRX                                                  -76 (@ 0 dB/K      -96 (@ 0 dB/K
                                                      contour)           contour)



In addition, uplink transmissions from the US territory towards the E65WA satellite will
not exceed an input power density of -57.1 dBW/Hz. The E65WA satellite network will
be operated in a manner consistent with ITU coordination agreements reached by Brazil.




                                               3


     5. ARRANGEMENT FOR TELEMETRY, TRACKING &
         COMMUNICATIONS

The arrangements for telemetry, tracking and command (“TT&C”) will be as informed in
the submission for authorization to provide Ku-band services on the same satellite, filed in File
No. SES-LIC-20160513-00427.

     6. POWER FLUX DENSITY ANALYSIS

The Commission’s Part 25 rules do not contain power flex density (“PFD”) limits
applicable to the ITU Appendix 30B downlink 4 GHz band. However, it is noted that
Article 21 of the ITU Radio Regulations includes PFD limits that are applicable to
GSO satellites using this band.

Table 2 shows the PFD levels that will occur at various angles of arrival for the downlink
beams when transmitting with a maximum downlink EIRP density of
2 . 5 dBW/4kHz. This table demonstrates compliance with the ITU’s Article 21
PFD limits.

                   Table 2. Maximum PFD Levels of Transmit Beams

           Applicable PFD                                             Worst Case PFD PFD Margin
  Angle of                    Spreading Loss        Worst Case
           Limit for Angle of (dBW/m2)                                Level at Angle of
  Arrival                                           Gain Contour
           Arrival                                                    Arrival
                                                    (dB)                                (dB)
           (dBW/m2/4 kHz)                                             (dBW/m2/4 kHz)

     0°            -152.0             -163.4        -2.0                    -162.9       10.9
     5°            -152.0             -163.3        -2.0                    -162.8       10.8
     10°           -149.5             -163.2        -2.0                    -162.7       13.2
     15°           -147.0             -163.0        -2.0                    -162.5       15.5
     20°           -144.5             -162.9        -2.0                    -162.4       17.9
     25°           -142.0             -162.8        -2.0                    -162.3       20.3
    61.4°
                   -142.0             -162.2        0.0                     -159.7       17.7
   (Peak)

This information is provided for completeness; United Teleports does not seek to
downlink from the E65WA satellite in the United States.

     7. TWO-DEGREE COMPATIBILITY ANALYSIS

This section demonstrates that the E65WA satellite network’s operations are two-degree

                                                4


compatible.

Currently there are no operational C-band satellites two degrees away from the nominal
65° W.L. location using the Appendix 30B bands, nor are there any pending applications
before the Commission requesting to use the Appendix 30B C-bands at a location two
degrees or less from the nominal 65° W.L. location. In order to demonstrate two-degree
compatibility, the transmission parameters of the E65WA satellite network have been
used as both the wanted and interfering transmissions.

Table 3 provides typical transmission parameters used by the E65WA satellite network
which were used in the interference analysis.

Table 4 shows the results of the interference calculations in terms of the overall C/I
margins. The interference calculations assume that the wanted and interfering carriers are
co-polarized and all earth station antennas conform to a sidelobe pattern of 29-25 log().
The C/I calculations were performed on a per Hz basis.

These tables indicate that all the C/I margins are positive, thereby demonstrating the two-
degree compatibility of the E65WA satellite network.

                        Table 3. Typical Transmission Parameters

     Carrier Emission Bandwidth         Tx E/S        Uplink       Downlink          Rx E/S   C/I Criterion
       ID Designator (MHz)               Gain         EIRP        EIRP (dBW)          Gain        (dB)
                                         (dBi)        (dBW)                           (dBi)
 1          45M0G7W       45.0            51.5         70.9       41.6                 48.0   24.2
 2          45M0G7W       45.0            51.5         69.9       40.5                 48.0   24.2
 3          30M0G7W       30.0            51.5         65.3       37.4                 48.0   21.6
 4          30M0G7W       30.0            51.5         65.3       36.3                 48.0   21.6


                  Table 4. Summary of the overall link C/I margins (dB)

VICTIM UPLINK BEAM INFORMATION
Uplink Frequency Band (MHz)                     6725-7025   6725-7025    6725-7025   6725-7025
Uplink Beam Peak G/T (dB/K)                     1.3         1.3          1.3         1.3
INTERFERING DOWNLINK BEAM
INFORMATION
Downlink Frequency Band (MHz)                   4500-4800   4500-4800    4500-4800   4500-4800
INTEREFRING CARRIER INFORMATION


                                              5


Emission Designation                           45M0G7W     45M0G7W     30M0G7W     30M0G7W
Carrier Modulation                             QPSK        QPSK        QPSK        QPSK
Allocated Bandwidth(kHz)                       45000       45000       30000       30000
Uplink Power Density (dBW/Hz)                  -57.1       -57.1       -61.0       -61.0
Downlink EIRP Density (dBW/Hz)                 -34.9       -34.9       -37.4       -37.4
VICTIM CARRIER INFORMATION
Emission Designation                           45M0G7W     30M0G7W     45M0G7W     30M0G7W
Carrier Modulation                             QPSK        QPSK        QPSK        QPSK
Allocated Bandwidth(kHz)                       45000       30000       45000       30000
Minimum Uplink EIRP (dBW)                      69.9        65.3        69.9        65.3
Minimum Downlink EIRP (dBW)                    40.5        36.3        40.5        36.3
INTERFERING UPLINK EARTH STATION
Earth Station Diameter (meters)                6.5         6.5         6.5         6.5
Earth Station Gain (dBi)                       51.5        51.5        51.5        51.5
VICTIM DOWNLINK EARTH STATION
Earth Station Diameter (meters)                6.5         6.5         6.5         6.5
Earth Station Gain (dBi)                       48.0        48.0        48.0        48.0
Earth Station G/T (dB/K)                       29.2        29.2        29.2        29.2
COMPOSITE LINK PERFORMANCE
Uplink Interference C/I (dB)                   29.5        26.7        33.3        30.5
Downlink Interference C/I (dB)                 25.9        23.5        28.3        25.9
Total C/I (dB)                                 24.3        21.8        27.1        24.6
C/I Required (dB)                              24.2        21.6        24.2        21.6
Margin (dB)                                    0.1         0.2         2.9         3.0



      8. ORBITAL DEBRIS MITIGATION PLAN

The arrangements orbital debris mitigation will be as informed in the submission for
authorization to provide Ku-band services on the same satellite, filed in File No. SES-LIC-
20160513-00427.

      9. ITU Filings

The E65WA satellite network operates under the following two ITU Appendix 30B
filings:

B-SAT-3R – AP30B/A6A/254 published in IFIC 2744.

B-SAT-3R-1 – AP30B/A6A/333 published in IFIC 2774

                                               6


                    II. ANALYSIS OF NON-IONIZING RADIATION
                         for United Teleports Inc
                     Site: Port Saint Lucie State: FL
          Latitude: 27 16 56.5 Longitude: 80 28 58.6 (NAD83)
                                 02-27-2017

The Office of Science and Technology Bulletin, No. 65, October
1985 and revised August 1997, specifies that the maximum level
of non-ionizing radiation that a person may be exposed to over a
six minute period is an average power density equal to 5 mW/cm**2
(five milliwatts per centimeter squared) for a controlled
environment. For an uncontrolled environment, the maximum level
of non-ionizing radiation that a person may be exposed to over a
thirty minute period is an average power density equal to 1 mW/cm**2
(one milliwatt per centimeter squared). It is the purpose of this
report to determine the maximum power flux densities of the earth
station in the far zone, near zone, transition zone, at the main
reflector surface, and between the antenna edge and the ground.


Parameters which were used in the calculations:
===============================================

Antenna Diameter,                 (D) = 6.5000 m

Antenna Surface Area             (Sa) =   pi(D**2)/4        = 33.1831 m**2

Wavelength at 6.8000 GHz     (lambda) = 0.0441 m

Transmit Power at Flange          (P) = 88.0000 Watts

Antenna Gain at Earth Site      (GES) = 51.5000 dBi     =     141253.7545
                                                                 Power Ratio:
                                                                AntiLog(GES/10)
pi                                    =    3.1415927

Antenna Aperture Efficiency       (n) = 0.6000


1. FAR ZONE CALCULATIONS
========================

Distance to the Far Zone      (Df) =     (n)(D**2)    = 574.8299 m
                                         ---------
                                          lambda


Far Zone Power Density        (Rf) =     (GES)(P)     = 2.9936 W/m**2
                                       ------------
                                       4*pi*(Df**2)
                                                      = 0.2994 mW/cm**2




2. NEAR ZONE CALCULATIONS
=========================

Power Flux Density is considered to be at a maximum value
throughout the entire length of this Zone. The Zone is
contained within a cylindrical volume which has the same diameter
as the antenna. Beyond the Near Zone, the Power Flux Density
will decrease with distance from the Antenna.

Distance to the Near Zone     (Dn) =       D**2       = 239.5125 m
                                         --------
                                         4*lambda


Near Zone Power Density       (Rn) =     16.0(n)P     = 6.3647 W/m**2
                                         --------
                                         pi(D**2)

                                                      = 0.6365 mW/cm**2




3. TRANSITION ZONE CALCULATIONS
===============================

The Power Density begins to decrease with distance in the
Transition Zone. While the Power Density decreases inversely with
distance in the Transition Zone, the Power Density decreases
inversely with the square of the distance in the Far Zone.
Since the maximum Power Density in the Transition Zone will not
exceed the Near Zone values, it is not calculated.


4. MAIN REFLECTOR ZONE
======================

Main Reflector Power Density       =       2(P)       = 5.3039 W/m**2
                                           ----
                                            Sa
                                                      = 0.5304 mW/cm**2




5. ZONE BETWEEN THE MAIN REFLECTOR AND THE GROUND
=================================================

Applying uniform illumination of the Main Reflector Surface:

Main to Ground Power Density       =         P        = 2.6520 W/m**2
                                            ----
                                             Sa
                                                      = 0.2652 mW/cm**2


                       CALCULATED SAFETY MARGINS SUMMARY
                                 AND EVALUATION

--------------------------------------------------------------------------
  Controlled Safety Margin = 5.0 - Calculated Zone Value (mW/cm**2)
--------------------------------------------------------------------------

                                     Safety
     Zones                           Margins      Conclusions
                                    (mW/cm**2)
----------------------------       ------------   ----------------------------
1. Far Zone                             4.7006    Complies with ANSI

2.   Near Zone                          4.3635    Complies with ANSI

3.   Transition Zone               Rf < Rt < Rn   Complies with ANSI

4.   Main Reflector Surface             4.4696    Complies with ANSI

5.   Main Reflector to Ground           4.7348    Complies with ANSI



--------------------------------------------------------------------------
  Uncontrolled Safety Margin = 1.0 - Calculated Zone Value (mW/cm**2)
--------------------------------------------------------------------------

                                     Safety
     Zones                           Margins      Conclusions
                                    (mW/cm**2)
----------------------------       ------------   ----------------------------
1. Far Zone                             0.7006    Complies with ANSI

2.   Near Zone                          0.3635    Complies with ANSI

3.   Transition Zone               Rf < Rt < Rn   Complies with ANSI

4.   Main Reflector Surface             0.4696    Complies with ANSI

5.   Main Reflector to Ground           0.7348    Complies with ANSI




6. EVALUATION
==============

A. Controlled Environment
B. Uncontrolled Environment
     All Zones comply with ANSI Standards.


                           III.      FCC Letter to ANATEL



                                   FEDERAL COMMUNICATIONS COMMISSION
                                          INTERNATIONAL BUREAU
                                         WASHINGTON, D.C. 20554

                                   fax: +1 202 418 1208; TWX: 710 822 0160

                                                                                  In reply,refer to:
                                                                                800C2/SEB16174
Telefax message:

To: Agência Nacional de Telecomunicações - ANATEL
     Assessoria Internacional
     SAUS-Quadra 6 - Bloco H - 4th Floor
     70070-940 BRASILIA, DF
     Brazil
     TELEFAX NO.: 011 + 55 61 23122244 C

CC: ITU Radiocommunication Bureau
    Geneva, Switzerland
    Telefax no.: 41 22 730 5785

Date: 27 April 2016

Subject: Agreement under §6.6 of Article 6 of Appendix 30B

References: 1) Special Section AP30B/A6A/333, BRIFIC 2744 dated 22.07.2014, concerning
the
               B-SAT-3R-1 satellite network.
            2) Our letter 800C2/SEB14393, dated 30.10.2014
            3) Your letter CT. n°163/ORER-Anatel dated 25.09.2015

The US administration thanks the administration of Brazil for its request for agreement
regarding the operation of the B-SAT-3R-1 satellite network in the 6725-7025 MHz (Earth to
space) and 4500-4800 MHz (space to Earth), 10.70-10.95 GHz (space to Earth), 11.20-11.45
GHz (space to Earth) and 12.75-13.25 GHz (Earth to space) planned bands of APP30B. The US
administration is pleased to provide its agreement under the provision §6.6 of Appendix 30B
for inclusion of its territory in the service area of the B-SAT-3R-1 satellite network. However,
this agreement does not guarantee market access to the US. Any earth station located within
US territory seeking to communicate with the B-SAT-3R-1 satellite network must first be
licensed in accordance with US laws and regulations. Any operation of the satellites would be
in accordance with international Radio Regulations and relevant provisions. Any such license
application may or may not be granted.

REGARDS
FEDCOMCOM
SATELLITE DIVISION
Direct Fax No.: +1 202 418 1208 (preferred)
          or +1 202 418 0398 (alternative)
Email: IBmail@fcc.gov

Authorized:   J. Payton
              International Bureau/SD
                                   ******




                                               7


                         IV. Frequency Coordination Notice
                             Micronet Communications, Inc.
                                      720 F Avenue, Suite 100
                                         Plano, Texas 75074
                                            972-422-7200
                          SUPPLEMENTAL SHOWING PART 101.103(D)

File Number: M1700303                   6.72 GHz
Licensee: United Teleports Inc                                                 Page 1
_____________________________________________________________________________________

Pursuant to Parts 25.203 and 101.103(d) of the FCC Rules and Regulations, a frequency
coordination study was conducted by Micronet Communications, Inc. for the following
proposed earth station:

  Port Saint Lucie, FL

The results of the study indicate that no unacceptable interference will result with
existing, proposed or prior coordinated radio facilities.

Coordination was performed with existing, proposed and prior coordinated carriers
within coordination range on the following dates:

  02/02/2017   Original PCN (Expedited response requested by 02/16/2017)
               There were no unresolved interference objections.

The attached coordination data was forwarded on the latest date to the following
parties within coordination range or their authorized coordination agents:

     BREVARD COMMUNITY COLLEGE
     BREVARD, COUNTY OF
     BROWARD COUNTY BOARD OF COUNTY COMMISSIONERS
     CITY OF CORAL SPRINGS
     COMSEARCH INC
     FLORIDA, STATE OF
     HARRIS CORPORATION
     HIGHLANDS COUNTY
     INDIAN RIVER, COUNTY OF
     MARTIN, COUNTY OF
     OSCEOLA COUNTY INTERGOVERNMENTAL COMMUNICATIONS
     PALM BEACH COUNTY OF
     PALM BEACH, COUNTY OF
     POLK, COUNTY OF
     RADIO DYNAMICS
     SOUTH FLORIDA WATER MANAGEMENT DISTRICT
     VERIZON WIRELESS PERSONAL COMMUNICATIONS LP
     WEST PALM BEACH, CITY OF


                                          Respectfully Submitted,




                                          Jeremy Lewis
                                           Systems Engineer

Attached: 1 data sheet


                               Micronet Communications, Inc.
                                  720 F Avenue, Suite 100
                                    Plano, Texas 75074
                                       972-422-7200

File: M1700303

==========================================================================
          TECHNICAL CHARACTERISTICS OF TRANSMIT ONLY EARTH STATION
==========================================================================

Company:                        United Teleports Inc
Site Name, State:               Port Saint Lucie, FL
Call Sign:                      E160081
Latitude                          (NAD83)        27 16 56.5 N
Longitude                         (NAD83)        80 28 58.6 W
Elevation AMSL                    (ft/m)        24.61       7.50
Receive Frequency Range           (MHz)
Transmit Frequency Range          (MHz)        6725-7025
Range of Satellite Orbital Long. (deg W)        64.00      66.00
Range of Azimuths from North      (deg)        147.16     150.60
Antenna Centerline                (ft/m)        21.33       6.50
Antenna Elevation Angles          (deg)         53.28      54.32

--------------------------------------------------------------------------
Equipment Parameters                           Transmit
--------------------------------------------------------------------------

Antenna Gain, Main Beam             (dbI)        51.00
15 DB Half Beamwidth                (deg)         0.84

Antennas         Transmit: COMMSCOPE ES65-1

Max Transmitter Power             (dbW/4KHz)                -21.41
Max EIRP Main Beam                (dbW/4KHz)                 29.59
Modulation / Emission Designator   DIGITAL   1M00G7W 36M0G7W
     54M0G7W
--------------------------------------------------------------------------
Coordination Parameters                        Transmit
--------------------------------------------------------------------------

Max Greater Circle Distances        (km)        113.01
Max Rain Scatter Distances          (km)        100.00
Max Interference Power Long Term    (dbW)      -154.00
Max Interference Power Short Term   (dbW)      -130.80
Rain Zone / Radio Zone                           1             A


                                     Horizon Angle & Satellite Arc for Port Saint Lucie, FL
                                               Micronet Communications, Inc.
              90                                                                     Satellite Arc
                                                                                     Horizon Angle
              80
              70
              60
Elevation Angle (degrees)
  30       40 20
              10
              0    50




                            0   30    60     90    120      150     180      210   240    270        300   330   360
                                                         Earth Azimuth (degrees)


                                        Horizon Gain for Port Saint Lucie, FL
                                          Micronet Communications, Inc.
             30
             20
             10                                                                     Transmit
Horizon Gain (decibels)
 -10          0
             -20
             -30




                          0   30   60   90   120      150     180      210   240   270    300   330   360
                                                   Earth Azimuth (degrees)


                                                 Minimum Discrimination Angles for Port Saint Lucie, FL
                                                           Micronet Communications, Inc.
                     180
                     160
                     140          120
   Discrimination Angle (degrees)
40      60       80  20
                     0   100




                                        0   30     60     90   120      150     180      210   240   270   300   330   360
                                                                     Earth Azimuth (degrees)


                                                  Final Contour & Rain Scatter
                                               for Port Saint Lucie, FL - Transmit
                                                                    Final Contour
                                                                    Rain Scatter




              90         88           86              84             82             80             78            76        74        72        70
   36                                                                                                                                               36
                                   Nashville

              Memphis
tle Rock
                                                                                                 Raleigh
                                                                                                                                                    34
   34

                                                                              Columbia
                               Birmingham            Atlanta



           Jackson                                                                       Charleston
   32                               Montgomery                                                                                                      32
                                                                              Savannah



 Baton Rouge
                                                     Tallahassee          Jacksonville                                                              30
   30      New Orleans




                                                                           Orlando                                                                  28
   28




   26                                                                                                                                               26

                                                                                     Miami




   24                                                                                                                                               24




   22                                                                                                                                               22




   20                                                                                                                                               20




                   88         86                84                 82                80                 78            76        74        72




                                                               SCALE - 1:10000000         1 inch = 157.8 miles


  Email to Coordinators Re: Coordination Notice Update

-----Original Message-----
From: jlewis@micronetcom.com [mailto:jlewis@micronetcom.com]
Sent: Monday, February 27, 2017 1:40 PM
To: cnalda@lmiadvisors.com
Cc: jlewis@micronetcom.com; frequencyprotection@micronetcom.com
Subject: PCN M1700303 - United Teleports Inc

Enclosed is a copy of the Prior Coordination Notice sent to all affected
carriers.
Please let me know if you have any questions or if I can be of further
assistance.

RE: United Teleports Inc



 Micronet File Number(s): M1700303
 Path Count: 1    State(s): FL   Band(s): 6.7


 *** Minor Modification - Satellite Earth Station ***

Dear Coordinator:

A radio frequency study of the above referenced system has been conducted
and no interference problems were indicated.

We are enclosing this frequency coordination notice for your review in
compliance with the rules and regulations of the F.C.C., Part 25.203 (C).

Please find attached the corresponding path data sheet(s) and click on the
link below to view the system diagram in Google Earth (kmz file).

www.micronetcom.com/pcn/E6B7F6

Please update your database accordingly with the underlined changes on the
attached data sheets. This data change notification is for your information
only, and no response is required.

Please call if you should have any questions.

Frequency Protection
Micronet Communications, Inc.
720 F Ave Suite 100
Plano, TX 75074
(972) 422-7200
epcn@micronetcom.com

Sincerely,
Jeremy Lewis


                            (Coordination Change Notification)
                              Micronet Communications, Inc.
                                       720 F Avenue, Suite 100
                                          Plano, Texas 75074
                                             972-422-7200
                          SUPPLEMENTAL SHOWING PART 101.103(D)

File Number: M1700303                   6.72 GHz
Licensee: United Teleports Inc                                                 Page 1
_____________________________________________________________________________________

Pursuant to Parts 25.203 and 101.103(d) of the FCC Rules and Regulations, a frequency
coordination study was conducted by Micronet Communications, Inc. for the following
proposed earth station:

  Port Saint Lucie, FL

The results of the study indicate that no unacceptable interference will result with
existing, proposed or prior coordinated radio facilities.

Coordination was performed with existing, proposed and prior coordinated carriers
within coordination range on the following dates:

  02/27/2017   No-impact change notification pursuant to Section
               101.103(d)(2)(ix) - No response required.
  02/02/2017   Original PCN (Expedited response requested by 02/16/2017)
               There were no unresolved interference objections.

The attached coordination data was forwarded on the latest date to the following
parties within coordination range or their authorized coordination agents:

     BREVARD COMMUNITY COLLEGE
     BREVARD, COUNTY OF
     BROWARD COUNTY BOARD OF COUNTY COMMISSIONERS
     CITY OF CORAL SPRINGS
     COMSEARCH INC
     FLORIDA, STATE OF
     HARRIS CORPORATION
     HIGHLANDS COUNTY
     INDIAN RIVER, COUNTY OF
     MARTIN, COUNTY OF
     OSCEOLA COUNTY INTERGOVERNMENTAL COMMUNICATIONS
     PALM BEACH COUNTY OF
     PALM BEACH, COUNTY OF
     POLK, COUNTY OF
     RADIO DYNAMICS
     SOUTH FLORIDA WATER MANAGEMENT DISTRICT
     VERIZON WIRELESS PERSONAL COMMUNICATIONS LP
     WEST PALM BEACH, CITY OF


                         Micronet Communications, Inc.
                                720 F Avenue, Suite 100
                                  Plano, Texas 75074
                                     972-422-7200

                          SUPPLEMENTAL SHOWING PART 101.103(D)

File Number: M1700303                   6.72 GHz
Licensee: United Teleports Inc                                                 Page 2
_____________________________________________________________________________________



                                          Respectfully Submitted,




                                          Jeremy Lewis
                                           Systems Engineer

Attached: 1 data sheet


                               Micronet Communications, Inc.
                                  720 F Avenue, Suite 100
                                    Plano, Texas 75074
                                       972-422-7200

File: M1700303

==========================================================================
          TECHNICAL CHARACTERISTICS OF TRANSMIT ONLY EARTH STATION
==========================================================================

Company:                        United Teleports Inc
Site Name, State:               Port Saint Lucie, FL
Call Sign:                      E160081
Latitude                          (NAD83)        27 16 56.5 N
Longitude                         (NAD83)        80 28 58.6 W
Elevation AMSL                    (ft/m)        24.61       7.50
Receive Frequency Range           (MHz)
Transmit Frequency Range          (MHz)        6725-7025
Range of Satellite Orbital Long. (deg W)        64.00      66.00
Range of Azimuths from North      (deg)        147.16     150.60
Antenna Centerline                (ft/m)        21.33       6.50
Antenna Elevation Angles          (deg)         53.28      54.32

--------------------------------------------------------------------------
Equipment Parameters                           Transmit
--------------------------------------------------------------------------

Antenna Gain, Main Beam             (dbI)        51.50
15 DB Half Beamwidth                (deg)         0.84

Antennas         Transmit: COMMSCOPE ES65-1

Max Transmitter Power               (dbW/4KHz)                -21.10
Max EIRP Main Beam                  (dbW/4KHz)                 30.40
Modulation / Emission Designator     DIGITAL   45M0G7W 30M0G7W

--------------------------------------------------------------------------
Coordination Parameters                        Transmit
--------------------------------------------------------------------------

Max Greater Circle Distances        (km)        113.61
Max Rain Scatter Distances          (km)        100.00
Max Interference Power Long Term    (dbW)      -154.00
Max Interference Power Short Term   (dbW)      -130.80
Rain Zone / Radio Zone                           1             A


         V. CERTIFICATION OF PERSON RESPONSIBLE FOR PREPARING
                       ENGINEERING INFORMATION

       I hereby certify that I am the technically qualified person responsible for

preparation of the engineering information contained in this application, that I am

familiar with Part 25 of the Commission’s rules that I have either prepared or reviewed

the engineering information submitted in this application, and that it is complete and

accurate to the best of my knowledge and belief.




                                                                             /s/
                                                                     ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
                                                                     Humberto Hennriques
                                                                     Telecomm Strategies



                                                                     February 27, 2017




                                             9



Document Created: 2017-02-28 07:48:34
Document Modified: 2017-02-28 07:48:34

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC