Attachment 20160802130646.pdf

20160802130646.pdf

DECISION submitted by FCC-IB

Grant

2016-08-02

This document pretains to SES-MOD-20150921-00607 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2015092100607_1145272

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                               RADIO STATION AUTHORIZATION

 Name: Global Crossing Americas Solutions, Inc.                                                                 Call Sign: E110150
 Authorization Type: Modification of License                                                                 File Number: SES—MOD—20150921—00607
 Non Common Carrier                Grant date: —04/29/2016                           Expiration Date:—        01/25/2027            :




Nature of Service: Fixed Satellite Service
Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                                  Elevation         ecial Provisions
#. Site ID                              Address                           Latitude          Longitude              (Meters)    NAD (Refer to Section H)
1i                       80 Hato Bajo                                18928 637. 9"         ec945‘16..3*W             16.2        83
                        Arecibo, Arecibo, PR 00612

                         Licensee certifies antenna(s) comply with gain patterns specified in Section 25.209


Subject to the provisions ofthe Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
belowfor radio communications for the termbeginning January23, 2012 (3 AM Eastern Standard Time)_ and ending January
25, 2027 (3 AM Eastern Standard Time) . The required date ofcompletion ofconstruction and commencement of operation is
April 29, 2017 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to alltransmitting frequencybands.
For the text of these provisions, refer to Section H.
                                                                              Max    Max EIRP                            Special
                                                                             EIRP     Density                          Provisions
             Frequency                Polarization                Ta/Rx     /Carrier /CaFrit? Associated                (R:_&r 59—    Modulation/
#              (MHz)                       Code          Emission Mode      (dBW) (dBWAKH2) Anjenna                    Section H)      Services

1) e382.0000—6423.0000                   wy             soke70      rx       a3.98           anlee       i                            prorzat pata carrter
2) s3e2.0000—6423.0000                   my             1130670    rx        19.00           as.so       1                            Digital Voice and Data
31 e382.0000—6423.0000                   my             2308070    re        42.00           2a.40       1                            Digital Voice and Data
4) s094.0000—6124.0000                   my             750R070     rx       a3.92           2nlge       i                            prerzat para carrtsr
51 sos4 . 0000—6124 . 0000               my             130070     x         49.00           as.s0       1                            Digital Voice and Data
81 sos4.0000—62124.0000                  my             230R67D    x         42.00           2a.40       2                            Digital Voice and bata
7) 3700.0000—4200 0000                   my             sMa5G7D    rx                                    1                            prerzat pata carrts®
81 3700 .0000—4200 . 0000                wy             2308070    rx                                    i                            Digital Voice and Data
21 3700.0000—4200.0000                   wy             2423070    rx                                    i                            Digital Voice and Data



                                                                    (page 1 of 4)                                                          FCC Form 488


                                                           UNITED STATES OF AMERICA
                                              FEDERAL COMMUNICATIONS COMMISSION

                                             RADIO STATION AUTHORIZATION

Name: Global Crossing Americas Solutions, In m                                                            Call Sign: E1 10150
Authorization Type: Modification of License                                                            File Number: SES—MOD—20150921—00607
Non Common Carrier                           Grant date:    04/29/2016            Expiration Date:     01/25/2027




C) Frequency Coordination Limits
                                                    Satellite Are             Elevation               Azimuth         Max EIRP
               5               5t                   (Deg. Long.)              (Degrees)               (Degrees)     Density toward
                   requency Limits                  East      West          East       West       East       West         Horizon           Associated
#                     (MHz)                       Limit       Limit        Limit       Limit     Limit       Limit (dBWAkHz)                Antenna(s)
1)          6094 .0000—6124 .0000                   45 . Oi~ 56 . OW         §7.0—65.1               128.5—149.1          ~30.72        1

2)          6382.0000—6423 . 0000                   45. 0#—56 . OM           57.0—65.1               120.5—149.1          ~30.72        1
3)          3700 .0000—4200 . 0000                  45. O#—56 O              57.0—65.1               128.5—149.1                        1



D) Points of Communications
      The following stations located in the Satellite orbits consistentwith Sections B and C ofthis Entry:

     1) I to Permitted Space Station List

E) Antenna Facilities
                                                                                                                      .                                   Special
                                                                                                                     Site                Max             Provisions
     Site              Antenna                 Diameter                                                           Elevatiof         Antenna Height        (Refer to
     TD                   ID         Units     —(meters)        Manufacturer               Model number           (Meters)             (Meters)          Section H)
                           1           1          224                  Prodelin                  1251             16.2        7.3 AGL/ 23.5 aMSL

          Max Gains (s) :             30.0 dai o            3.9500 Gifz             42.0 dBi c           6.1750 Gifz
          Maximum total input power at antenna flange (Watts) =                                       s.00
          Maximum aggregate output EIRP for all carriers (dBw) =                                     49.00



G) Antenna Structure marking and lighting requirements:
            None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
       A)This RADIO STATION                   AUTHORIZATION is granted subject to the following special provisions and general
            conditions:
            1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
                       signal at associated station(s).      Maximum EIRP and maximum EIRP density are not applicable to receive
                       operations.
            2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted. June 16, 1972 (35
                     FCC 24 844) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
                     16495 and is subject to the pol licies adopted in that proceeding.




                                                                  (page 2 of 4)                                                             FCC Form488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Global Crossing Americas Solutions, Inc.                                         Call Sign: E110150
Authorization Type: Modification of License                                         File Number: SES—MOD—20150921—00607
Non Common Carrier                Grant date: 04/29/2016           Expiration Date: 01/25/2027




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
              power flux density levels exceed the specified guidelines.
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign ofthe antenna, (4)
              date of the license, (§5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
              of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
              1.1311. See 47 CFR § 1.1307 (b) (5).
     5216 ——— All operations shall be on a non—common carrier basis.




                                                      ( page 3 of 4 )                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Global Crossing Americas Solutions, Inc.                                          Call Sign: E110150
Authorization Type: Modification of License                                         File Number: SES—MOD—20150921—00607
Non Common Carrier                Grant date:    04/29/2016      Expiration Date:    01/25/2027




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neitherthis authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation ofthis station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, norin any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction ofor modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
              completion of construction unless an application for modification ofauthorization to request additional time to
              complete construction is filed by that date, together with a showing that failure to complete construction by the
              required date was due to factors not under control ofthe grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, internationaland policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     (page 4 of4)                                                   FCC Form 488



Document Created: 2016-08-02 13:07:03
Document Modified: 2016-08-02 13:07:03

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC