Attachment Response to Q. 43

This document pretains to SES-MOD-20121001-00872 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2012100100872_967774

    RESPONSE TO QUESTION 43: DESCRIPTION OF PROPOSED MODIFICATION

        As part of a comprehensive solution that would permit LightSquared to commence

operation of a new, competitive terrestrial broadband network while also addressing issues raised

by the GPS industry, LightSquared Subsidiary LLC (“LightSquared”) hereby seeks to modify its

license authorizing it to provide mobile satellite service (“MSS”) and MSS-ATC service. The

proposals LightSquared is making in this application for modification (“Application”) and in a

separate petition for rulemaking 1 constitute a long-term solution that balances promoting

compatibility with GPS receivers with the growing national imperative to devote large blocks of

additional spectrum, in particular MSS spectrum, for wireless broadband.

        Grant of this Application will remove obstacles that have prevented LightSquared from

constructing and operating the type of commercially and technically viable nationwide mobile

broadband network that LightSquared is able to deploy more quickly than any other potential

new entrant. The public interest benefits that will flow from this Application are substantial, as

recognized by the Commission when it authorized the deployment of the LightSquared network

in the Harbinger Transfer Order. At that time, the Commission found that LightSquared’s 4G

mobile wireless broadband would provide significant public interest benefits, including

enhancing competition among current mobile wireless providers and providing mobile wireless

broadband service to traditionally underserved areas. 2 With this proposal, LightSquared




1
    LightSquared is filing contemporaneously herewith a petition for rulemaking (“Rulemaking
    Petition”) regarding terrestrial operations in LightSquared’s lower 10 MHz downlink band at
    1526-1536 MHz. In an additional separate filing, LightSquared has requested that the
    Commission confirm that all of the milestones in the Harbinger Transfer Order are now
    mooted and that the Commission establish new milestones at a future date. See LightSquared
    Ex Parte Communication and Request for Action, IB Docket Nos. 08-184, 11-109; ET
    Docket No. 10-142; IBFS File no. SAT-MOD-2010118-00239 (filed Sept. 24, 2012); see also
    In re SkyTerra Communications, Inc., Memorandum Opinion and Order and Declaratory
    Ruling, 25 FCC Rcd 3059, 3087-3088 (Chiefs IB, OET, and WTB 2010) (“Harbinger
    Transfer Order”).
2
    Harbinger Transfer Order, 25 FCC Rcd at 3087-3088.


DC\2307076.3


provides the Commission with an appropriate vehicle to realize these and other substantial public

interest benefits. 3

I.       LIGHTSQUARED’S PROPOSED LICENSE MODIFICATION
         In this Application, LightSquared proposes a comprehensive approach comprised of

interrelated elements for addressing issues that have precluded even the initial deployment of its

mobile broadband network. This approach would serve the public interest in the near term by

establishing a path forward for LightSquared to proceed with building and providing service over

a commercially viable wireless broadband network that provides greater access, choice, and

competition for all Americans. LightSquared’s proposed license modification consists of the
following mutually-dependent and interrelated elements:

         •       Permanently relinquish its authority to conduct terrestrial operations in its upper

                 10 MHz downlink band at 1545-1555 MHz—the part of LightSquared’s downlink

                 band that is closest to the GPS band—thus providing GPS receivers an additional

                 10 MHz guardband from terrestrial services.

         •       Submit the issue of rules for LightSquared’s eventual terrestrial use of its lower

                 10 MHz downlink band at 1526-1536 MHz to a separate rulemaking proceeding,

                 as proposed in the Rulemaking Petition. During the pendency of that rulemaking

                 proceeding, LightSquared, voluntarily, would not deploy its lower 10 MHz

                 spectrum on its terrestrial network.


3
     In response to Congressional inquiry regarding the Commission’s consideration of
     authorizing LightSquared to use alternative spectrum for commercial broadband use,
     Chairman Genachowski stated that LightSquared had not at that time submitted a petition
     regarding such use. See Letters from Julius Genachowski, Chairman, to the Hon. James P.
     Moran, the Hon. Steven R. Rothman, the Hon. Maurice D. Hinchey, the Hon. Ander
     Crenshaw, and the Hon. Rodney Alexander (Aug. 13, 2012). Chairman Genachowski further
     stated: “Should that change, the Commission will coordinate with NTIA as necessary, and
     consider any proposals carefully.” Id. LightSquared now submits such a proposal.
     Coordination between the Commission and NTIA to achieve the most efficient use of
     spectrum is, of course, a crucial part of each agency’s mission.

                                                   2

DC\2307076.3


        •      In lieu of any terrestrial use of its upper 10 MHz downlink band, LightSquared

               initially would employ alternative (non-L-Band) spectrum, comprised of a

               contiguous 10 MHz band at 1670-1680 MHz, which would provide the needed

               coverage for its terrestrial network. Only after this alternative spectrum has been

               secured, and in accordance with the schedule, terms, and conditions that are

               expected to be developed in the rulemaking it has proposed, LightSquared

               anticipates using the lower 10 MHz L-Band downlink band to provide additional

               capacity as needed. The alternative 10 MHz of downlink spectrum to be used

               initially consists of:

               o 1670-1675 MHz, which LightSquared already has authority to use nationwide,

                   and

               o 1675-1680 MHz, which LightSquared proposes to share with certain existing

                   federal government users. LightSquared seeks authority to use the 1675-1680

                   MHz band to provide a commercially-useable, terrestrial wireless broadband

                   service as part of a contiguous 10 MHz downlink channel. Given its present

                   use of the 1670-1675 MHz band, LightSquared has extensive experience

                   coordinating this existing 5 MHz with the adjacent band used by the federal

                   government. Thus, LightSquared is uniquely suited to use this entire

                   contiguous 10 MHz band in a manner that will protect the integrity of

                   continuing, essential government operations in 1675-1680 MHz and the

                   adjacent spectrum at 1680-1695 MHz. LightSquared’s proposal to access

                   spectrum used by federal agencies as proposed in this Application is

                   supported by prior precedents for such use and would substantially serve

                   federal interests in facilitating efficient spectrum use, dedicating additional

                   spectrum to mobile broadband, and deploying a new, competitive broadband

                   network, with particular emphasis on rural and underserved communities.


                                                 3

DC\2307076.3


        •      LightSquared would continue to use its two 10 MHz uplink bands at 1627.5-

               1637.5 and 1646.7-1656.7 MHz under their existing technical parameters and

               match them with an alternative downlink channel at 1670-1680 MHz in an

               operationally-efficient and commercially-viable manner.

        Accordingly, in this Application, LightSquared specifically proposes to vacate the 10

MHz of its terrestrially licensed spectrum closest to GPS, which will provide GPS receivers a

permanent guardband from terrestrial services, and to gain access to 5 MHz of alternate

spectrum, so that it can begin to build a mobile broadband network that will promote jobs and

innovation and enhance safety for consumers by offering greater access and reliability.

        In sum, in a result that will balance the needs of all stakeholders while maximizing the

public interest benefits of a new, competitive broadband network, LightSquared proposes to

change its historical plans for deploying in 40 MHz of the L-Band as the centerpiece of its 45

MHz terrestrial network (including 5 MHz at 1670-1675), by permanently relinquishing its right

to use terrestrially its upper 10 MHz L-Band downlink, and by not deploying terrestrially in its

lower 10 MHz L Band downlink during the pendency of its proposed rulemaking. Thus,

LightSquared would initially utilize only 20 MHz of its L-Band spectrum (the uplinks), as well

as its existing 5 MHz at 1670-1675 and the proposed 5 MHz at 1675-1680 MHz (the downlinks),

for 30 MHz total. LightSquared has invested billions of dollars in developing its terrestrial

network, and while it is proposing to reduce the amount of spectrum to be used on this terrestrial

network to accommodate concerns regarding GPS compatibility, grant of this Application still

would enable LightSquared to immediately expand on its existing, multi-billion dollar

investment to build a network that brings more competition, choice and access to hundreds of

millions of Americans more quickly than any other potential new wireless network operator.




                                                 4

DC\2307076.3


II.       THE PROPOSED LICENSE MODIFICATION IS CONSISTENT WITH THE
          COMMISSION’S OBLIGATION TO CONSIDER CONSTRUCTIVE
          SOLUTIONS TO SPECTRUM CONTROVERSIES
          LightSquared has demonstrated in other contexts that terrestrial operations in the MSS

portions of the L-Band would be fully consistent with its longstanding authorizations, the

Commission’s service rules, and applicable technical standards. 4 Nevertheless, LightSquared
remains willing to explore constructive solutions that would address concerns raised by the GPS

industry and others, while still allowing LightSquared to provide commercial service over its

terrestrial network. The specific proposal advanced by LightSquared in this Application offers

such a solution.

          Notably, ample Commission precedent exists for this sort of solution—particularly when

viewed as necessary to provide a substantial public interest benefit, such as addressing concerns

about compatibility with other spectrum users. For example, the Commission relocated the

Digital Electronic Messaging Service (“DEMS”) from the 18 GHz Band to the 24 GHz Band

based on national security concerns. 5 In that case, the Commission acted at the request of NTIA,

in order to address Department of Defense concerns regarding potential interference from DEMS

into military satellite earth stations in Denver and Washington, D.C. operating in the 18 GHz

Band. By relocating DEMS to the 24 GHz Band and providing DEMS access to twice the

amount of spectrum originally licensed, the Commission resolved these concerns, as well as

concerns about the sharing of the 18 GHz Band with commercial satellite services. 6




4
      See LightSquared Petition for Declaratory Ruling, IB Docket No. 11-109, at 11-18 (filed Dec.
      20, 2011); Comments in Opposition of LightSquared Inc., IB Docket No. 11-109 (Mar. 16,
      2012).
5
      See Amendment of the Commission’s Rules to Relocate the Digital Electronic Message
      Service From the 18 GHz Band to the 24 GHz Band and to Allocate the 24 GHz Band for
      Fixed Service, 12 FCC Rcd 3471 (1997); aff’d, 13 FCC Rcd 15147 (1998).
6
      In doing so, the Commission invoked the “military function” exception to the Administrative
      Procedures Act, facilitating Commission action within approximately two months and without
      notice and comment procedures. See 5 U.S.C. § 553(a)(1).
                                                  5

DC\2307076.3


          The Commission also effected a similar spectrum rationalization when it reconfigured the

800 MHz Band to resolve interference issues resulting from the differing uses of the interleaved

channels in the band. 7 In recognition of the “public interest benefit derived from robust and

reliable public safety communications,” as well as the spectrum rights surrendered by Nextel in

the 800 MHz Band, the Commission provided Nextel with spectrum in the 1.9 GHz Band. 8

          More recently, the Commission has recognized the potential for interference from

MSS/ATC operations in the 2 GHz Band into adjacent personal communications service (“PCS”)

and advanced wireless service (“AWS”) operations. In order to mitigate such potential, the

Commission has proposed to reconfigure the 2 GHz Band 9 in order to “release a greater quantity
of usable spectrum into the marketplace, reduce the need for guard bands to protect against

harmful interference, and extend the existing PCS and AWS bands” – all of which would benefit

the public. 10

          In short, the Commission has recognized the public interest benefits of considering

spectrum-based alternatives, such as those proposed in this Application, before adversely

modifying the authority of an existing licensee based on concerns about compatibility with other

spectrum users.




7
     See Improving Public Safety Communications in the 800 MHz Band, 19 FCC Rcd 14969
     (2004).
8
     Id. at ¶ 5.
9
     See Fixed and Mobile Services in the Mobile Satellite Service Bands at 1525-1559 MHz and
     1626.5-1660.5 MHz, 1610-1626.5 MHz and 2483.5-2500 MHz, and 2000-2020 MHz and
     2180-2200 MHz, Notice of Proposed Rulemaking and Notice of Inquiry, ET Docket No. 10-
     142, at ¶ 140 (Mar. 21, 2012) (“2 GHz NPRM and NOI”).
10
     Id. at ¶ 137.
                                                  6

DC\2307076.3


III.     THE PROPOSED LICENSE MODIFICATION WOULD YIELD SUBSTANTIAL
         PUBLIC INTEREST BENEFITS

         A.      The Need for Additional Spectrum for Mobile Broadband Remains as Acute
                 as Ever.
         An urgent and fast-growing need exists for additional spectrum to be made available to

support mobile broadband services. Both the public and private sectors broadly acknowledge

this fact. Each of the President’s Council of Economic Advisors and the Commission has

recognized that mobile data traffic is estimated to grow by a factor of 15 to 20 times over the

next five years. 11 As a result, the President’s Council has concluded that the “only feasible way
to realize the full potential of wireless broadband is to make new spectrum available for wireless

services.” 12 Similarly, the Commission has recognized that this “explosive growth is creating an

urgent need for more network capacity and, in turn, suitable spectrum.” 13 As Chairman

Genachowski succinctly stated, “[d]emand for spectrum is rapidly outstripping supply.” 14 This

sentiment is shared and echoed by both the private sector and lawmakers on both sides of the

aisle. As CTIA notes, the wireless industry along with a “bipartisan group of lawmakers in the




11
     See, e.g., Executive Office of the President, Council of Economic Advisers, The Economic
     Benefits of New Spectrum for Wireless Broadband, at 2 (Feb. 2012) (“Industry forecasters
     expect that a rapid pace of growth in data traffic will continue for at least the next few years.
     For example, one industry forecaster projects that mobile data traffic will increase by a factor
     of 20 between 2010 and 2015. It is unlikely that wireless carriers will be able to accommodate
     this surging demand without additional spectrum.”) (“CEA Report”); Service Rules for
     Advanced Wireless Services in the 2000-2020 MHz & 2180-2200 MHz Bands, Notice of
     Proposed Rulemaking and Notice of Inquiry, WT Dkt No. 12-70, FCC 12-32, at ¶ 10 (rel.
     Mar. 21, 2012) (“The rapid adoption of smartphones and tablet computers, combined with
     deployment of high-speed 3G and 4G technologies, is driving more intensive use of
     America’s mobile networks. According to Cisco Systems, North American mobile Internet
     traffic more than doubled in 2011 and is expected to grow over 15-fold in the next five
     years.”) (“AWS Service Rules NPRM”).
12
     CEA Report at 1.
13
     AWS Service Rules NPRM ¶ 10.
14
     Julius Genachowski, Chairman, FCC, Remarks on Broadband: The Clock is Ticking, at 5
     (Mar. 16, 2011).
                                             7

DC\2307076.3


House and the Senate, the President, and the Chairman of the FCC” have recognized “a need to

bring additional spectrum to market to fuel what is one of the country’s key industries.” 15

           The economic benefits of expanded spectrum are enormous. CTIA estimates that

“making additional spectrum available to the mobile broadband ecosystem will generate

infrastructure investments of up to $53 billion, provide as much as $151 billion in GDP and

create as many as 771,000 jobs by 2016.” 16 But this promise comes with a warning. President

Obama cautions that the “new era in global technological leadership will only happen if there is

adequate spectrum available to support the forthcoming myriad of wireless devices, networks

and applications that can drive the new economy.” 17 As Chairman Genachowski states more
starkly:
                 If we don’t . . . make much more spectrum available for mobile
                 broadband, we are going to get swamped by an ocean of demand
                 and risk our competitive advantage in the race to lead the world in
                 mobile innovation. American consumers will face slower speeds,
                 more dropped connections, and higher prices. And future
                 innovators will be incentivized to launch their businesses in
                 countries that beat us in the race for the best wireless
                 infrastructure. The price of that will be measured in lost jobs,
                 investment, and innovation. 18
Sounding the same theme, the President and CEO of CTIA has warned that “the U.S.’s leading

role in the world will be undermined unless the growing drought of additional spectrum is not

quickly remedied.” 19


15
     CTIA Statement on Citigroup Spectrum Report (Sep. 26, 2011), available at
     http://www.ctia.org/media/press/body.cfm/prid/2124.
16
     Letter from Steve Largent, President and CEO, CTIA, to Chairman Julius Genachowski,
     Commissioner Robert M. McDowell, and Commissioner Mignon Clyburn, FCC, at 2 (Mar.
     22, 2012) (“Largent Letter”).
17
     President Barack Obama, Unleashing the Wireless Broadband Revolution (Jun. 28, 2010),
     available at http://www.whitehouse.gov/the-press-office/presidential-memorandum-
     unleashing-wireless-broadband-revolution.
18
     Julius Genachowski, Chairman, FCC, Remarks at the Consumer Electronics Show (Jan. 11,
     2012).
19
     Largent Letter at 2.
                                                  8

DC\2307076.3


         While efforts are underway to clear additional spectrum to meet broadband demand,

those efforts appear at best long-term, with little present relief in sight. As Commissioner

McDowell observed recently, “[i]t looks like we’re at a point where we have little or no federal

spectrum going to auction in the near term” so that “it’s very appropriate for us to talk about

imaginative ways to squeeze more efficien[cy] out of the airwaves.” 20 Both the need for more

spectrum and for creative means to support broadband technology are echoed in the views of

NTIA Administrator Lawrence E. Strickling:

                [G]iven the speed at which the demand for spectrum is growing,
                there will be a continuing national need to find spectrum for
                broadband services, even after we reallocate the 500 megahertz as
                directed by the President . . . .

                [T]he old method of clearing spectrum of federal users and then
                making it available for the exclusive use of commercial providers
                is not sustainable. We have moved the easy systems. To continue
                the old method of spectrum reallocation costs too much money and
                takes too long. The industry and their customers, as well as our
                economy, cannot afford the cost and delay. 21
         In short, the need for additional spectrum for mobile broadband services remains more

pressing today than ever. In this regard, the Commission and NTIA have an obligation to

explore every possible solution to the issues of GPS receiver compatibility with authorized L-

Band operations and not to abandon use of L-Band for terrestrial broadband or ignore the

significant public interest benefits of LightSquared’s mobile broadband network, on which the

Commission relied in approving the acquisition of LightSquared’s predecessor, SkyTerra. 22




20
     COMMUNICATIONS DAILY at 5 (July 20, 2012).
21
     Lawrence E. Strickling, Assistant Secretary of Commerce for Communications and
     Information, Remarks at the Release of the Report “Realizing the Full Potential of
     Government-Held Spectrum to Spur Economic Growth” by the President’s Council of
     Advisors on Science and Technology (Jul. 20, 2012).
22
     See Harbinger Transfer Order, 25 FCC Rcd at 3085-88.
                                              9

DC\2307076.3


         B.     The Proposed License Modification Would Avoid Any Risk of GPS Receiver
                “Overload.”
         The prospect of GPS receivers experiencing “overload” when in the vicinity of

LightSquared terrestrial base stations operating in its L-Band downlink spectrum has been the

subject of much debate at the Commission.23 LightSquared’s comprehensive proposal would
address this issue in two ways:

         •      First, LightSquared would permanently relinquish its right to provide terrestrial

                operations in its upper 10 MHz downlink band at 1545-1555 MHz, and would

                permanently relocate those terrestrial operations to 1670-1680 MHz.

         •      Second, LightSquared would defer all terrestrial use in its lower 10 MHz

                downlink band at 1526-1536 MHz while the Commission is actively pursuing,

                through an inclusive rulemaking process, revised rules regarding terrestrial

                operations in that lower 10 MHz downlink band.

Accordingly, under LightSquared’s proposals, GPS receivers would immediately enjoy the

benefit of an additional 10 MHz guardband from terrestrial services.

         C.     Considerable Public Interest Benefits Would Be Realized by Deployment of
                LightSquared’s Network.
         By granting this Application, the Commission would allow LightSquared to deploy a

mobile broadband network that will offer substantial public interest benefits. These benefits
were recognized and relied upon by the Commission when it initially considered LightSquared’s

plan for a mobile broadband network using MSS L-Band spectrum. Then, the Commission

stated that LightSquared’s plan:

         promises the possibility of providing several public interest benefits. Its network will
         provide additional broadband capacity at a time when – as the National Broadband Plan
         noted – the nation is increasing its use of such services exponentially. It will help
         enhance competition among current mobile wireless providers. … We find that
         [LightSquared] plans to provide 4G mobile wireless broadband are a significant public
         interest benefit, both because of the competition it will bring in mobile wireless


23
     See generally IB Docket No. 11-109.
                                                 10

DC\2307076.3


          broadband services and because it will provide mobile wireless broadband service to
          traditionally underserved areas. … 24
The Commission, however, stated the obvious point that these public interest benefits are

“dependent on … [LightSquared’s] actually moving forward with its plan.” 25 Since that time,
despite its best efforts, LightSquared has been thwarted and delayed in implementing its plan

because of concerns about the compatibility between LightSquared’s terrestrial base stations and

GPS receivers. Nevertheless, despite that costly delay, LightSquared still is in the best position

among any potential new broadband network operator to bring the benefits of such a competitive

network to the public.

          In this application, LightSquared has offered a comprehensive solution to the GPS issue

and a way to proceed with deployment of its broadband network. The solution involves

permanently relinquishing LightSquared’s right to deploy terrestrial downlink operations at

1545-1555 MHz and permanently relocating those terrestrial operations instead to 1670-1680

MHz. Without this relocation, LightSquared would not be able to deploy its broadband network

and the substantial promise of that network, as found by the Commission and recognized by

many others, would be lost. Conversely, a grant of the application would: (i) help resolve the

GPS issue regarding terrestrial use of L-Band MSS spectrum, (ii) devote acceptable portions of

the MSS L-Band to broadband terrestrial use in accordance with the national broadband plan,

(iii) develop a new, competitive mobile broadband network, and (iv) facilitate a private sector

frequency coordination arrangement with federal users that is supported by the extensive

precedents of non-federal/federal spectrum use, and offers a unique opportunity to advance the

public interest on many fronts.




24
     Harbinger Transfer Order, 25 FCC Rcd at 3087-88.
25
     Id at 3088.
                                                 11

DC\2307076.3


IV.      GRANT OF THE LICENSE MODIFICATION TO USE ALTERNATE
         SPECTRUM IN THE 1675-1680 MHZ BAND IS ESSENTIAL FOR THE
         DEPLOYMENT OF LIGHTSQUARED’S TERRESTRIAL NETWORK

         A.     The 1675-1680 MHz Band Is an Ideal Band to Serve as LightSquared’s
                Alternate Downlink Spectrum and LightSquared Is Uniquely Qualified to
                Employ It.
         LightSquared’s proposal to provide GPS receivers an immediate, additional 10 MHz

guardband from terrestrial services by relinquishing permanently all terrestrial authority for the

upper 10 MHz downlink band at 1545-1555 MHz—and voluntarily not deploying terrestrially in

its lower 10 MHz downlink band at 1526-1536 MHz while the Commission is actively pursuing

a separate rulemaking proceeding—means that LightSquared’s network cannot be deployed now

without access to alternative downlink spectrum that is compatible with LightSquared’s two L-

Band uplinks bands at 1627.5-1637.5 and 1646.7-1656.7 MHz. To fill this immediate need and,

therefore, to enable the deployment of an operational terrestrial broadband network,

LightSquared proposes to use the 1675-1680 MHz band in cooperation with federal government

users in a commercially and technically viable manner. LightSquared would use this 5 MHz

along with LightSquared’s currently-leased spectrum in the 1670-1675 MHz band to create a

contiguous 10 MHz downlink channel for terrestrial wireless broadband services. 26
         Given its present use of the 1670-1675 MHz band, LightSquared has extensive

experience coordinating the adjacent 5 MHz band with the federal government. Accordingly,

LightSquared is uniquely suited to efficiently integrate this contiguous 10 MHz channel into a

4G LTE network in a manner that will protect the integrity of continuing, essential government

operations at 1675-1680 MHz and in the neighboring spectrum above 1680 MHz. LightSquared

will work closely with NTIA in establishing the operating parameters and safeguards necessary

to use this frequency band in cooperation with the existing federal user of this 5 MHz and will

commit to protecting that user’s essential government services that will remain in the band.


26
     LightSquared currently is authorized to operate at 1670-1675 MHz by virtue of a leasing
     agreement through One Dot Six Corp. to which the Commission has consented. See ULS
     Lease ID L000007295.
                                                 12

DC\2307076.3


         B.     The Commission’s and NTIA’s Rules and Precedents Permit the Commission
                to Authorize Non-Federal Use of the 1675-1680 MHz Band.
         LightSquared’s proposal to have access to spectrum currently used by federal agencies as

proposed in this Application is well supported by prior precedents. Over the years, the

Commission and NTIA have cooperated in applying their respective public interest mandates to

foster sound spectrum management and inject flexibility into the division of the radio spectrum

between federal users and non-federal users. For example, non-federal law enforcement

agencies were permitted to use a primary federal frequency for stolen vehicle recovery, 27 a
commercial satellite operator to use federal frequencies to provide satellite service to the Navy, 28

an energy exploration company to timeshare NASA satellite capacity to provide commercial

satellite service, 29 and commercial digital message providers to use federal spectrum as a

substitute for originally-licensed spectrum that could not be used because of potential

interference to government stations. 30 In each instance, the Commission and NTIA found that

such flexible and innovative spectrum management initiatives served important national goals

that could be served in no practical way other than by cooperating to give private parties access

to spectrum that either was used exclusively or primarily by federal agencies.




27
     Amendment of Parts 2 and 90 of the Commission’s Rules to Provide for Stolen Vehicle
     Recovery Systems, 3 FCC Rcd 7195 (1988) (frequency initially allocated exclusively for
     federal use re-allocated on a shared basis between federal and non-federal users for the
     purposes of stolen vehicle monitoring and recovery use).
28
     Hughes Communications Services, Inc., FCC 79-809 (rel. Dec. 10, 1979) (authorizing
     construction of LEASAT satellite system on federal frequencies).
29
     In the Matter of Application of SpaceData International LLC; For Authority to Operate on a
     Time Share Basis NASA's Tracking and Data Relay Satellite System, 16 FCC Rcd 9266 (Chief
     IB 2001) (authorizing use of federal TDRSS spectrum for searching for oil and gas deposits
     on ocean floor).
30
     See Amendment of the Commission's Rules to Relocate the Digital Electronic Message
     Service From the 18 GHz Band to the 24 GHz Band and to Allocate the 24 GHz Band For
     Fixed Service, 12 FCC Rcd 3471 (1997) (federal spectrum made available for digital
     electronic message service (“DEMS”) to substitute for originally assigned spectrum that could
     not be used because of potential interference to government stations).
                                                  13

DC\2307076.3


        The authority for 1675-1680 MHz that LightSquared seeks in this Application is

supported by these precedents and is well within the authority of the Commission and NTIA to

provide. Given concerns about GPS compatibility with use of LightSquared’s licensed L-Band

downlink, obtaining access to 1675-1680 MHz is an efficient solution that would allow

LightSquared to deploy its broadband network in a manner that already has been found to be in

the public interest. Accordingly, LightSquared’s use of 1675-1680 MHz as a key element in its

network would substantially serve the national interests in achieving efficient spectrum use,

dedicating critical spectrum to mobile broadband, and facilitating the deployment of a new,

competitive broadband network, with particular emphasis on rural and underserved communities.

V.      LIGHTSQUARED SEEKS TO MATCH ITS TWO UPLINK BANDS WITH THE
        NEW DOWNLINK BAND IN AN OPERATIONALLY-EFFICIENT AND
        COMMERCIALLY-VIABLE MANNER
        LightSquared’s proposals in this Application regarding terrestrial use of the L-Band
would leave it unable ever to use its upper 10 MHz L-Band downlink band for terrestrial

operations, and would defer terrestrial use of its lower 10 MHz L-Band downlink band while the

Commission is actively pursuing, through the proposed rulemaking, revised rules for that lower

10 MHz band. Under these circumstances, LightSquared therefore would not be able to

construct and operate its authorized 4G LTE wireless network in the near future.

        Accordingly, LightSquared seeks appropriate authorization to match its two uplink bands
at 1627.5-1637.5 MHz and 1646.7 MHz-1656.7 MHz with the 1670-1680 MHz downlink

channel proposed herein in an operationally efficient and commercially viable manner.

Moreover, LightSquared recognizes that at the time that the 1675-1680 MHz cooperative

spectrum use arrangement is finalized with the federal government, it may be necessary to

conform that arrangement and the proposed uplink/downlink spectrum matching to the

Commission’s rules. For these reasons, LightSquared respectfully requests such appropriate

adjustments and further authorizations with regard to the Commission’s rules as may be needed

to facilitate the prompt processing and grant of this Application.

                                                14

DC\2307076.3


VI.     CONCLUSION
        LightSquared’s proposed license modification and its corresponding commitment on the

lower 10 MHz offer a constructive and comprehensive approach to resolve the issues that to date

have precluded the deployment of its terrestrial network. LightSquared remains committed to

fulfilling the Commission’s vision of providing competitive wireless broadband to all

Americans. With the Commission’s granting of this Application, LightSquared could achieve

this goal in a manner that also addresses concerns raised by the GPS industry. As this

Application shows in substantial detail, LightSquared’s comprehensive solution advances the

public interest by creating a valuable guardband from terrestrial services for GPS receivers,
introduces a new nationwide mobile broadband network, and ultimately increases utility of the

nation’s scarce spectrum resources. In short, grant of this Application would enable

LightSquared to immediately expand on its existing, multi-billion dollar investment to build a

network that brings more competition, choice and access to hundreds of millions of Americans

more quickly than any other potential new wireless network operator.




                                                15

DC\2307076.3



Document Created: 2012-09-28 07:18:59
Document Modified: 2012-09-28 07:18:59

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC