Attachment SESMOD2011120601526S

SESMOD2011120601526S

SUPPLEMENT submitted by ROME RESEARCH CORPORATION

SUPP. INFO.

0000-00-00

This document pretains to SES-MOD-20111206-01526 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2011120601526_939369

Towanda Bryant
From:               David Eisenbarth [David_Eisenbarth@partech.com]
Sent:               Sunday, February 12, 2012 8:03 PM
To:                 Towanda Bryant
Cc:                 Trang Nguyen
Subject:            RE: Rome Research FCC pending mod app SES-MOD-20111206-01526 E030158


Ms. Bryant / Ms Nguyen:

These are the identified corrections (hopefully final) on our pending
Modification:

1). On FCC Form 312, Schedule B, Page 2 B4.(G). Antenna Gain Transmit and/or Receive,
E-41's should read:

TX 59.9 dBi at 14.0000 Ghz, RX 58.0 dBi at 11.0000 Ghz

2). On FCC Form 312, Schedule B, Page 3 B6. (I). Maximum EIRP Density toward the Horizon-
E60, should read:

1.61

3). On FCC Form 312, Schedule B, Page 4 B7. (F). Maximum EIRP per Carrier (dBw), (210KG1D)
E48- should read:

62.00 dBW

4). On FCC Form 312, Schedule B, Page 4 B7. (F). Maximum EIRP Density per Carrier
(dBw/4Khz), (210KG1D) E49 should read:

45.8 dBW

5). On FCC Form 312, Schedule B, Page 4 B7. (F). Maximum EIRP per Carrier (dBw), (35M5G1D)
E48- should read:

82.2 dBW

6). On FCC Form 312, Schedule B, Page 4 B7. (F). Maximum EIRP Density per Carrier
(dBw/4Khz), (35M5G1D) E49 should read:

44.5 dBW

7). On FCC Form 312, Schedule B, Page 1 B1J. Geographic Coordinates, should read:

E11 -Latitude: 35 Deg, 44 Min, 15.2 Sec, N        E12 -Longitude: 120 Deg,
45 Min, 17.2 Sec, W

Again thank you so very much for all your help and understanding.


V/r
David D. Eisenbarth
Rome Research Corporation
Site Manager - Camp Roberts
1-805-227-7790 FAX: 227-7793




                                              1



Document Created: 2012-02-14 12:32:59
Document Modified: 2012-02-14 12:32:59

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC