Attachment SESMFS2016011200011.

SESMFS2016011200011.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-MFS-20160112-00011 for Modification w/ Foreign Satellite (earth station) on a Satellite Earth Station filing.

IBFS_SESMFS2016011200011_1129250

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

 Name: Shell Communications, Inc.                                                                         Call Sign: E060226
 Authorization Type: Modification of License                                                           File Number: SES—MFS—20160112—00011
 Non Common Carrier                             Grant date:        03/03/2016      Expiration Date:     08/01/2021                mm raunes            c




Nature of Service: Domestic Fixed Satellite Service
Nature of Service: Fixed Satellite Service

Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                             Elevation                   Special Provisions
#   Site ID                             Address                             Latitude      Longitude             (Meters)    NAD (Refer to Section H)

1) Robert TC             Gulf of Mexico                                30°30‘54.4"N        90°20‘21.7"W           10 .2          83
                         LA


                         Licensee certifies antenna(s)                 comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning August 1, 2006 (3 AM Eastern Standard Time) and ending August 1,
2021 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is
March 3, 2017 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                                 Max    Max EIRP                      Special
                                                                                EIRP     Density                    Provisions
z           Freqt;lency               Polarization                  Tx/Rx    /Carrier   /Carrier   Aggociated        (Refer to        Modulation/
               (MHz)                      Code           Emission Mode        (dBW) (dBW/4kH2Z) aAntenna            Section H)          Services
1) so67.0000—6103.0000                   H,V            4M30G7TW      Tx      52.00       22.40       Andrew243                       QPSK — DATA

2) 5925.0000—6425.0000                   H, V           4M30G7TW      Tx      52.00       22.40       Andrew243                       DIGITAL

3) 3700.0000—4200.0000                   H,V            4M30G7W       Rx                              Andrew243                       DIGITAL

4) 3700.0000—4200.0000                   H, V           4M30G7W       Rx                              Andrew243                       QPSK —    DATA




                                                                      ( page 1 of 5 )                                                      FCC Form 488


                                                  UNITED STATES OF AMERICA
                                             FEDERAL COMMUNICATIONS COMMISSION

                                            RADIO STATION AUTHORIZATION

  Name: Shell Communications, Inc.                                                                       Call Sign: EO60226
  Authorization Type: Modification of License                                                       File Number: SES—MFS—20160112—00011
  Non Common Carrier                        Grant date:     03/03/2016         Expiration Date:         08/01/2021




  C) Frequency Coordination Limits

                                                     Satellite Arc            Elevation             Azimuth              Max EIRP



  #
                Frequency
                     (MHz)
                          Limits                    hese0We
                                                  Limit  Limit
                                                                         Eus=west
                                                                         Limit
                                                                                     Bas—West
                                                                              Limit Limit
                                                                                                 Haien""— Antenna(s)
                                                                                          Limit (dBW/4kHz)
                                                                                                           Assocl          orizon         ssociated


  1)          3700.0000—4200.0000                 109.0W—118.0W           49.0—43 .4              213 .6—225 .9                     Andrew243
  2)          6067.0000—6103.0000                 109. 0W—118 . OW        49.0—43.4               213.6—225.9              —25.6    Andrew243
 3)           5925.0000—6425.0000                 109.0W—118 . 0W         49.0—43 .4              213 .6—225.9             —29.6    Andrew243
 4)           5925.0000—5958.0000                  60 .0W—143 . 0W        41.5—23.5               130 .9—248.8            —21.09    Andrew243
  5)          5991.0000—6018.0000                  60 .0W—143 . 0W        41.5—23.5               130 .9—248 .8           —21.09    Andrew243
  6)          6051.0000—6051.0000                  60 .0W—143 . 0W        41.5—23 .5              130 .9—248 .8           —21.09    Andrew243
  7)          6110.0000—6136.0000                  60 .0W—143 . OW        41.5—23 .5              130 .9—248 .8           —21.09    Andrew243
  8)          6169.0000—6182.0000                  60 .0W—143 . 0W        41.5—23 .5              130 .9—248 .8           —21.09    Andrew243
  9)          6332.0000—6359.0000                  60 .0W—143 . 0W        41.5—23 .5              130 .9—248.8            —21.09    Andrew243
10)           6421.0000—6425.0000                  60 .0W—143 . 0W        41.5—23.5               130 .9—248 .8           —21.09    Andrew243
11)           3700.0000—4200.0000                  60 .0W—143 . 0W        41.5—23 .5              130.9—248 .8                  0   Andrew243



 D) Points of Communications
        The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

       1) Robert TC to SATMEX—5 @ 116.8 W.L. (Mexico—licensed)
   2) Robert TC to Eutelsat 1 13WA ($2695) @ 113 degrees W.L. (formerly SATMEX 6) (Mexico—licensed)
   3) Robert TC to Permitted Space Station List

 E) Antenna Facilities
                                                                                                                     .                                 Special
                                                                                                                 S‘te.               Max              Provisions
       Site          Antenna                 Diameter                                                         Elevation         Antenna Height         (Refer to
        ID             ID           Units    (meters)          Manufacturer                Model number       (Meters)             (Meters)           Section H)
Robert TC           Andrew243         1           2 .4               ANDREW                       243          10 .2         61.8 AGL/   61.8 AMSL

          Max Gains(s) :             42.0 dBi @            6.1700 GHz            38.5     dBi e         3.9500 CGHz
                                              I
          Maximum total input power at antenna flange (Watts) =                                   10 .00
          Maximum aggregate output EIRP for all carriers (dBW) =                                  52.00




                                                                ( page 2 of 5)                                                        FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION .

Name: Shell Communications, Inc.                                                        Call Sign: EQO60226
Authorization Type: Modification of License                                          File Number: SES—MFS—20160112—00011
Non Common Carrier                 Grant date:    03/03/2016      Expiration Date:    08/01/2021




F) Remote Control Point:
Robert TC       4400 S. SAM HOUSTON PKWY. EAST, (ROBERT TC)                                    Call Sign: E030253
                HOUSTON, HARRIS, TX 77048
                (832) 668—2300

G) Antenna Structure marking and lighting requirements:
      None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
   A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
     1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
              signal at associated station(s). Maximum EIRP and maximum EIRP density are not applicable to receive
              operations.
     1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
              the specified parameters on any discrete frequencies within associated band in accordance with the other terms
              and conditions of this authorization, subject to any additional limitations that may be required to avoid
              unacceptable levels of inter—satellite interference.
     2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
              FCC 2d 8$44) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
              16495 and is subject to the policies adopted in that proceeding.
     2300 ——— Authority is granted to operate this station by remote control provided that: (1)the parameters of the transmissions
              of this station monitored at the remote control point, and the operational functions sufficient to ensure that the
              operations of this station are in full compliance with the station authorization at all times; (2) upon detection by
              the grantee, or upon notification from the Commission, of a deviation of the operation of this station,
              transmissions shall be immediately suspended until the deviation is corrected, except that transmissions
              concerning the immediate safety of life or property may be conducted for the duration of such emergency; and (3)
              the grantee shall have available, at all times, the technical personnel necessary to perform the technical servicing
              and maintenance of this station expeditiously. See also Public Notice "The International Bureau Provides
              Guidance Concerning the Relocation of Earth Station Remote Control Points", DA 06—978 (rel. May 4, 2006).
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
              power flux density levels exceed the specified guidelines.
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.



                                                      ( page 3 of 5)                                               ‘FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION
Name: Shell Communications, Inc.                                                      Call Sign: E060226
Authorization Type: Modification of License                                         File Number: SES—MFS—20160112—00011
Non Common Carrier                 Grant date:   03/03/2016      Expiration Date:   08/01/2021




H) Special and General Provisions
   A)This RADIO STATION            AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
              occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
              sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.
     5216 ——— All operations shall be on a non—common carrier basis.




                                                    ( page 4 of 5 )                                           FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION

Name: Shell Communications, Inc.                                                        Call Sign: EO60226
Authorization Type: Modification of License                                          File Number: SES—MFS—20160112—00011
Non Common Carrier                 Grant date:    03/03/2016      Expiration Date:    08/01/2021




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
              completion of construction unless an application for modification of authorization to request additional time to
              complete construction is filed by that date, together with a showing that failure to complete construction by the
             required date was due to factors not under control of the grantee.

              Licensees are required to pay annual regulatory fees related to this authorization,. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 5 of 5)                                                 FCC Form 488



Document Created: 2016-03-03 16:42:24
Document Modified: 2016-03-03 16:42:24

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC