April 23, 2015


Re: Engineering Certification Concerning AMC—3


To Whom It May Concemn:

        This letter certifies that SES is aware that Row 44, Inc. (‘Row 44") is planning to
seek a modification (‘Modification Application") of its blanket authorization from the
Federal Communications Commission (‘FCC") to operate technically identical Ku—band            SES Americom, Inc.

transmitreceive Earth Stations Aboard Aircraft ("ESAA‘) under Call Sign E080100. SES
                                                                                              1129 20" St. NW
                                                                                              Suite 1000
understands that Row 44 will be filing the Modification Application pursuant to the current   Washington, DC 20036
ESAA Rules, including Section 25.227, and it will propose changes in order to improve         USA
system capacity on domestic and internationalflights.                                         Tel. +1 202 478 7100
                                                                                              Fax +1 202 354 4658
                                                                                              wwnw.ses.com
           SES notes that the proposed operations of the Row 44 ESAA terminals at the off—
axis EIRP density levels and other operating parameters provided to SES and reflected in
the Technical Annex (ExhibitA) to be submitted with Row 44‘s Modification Application
comply with the Section 25.227(a) off—axis EIRP density maskin the planeof the
geostationary satellite orbit (‘GSO®) and therefore no further coordination with GSO
operators is required for these operations on AMC—3 at 67° W.L.

           SES also acknowledges that the proposed operation of the Row 44 terminals has
the potential to create harmful interferenceto satelite networks adjacent to this satellite
that may be unacceptable. If the FCC authorizes the modified operation that Row 44
proposes, SES will include the power density levels specified by Row 44 in all future
satellite network coordination agreements it completes with other operators with respect to
these satellites, and Row 44 will comply with all such coordination agreements reached by
SE8.

Sincerely,
       4


Kimberly M. Baum
Vice President, Spectrum Management and Development Americas
SES Americom, Inc.



Document Created: 2015-04-23 13:28:26
Document Modified: 2015-04-23 13:28:26

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC