O3b Response to Oppo

REPLY submitted by SES Americom, Inc. and O3b Limited

O3b Response to Opposition

2019-09-17

This document pretains to SES-LIC-20190411-00503 for License on a Satellite Earth Station filing.

IBFS_SESLIC2019041100503_1910376

                                          Before the
                               Federal Communications Commission
                                     Washington, D.C. 20554


    In the Matter of                               )
                                                   )
    Viasat, Inc. Application for Authority to      )      IBFS File No. SES-LIC-20190411-00503
    Operate Ka-band Earth Station Antennas         )      Call Sign E190201
    Mounted on Aircraft                            )


                                     REPLY OF O3B LIMITED

          O3b Limited (“O3b”) submits this reply regarding the above-captioned application of

Viasat, Inc. (“Viasat”) for authority to deploy 1,000 aeronautical earth stations in motion

(“ESIMs”) in Ka-band spectrum including nonconforming use of the 28.6-29.1 GHz and 18.8-

19.3 GHz bands in which non-geostationary orbit (“NGSO”) systems such as O3b’s have sole

primary status.1 O3b’s initial filing sought deferral of the Viasat Application pending submission

of additional technical data regarding Viasat’s ability to adequately protect NGSO operations in

these frequencies.2 Because Viasat’s response3 provides the detailed supplemental information

O3b sought, O3b withdraws its request for deferral. O3b has no further objection to the Viasat

Application provided that the Commission conditions any grant to ensure full protection of

existing and future NGSO operations by requiring Viasat, pending completion of coordination, to

inhibit transmissions in the NGSO-primary spectrum during in-line events with O3b.4


1
 Viasat, Inc., Call Sign E190201, File No. SES-LIC-20190411-00503 (the “Viasat
Application”).
2
 O3b Limited Petition to Defer, Call Sign E190201, File No. SES-LIC-20190411-00503 (the
“O3b Petition”).
3
 Viasat Opposition to O3b Petition to Defer, Call Sign E190201, File No. SES-LIC-20190411-
00503 (“Viasat Opposition”).
4
 Viasat has argued that the O3b Petition should be considered as informal comments because
O3b inadvertently filed the petition under an incorrect file number. See id. at 3 n.6. Viasat


          O3b has reviewed the additional information provided by Viasat and performed its own

analysis using the data, shown in the attached Annex 1. Critically, Viasat’s calculations of the

interference-to-noise (“I/N”) threshold are premised on a criterion of 6% ΔT/T that is the trigger

for coordination between co-primary operators and cannot be validly used to assess the

acceptability of interference from a nonconforming operation into a primary operation.5 Viasat’s

use of an inappropriate interference standard undermines its repeated attempts to downplay the

risk that O3b’s primary services would be adversely affected.6

          In any event, Viasat’s showing confirms that its proposed ESIM operations would exceed

even this unjustifiably generous criterion for interference to O3b operations for short periods of

time.7 Although Viasat asserts that short-term interference is “typically acceptable,”8 O3b rather

than Viasat is the proper entity to determine the acceptability of any interference to the O3b

network. Moreover, as shown in Annex 1, O3b’s calculations suggest that interference levels

could be materially higher than Viasat predicts and highlight other flaws in the Viasat analysis.

          In short, the record demonstrates that Viasat’s proposed ESIM operations do create a risk

of interference to the O3b network. The appropriate approach to resolve these issues is through




acknowledges that it timely received the mailed service copy of the O3b Petition, however,
giving Viasat adequate notice of the O3b filing and sufficient time to prepare a response.
Moreover, on learning of the error, O3b promptly submitted its petition in the correct file. Under
these circumstances, Viasat has not been disadvantaged by the defective original filing of the
O3b Petition, and the Commission should consider the arguments raised by O3b on their merits.
5
 Id., Attachment 1 at 2 (the “threshold criteria” Viasat used in its simulations “was the 6% ΔT/T
coordination trigger which is equivalent to an I/N of -12.2 dB”).
6
  See, e.g., id. at 4 (suggesting that in-line events that would exceed an I/N of -12.2 dB toward
O3b’s system would be “extremely infrequent and fleeting”); Attachment 1 at 2 (the -12.2 dB
I/N criteria was met more than 99.999% of the time”).
7
    Id., Attachment 1 at 2.
8
    Id.

                                                  2


coordination between Viasat and O3b, and O3b believes a coordination agreement can be

achieved. Viasat indicates that its Network Management System has been designed with the

ability to calculate in-line events and inhibit emissions or change frequencies for each ESIM as

necessary.9 O3b asks that the Commission condition any grant of the Viasat Application to

require use of this capability to protect the O3b system unless and until Viasat successfully

completes coordination of its proposed operations with O3b.

                                                     Respectfully submitted,

                                                     O3b LIMITED

    Of Counsel                                       By: /s/ Will Lewis
    Karis A. Hastings                                Will Lewis
    SatCom Law LLC                                   Senior Legal Counsel
    1317 F Street, N.W., Suite 400                   O3b Limited
    Washington, D.C. 20004                           1129 20th St., NW
    karis@satcomlaw.com                              Suite 1000
                                                     Washington, DC 20006
                                                     (202) 813-4033




    September 17, 2019




9
    Id. at 4-5.

                                                 3


                                               ANNEX 1

          The graphic below depicts O3b’s calculations of I/N effects on an O3b satellite of an

ESIM transmitting from two different latitudes, 25° North and 40° North. In-line conjunction

events at these latitudes occur only with O3b satellites in inclined orbit, but the simulation

considers all O3b satellites, both inclined and equatorial. The results produced by O3b deviate

from the Viasat calculations due to the following three factors:

          1. Antenna pattern: O3b assumes a generic antenna pattern from Appendix 8 of the

             International Telecommunication Union (“ITU”) Radio Regulations, whereas Viasat

             appears to have used simulated or actual antenna pattern data from its proposed G-12

             ESIM antenna.10 O3b was unable to use the G-12 data because it was not readily

             available in an electronic format that could be interpreted by the simulation software

             O3b used.11

          2. Bandwidth advantage: Viasat assumed a bandwidth advantage of 10*log10(80/220)

             or 4.4 dB, but O3b did not use this assumption and therefore obtained a peak I/N

             value approximately 4.4 dB higher than the Viasat results. O3b excluded this factor

             because O3b transmissions are not always 220 MHz, resulting in the possibility of

             higher levels of harmful interference from the Viasat ESIM antennas.

          3. Duty cycle: Viasat states that it ran its simulation using a 100% duty cycle,12 but it

             appears that Viasat converted its results to reflect only a 1% duty cycle, which is why




10
     Viasat Opposition, Attachment 1 at 1.
11
  O3b obtained PDF versions of the G-12 antenna pattern from the Commission’s website, but
these data are not easily extracted into table form for simulation purposes.
12
     Viasat Opposition, Attachment 1 at 2.


                           the results in the Viasat graph terminate at 1%.13 Viasat’s use of a 1% duty cycle

                           ignores the possibility of aggregate interference from multiple co-frequency

                           terminals, such as could occur near an airport. O3b’s results terminate at 100%. To

                           demonstrate a lower duty cycle, the curves below would need to be shifted in time

                           (along the y-axis), but their shape would remain unchanged.
     percent time (%)




                        It is also important to correct Viasat’s claim that:

                               Above 41.5 degrees the -12.2 dB I/N criterion is never
                               exceeded during the 30-day run. Accordingly, at any
                               latitude of 41.5 degrees both the equatorial and 70-degree
                               inclined orbits of O3b will be unaffected by any ESIM
                               operating in this region.14

                        Leaving aside that Viasat is again referencing an I/N value based on an invalid

interference criterion for nonconforming operations, the Viasat statement is simply incorrect. As

a matter of orbital geometry, an inclined orbit O3b satellite can receive harmful interference


13
     Id., Attachment 1 at 3.
14
     Id., Attachment 1 at 4.

                                                                   5


from an ESIM operating at any latitude because an in-line conjunction event can occur whenever

an O3b inclined satellite passes between an ESIM station and its serving geostationary orbit

satellite. For the O3b inclined satellites, in-line event geometry is not constrained by ESIM

latitude, as suggested by the Viasat statement. Indeed, the blue line in the O3b graph above

shows the impact on an O3b satellite of an ESIM terminal operating at 42 degrees North latitude,

above the point where Viasat claims there would be no effect. If Viasat’s simulation did not

show any impact in this region, that suggests the test parameters may have been flawed.




                                                 6


                                        DECLARATION

       I, Zachary Rosenbaum, hereby certify under penalty of perjury that I am the technically

qualified person responsible for preparation of the technical information contained in the

foregoing Annex 1; that I am familiar with the technical requirements of Part 25; and that I either

prepared or reviewed the technical information contained in the annex and that it is complete and

accurate to the best of my knowledge, information and belief.



                                                              /s/
                                               Head of Spectrum Management
                                               and Development Americas and
                                               NGSO, SES

 Dated: 17 September 2019




                                                7


                                CERTIFICATE OF SERVICE

              I hereby certify that on this 17th day of September, 2019, I caused to be served a

true copy of the foregoing “Reply of O3b Limited” by first class mail, postage prepaid, upon the

following:

 Christopher Murphy                                 John P. Janka
 Associate General Counsel, Regulatory Affairs      Matthew T. Murchison
 Daryl Hunter                                       Elizabeth R. Park
 Chief Technical Officer, Regulatory Affairs        Latham & Watkins LLP
 Viasat, Inc.                                       555 Eleventh Street, NW
 6155 El Camino Real                                Suite 1000
 Carlsbad, CA 92009                                 Washington, DC 20004




                                            /s/
                                            Will Lewis



Document Created: 2019-09-17 15:59:29
Document Modified: 2019-09-17 15:59:29

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC