Attachment SESLIC2016040400306.

SESLIC2016040400306.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-LIC-20160404-00306 for License on a Satellite Earth Station filing.

IBFS_SESLIC2016040400306_1137687

                                                       UNITED STATES QOF AMERICA
                                                  FEDERAL COMMUNICATIONS COMMISSION

                                                 RADIO STATION AUTHORIZATION
    Name: TelAlaska Cellular, Inc.                                                                              Call Sign: E160018
 Authorization Type: License                                                                               File Number: SES—LIC—20160404—00306
 Non Common Carrier                              Grant date:       05/09/2016       Expiration Date:           05/09/2031           s                AR4




Nature of Service: Fixed Satellite Service

Class of Station: Fixed Earth Stations

A) Site Location(s)
                              .                                                                                     Elevation           Special Provisions
# Site ID                               Address                              Latitude       Longitude                (Meters)      NAD (Refer to Section H)

1) Teller                Lot 5, Block 5, USS 3452 A &                     65°15‘35.9"N     166°21‘30.7"W               3.66             83
                         B
                         Teller Townsite
                         Teller,     AK
                         Licensee certifies antenna(s)                    comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning May 9, 2016 (3 AM Eastern Standard Time) and ending May 9, 2031
(3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is May 9,
2017 (3 AM Eastern Standard Time) . Grantee mustfile with the Commission a certification upon completion of construction
and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, réfer to Section H.
                                                                                 Max     Max EIRP                           Special
                                                                                EIRP      Density                         Provisions
            Frequency                 Polarization                   Tx/Rx    /Carrier    /Carrier      Aasggociated        (Re.fer t         Modulation/
#              (MHZ)                       Code          Emission    Mode      (dBW)     (dBW/4kHZ)      Antenna          Section H)           Services

1) 5925.0000—6425.0000                    #,v           4M50G7TD       Tx      63.00           32.50     Teller                              8PSK, Data

2) 3700.0000—4200.0000                    H,V           4M00G7D        Rx       0 .00          0.00      Teller                              SPSK, Data

3) 3700.0000—4200.0000                    H,V           4M50G7D        Rx       0 .00          0 .00     Teller                              8PSK,   Data


4) 3700.0000—4200.0000                    H, V          29M5G7D        Rx       0 .00          0.00      Teller                              16APSK, Data


C) Frequency Coordination Limits
                                                          Satellite Arc            Elevation              Azimuth            Max EIRP
                             e                            (Deg. Long.)             (Degrees)              (Degrees)       Density toward
            Frequency Limits                             East       West        East      West         East        West       Horizon                 Associated
#                  (MHz)                                Limit       Limit      Limit      Limit        Limit      Limit (dBW/4kHz)                    Antenna(s)
1)       3700.0000—4200 .0000                           111.1W—139. 0W           05.3—13 .4             122.2—150 .3                    0       Teller


                                                                       (page 1 of 4)                                                                 FCC Form 488


                                                    UNITED STATES OF AMERICA
                                               FEDERAL COMMUNICATIONS COMMISSION

                                              RADIO STATION AUTHORIZATION

  Name: TelAlaska Cellular, Inc.                                                                          Call Sign: E160018
  Authorization Type: License                                                                         File Number: SES—LIC—20160404—00306
  Non Cqmmon Carrier                          Grant date:   05/09/2016        Expiration Date:         05/09/2031




  C) Frequency Coordination Limits
                                                     Satellite Arc           Elevation               Azimuth           Max EIRP
              —r           Limit                    (Deg. Long.)            (Degrees)                (Degrees) Density toward
                   requency Limits                  East    West          East    West             East    West   Horizon              Associated
  #                   (MHz)                        Limit     Limit       Limit      Limit      Limit         Limit (dBW/4kHz)          Antenna(s)
 2)          5925.0000—6425.0000                   111.1W—139.0W           05.3—13 .4              122.2—150 .3            —0.7    Teller


 D) Points of Communications
       The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

      1) Teller to Permitted Space Station List

 E) Antenna Facilities
                                                                                                                    .                                 Special
                                                                                                                  S‘te.            Max              Provisions
      Site             Antenna                 Diameter                                        ’               Elevation      Antenna Height        (Refer to
      ID                 ID          Units—     (meters)       Manufacturer              Model number           (Meters)          (Meters)          Section H)
Teller                  Teller         1          4.5       Superior Satellite                     8345        3 .66         5 AGL/ 8.66 AMSL
                                                              Engineers,     Inc

           Max Gains(s) :             46.7 aBi e            6.1750 GHz            43.6 aBi e              4.0000 CHz
           Maximum total input power at antenna flange (Watts) =                                    56.00
           Maximum aggregate output EIRP for all carriers (dBW) =                                   64 .20




 G) Antenna Structure marking and lighting requirements:
             None unless otherwise specified under Special and General Provisions


 H) Special and General Provisions
        A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
           conditions:
          1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
                      signal at associated station(s).      Maximum EIRP and maximum EIRP density are not applicable to receive
                      operations.
             1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
                      the specified parameters on any discrete frequencies within associated band in accordance with the other terms
                      and conditions of this authorization, subject to any additional limitations that may be required to avoid
                      unacceptable levels of inter—satellite interference.
             2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
                      FCC 2d $44) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
                       16495 and is subject to the policies adopted in that proceeding.


                                                                ( page 2 of 4 )                                                      FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: TelAlaska Cellular, Inc.                                                            Call Sign: E160018
Authorization Type: License                                                           — File Number: SES—LIC—20160404—00306
Non Common Carrier                 Grant date:    05/09/2016       Expiration Date:      05/09/2031




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
              power flux density levels exceed the specified guidelines.
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
              of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
              1.1311. See 47 CFR § 1.1307 (b) (5).
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
              occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
             sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
             Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
             measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
             on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
             signs and protective equipment for workers.
     5216 ——— All operations shall be on a non—common carrier basis.




                                                      ( page 3 of 4)          '                                     FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: TelAlaska Cellular, Inc.                                                          Call Sign: E160018
Authorization Type: License                                                          _ File Number: SES—LIC—20160404—00306
Non Common Carrier                Grant date:    05/09/2016       Expiration Date:    05/09/2031




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

             This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
             completion of construction unless an application for modification of authorization to request additional time to
             complete construction is filed by that date, together with a showing that failure to complete construction by the
             required date was due to factors not under control of the grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 4 of 4 )                                               FCC Form 488



Document Created: 2016-05-26 17:09:38
Document Modified: 2016-05-26 17:09:38

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC