Attachment 20160630131441.pdf

20160630131441.pdf

DECISION submitted by FCC-IB

Grant

2016-07-19

This document pretains to SES-LIC-20150917-00589 for License on a Satellite Earth Station filing.

IBFS_SESLIC2015091700589_1143900

                                                UNITED STATES OF AMERICA
                                           FEDERAL COMMUNICATIONS COMMISSION

                                         RADIO STATION AUTHORIZATION
Name: Pacific and Southern, LLC                                                                   Call Sign: E150117
Authorization Type: License                                                                    File Number: SES—LIC—20150917—00589
Common Carrier                           Grant date:     10/27/2015       Expiration Date:      10/27/2030




Nature of Service: Fixed Satellite Service
Class of Station: TemporaryFixed Earth Station

A) Site Location(s)
                                                                                                      Elevation
# Site ID                          Address                        Latitude       Longitude            (Meters)

111                     (WXTA—TV Atlanta     )                                                                      UHK
                       TRRNSPORTABLE



                       Licensee certifies antenna(s) comply with gain patterns specified in Section 25.209


Subject to the provisions of the Communications Act of 1934, The CommunicationsSatellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
belowfor radio communicationsfor the term beginning October 27, 2015 (3 AM EasternStandard Time) and ending October
27, 2030 (3 AM EasternStandard Time) . The required date of completion ofconstruction and commencement of operation is
October 27, 2016 (3 AMEastern Standard Time) . Grantee must file withthe Commission a certification upon completion of
construction and commencement ofoperation.


B) Particulars of Operations
                                                                       Max    Max EIRP
                                                                   EIRP        Density
             Frequency          Polarization               Tojmy ICarrier"     JCarTir       Associated   Special Provisions Mogulation/
#              (MHz)                Code         Emission Mode        —(UBW) (BWAKHZ) Angeqna             (Refer to SectionH)    Services
1) 14000.0000—14500.0000           K.V           seorn       Tx       63.10     r3.5e     1                            Compressed digital      video
                                                                                                                       and audio



C) Frequency Coordination Limits

                                                  Satellite Are          Elevation            Azimuth        Max EIRP
                           m                      (Deg, Long.)           (Degrees)            (Degrees)    Density toward
             FrequencyLimits                      East    West         East    West       East      West    Horizon              Associated
#                 (MHz)                          Limit    Limit       Limit    Limit     Limit      Limit (@BWAKHz)              Antenna(s)
11      14000 .0000—24500 . 0000                                                                                            i



D) Points of Communications

     ALSAT: An ALSAT earth station license authorizes the licensee to communicate with all U.S.—licensed satellites, and all
     non—U.S.—licensed satellites on the Permitted List, with respect to the services and frequency bands specified on the Permitted
     List for each satellite.


                                                              (page 1 of 4)                                                     FCC Form 488


                                              UNITED STATES OF AMERICA
                                         FEDERAL COMMUNICATIONS COMMISSION

                                        RADIO STATION AUTHORIZATION

Name: Pacific and Southern, LLC                                                                Call Sign: E150117
Authorization Type: License                                                                 File Number: SES—LIC—20150917—00589
Common Carrier                          Grant date:    10/27/2015      Expiration Date:      10/27/2030




E) Antenna Facilities
                                                                                                       9                               Special
   &                                                                                                    “e.              Max         Provisions
 Site            Antenna                 Diameter                                                   Elevation       Antenna Height   (Refer to
  ID                ID          Units      (meters)      Manufacturer           Model number        (Meters)           (Meters)      Section H)

                     1            1          1.2        Avl Technologies             1210K

        Max Gains(s) :           43.1 dBi @           14.2500 GHz
        Maximum total input power at antenna flange (Watts) =                             100 .00
        Maximum aggregate output EIRP for all carriers (dBW) =                             63.10




G) Antenna Structure marking and lighting requirements:
       None unless otherwise specified under Special and General Provisions




H) Special and General Provisions
       A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
         conditions:
         1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
                  signal at associated station(s). Maximum EIRP and maximum EIRP density are not applicable to receive
                  operations.
         1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
                  the specified parameters on any discrete frequencies within associated band in accordance with the other terms
                  and conditions of this authorization, subject to any additional limitations that may be required to avoid
                  unacceptable levels of inter—satellite interference.
         2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
                  FCC 2d $44) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
                  16495 and is subject to the policies adopted in that proceeding.
         2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
                  guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
                  reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
                  power flux density levels exceed the specified guidelines.




                                                           ( page 2 of 4 )                                                 FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Pacific and Southern, LLC                                                          Call Sign: E150117
Authorization Type: License                                                            File Number: SES—LIC—20150917—00589
Common Carrier                    Grant date:    10/27/2015         Expiration Date:   10/27/2030




H) Special and General Provisions
   A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
      3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
              of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
              1.1311. See 47 CFR § 1.1307 (b) (5).
      3941 ——— The antenna structure authorized herein must not pose or cause hazard(s) to Aviation Traffic. See Part 17, FCC
              Rules and Regulations.

      5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
               humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
               1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
               occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
               sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
               Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
               measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
               on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
               signs and protective equipment for workers.
      5215 ——— All operations shall be on a common carrier basis.




                                                      ( page 3 of 4 )                                              FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION

Name: Pacific and Southern, LLC                                                        Call Sign: E150117
Authorization Type: License                                                          File Number: SES—L1C—20150917—00589
Common Carrier                     Grant date:   10/27/2015      Expiration Date:     10/27/2030




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried outin goodfaith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation ofthis station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term ofthis license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the stationis in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station does not meet each required construction
              deadline by the required date of completion unless, before such date(s), a specific application is timely filed to
              request an extension of the construction deadline(s), supported with good cause why that failure to construct by
              therequired date was due to factors not under control ofthe grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatoryfees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive onlyearth stations are exempt from payment of regulatoryfees.




                                                     (page 4 of 4)                                                 FCC Form488



Document Created: 2016-06-30 13:14:57
Document Modified: 2016-06-30 13:14:57

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC