                                     Before the
                      FEDERAL COMMUNICATIONS COMMISSION
                               Washington, D.C. 20554
In the Matter of                                )
                                                )
ViaSat, Inc.                                    )
                                                )
Application for Authority to Operate Up to      )      File No. SES-LIC-20120427-00404
4,000 Transmit/Receive Earth Stations           )      Call Sign E120075
Mounted on Aircraft in the Ka band              )
                                                )
                                                )
                                RESPONSE OF VIASAT, INC.
                ViaSat, Inc. (“ViaSat”) responds to the comments of Row 44, Inc. (“Row 44”) 1

filed in in the above-captioned request of ViaSat for authority to operate Ka-band earth stations

mounted on aircraft (the “Application”).

I.       INTRODUCTION AND SUMMARY
                ViaSat seeks authority to operate 4,000 aeronautical earth stations (“AES”)

operating in the 18.3-19.3 GHz, 19.7-20.2 GHz, 28.35-29.1 GHz and 29.5-30.0 GHz portions of

the Ka-band. The AES terminals will enable in-flight broadband Internet access at speeds of up

to 12/3 Mbps to passengers and crew on aircraft of all sorts, including commercial jets. The first
planned deployments of this service will be on JetBlue and United aircraft soon, after the

Commission grants ViaSat’s Application.

                ViaSat proposes to operate these terminals largely within the operating

environment that the Commission has established for the Ka-band, and coordinated some small

deviations from that operating environment with potentially affected satellite networks. Because

no designation for aeronautical mobile use of the Ka-band currently exists in the Commission’s

rules, ViaSat has requested any waivers of Commission rules that may be needed to use these

terminals to extend broadband service to aircraft, starting early this year, and also has proposed




1
     Comments of Row 44, Inc., File No. SES-LIC-20120427-00404, Call Sign E120075 (filed
     Jan. 11, 2013) (“Row 44 Comments”).


to operate this network on a non-interference basis, consistent with longstanding Commission

practice in similar circumstances. 2

                In its Comments, Row 44 argues that ViaSat’s Application does not comply with

the Commission’s rules and that the Ka-band operating framework somehow does not apply to

ViaSat’s proposed operations. 3 Row 44 also makes a number of technical arguments about

ViaSat’s proposed operations and antenna design.

                Significantly, ViaSat has coordinated its proposed AES network with all

potentially affected satellite networks – including those GSO systems located across the entire

range of the orbital arc that could potentially be affected. As the Commission found in granting

Row 44 AES authority in a similar context, the consent of potentially affected satellite networks

“resolves concerns regarding interference to existing satellite operators.” 4 Moreover, ViaSat’s
proposed operations are consistent with the longstanding Ka-band operating environment that

has served as the basis for the billions of dollars that Ka-band satellite operators have invested in

dozens of satellite networks in operation in reliance on the interference environment established

by Section 25.138 of the Commission’s rules and by inter-system coordination.




2
    See ViaSat, Inc. Application, File No. SES-LIC-20120427-00404, Exhibit A at 4 (“ViaSat
    Application”); ViaSat, Inc., Submission of Ex Parte Presentation; IBFS File Nos. SES-LIC-
    20120427-00404; SES-STA-20120815-00751, Call Sign E120075 (filed Dec. 10, 2012).
3
    Row 44’s Comments repeat the same arguments that it has already made in the context of
    ViaSat’s request for special temporary authority (“STA”) to operate a small number of the
    proposed terminals in preliminary market trials—arguments that ViaSat firmly rebutted in that
    context. See Row 44 Petition to Deny, ViaSat, Inc., File No. SES-STA-20120815-00751, Call
    Sign E120075 (filed Sept. 5, 2012). Row 44 has also made (and ViaSat has firmly rebutted)
    these same arguments in an entirely unrelated proceeding involving an experimental license
    modification application filed by ViaSat. See Row 44 Petition to Deny or Dismiss, ViaSat,
    Inc. Application for Modification of Experimental License, Call Sign WF2XOQ, File No.
    0197-EX-ML-2012 (filed Nov. 27, 2012).
    ViaSat incorporates by reference its prior rebuttals to these arguments. See ViaSat, Inc., File
    No. SES-STA-20120815-00751; ViaSat Opposition to Row 44 Petition to Deny, File No.
    SES-STA-20120815-00751 (filed Sept. 14, 2012); ViaSat Response to Row 44 November 9,
    2012 Submission, File No. SES-STA-20120815-00751 (filed Nov. 30, 2012).
4
    Row 44, Inc., 24 FCC Rcd 10223 ¶ 25 (2009) (“Row 44 AMSS Order”).
                                              2


                 For these reasons, the coordination that ViaSat has effectuated will adequately

protect all reasonable expectations regarding use of the Ka-band. ViaSat’s state-of-the-art

antenna design embodies the Commission’s Ka-band policy of allowing tradeoffs in antenna

performance to enable the deployment of new technologies while maintaining the interference

environment on which all Ka-band networks rely. Moreover, that antenna design enables the

deployment of broadband service to commercial aircraft at speeds of up to 12/3 Mbps, using a

compact, low-profile device that reduces drag and thus reduces aircraft fuel usage. For these

reasons, ViaSat urges the Commission to grant ViaSat’s Application in an expeditious manner.

II.       COORDINATION RESOLVES ANY INTERFERENCE CONCERNS
                 ViaSat successfully has coordinated the operation of its proposed AES network

with all potentially affected satellite networks: O3b’s NGSO Ka-band network, and the Ka-band

GSO networks of Hughes Network Systems, SES, DIRECTV, Intelsat, EchoStar, Dish, Telesat,

and Bell Canada. More specifically, ViaSat has coordinated its proposed operations with all Ka-

band satellite networks that operate (or are expected within the next few years to operate) on a

co-frequency and co-coverage basis with ViaSat’s satellite points of communication (i.e.,

ViaSat-1 at 115.1º W.L.; WildBlue-1 and Anik-F2 at 111.1º W.L.), and are located within +/-30º

of those points of communication. The fact of successful coordination is evidenced by the letters

that ViaSat has just placed into the record. 5

                 Commission policy in this respect is crystal clear: coordination with potentially

affected satellite networks obviates the need for the Commission to independently assess the risk

of interference into those systems. 6 Indeed, the Commission’s longstanding policy is to rely on

the satellite network coordination process to facilitate efficient use of the limited spectrum

resource, recognizing that satellite operators are sophisticated, understand the relevant




5
      ViaSat, Inc., Ex Parte Submission of Supplemental Information, File No. SES-LIC-
      20120427-00404; SES-STA-20120815-00751, Call Sign E120075 (filed Jan. 24, 2013).
6
      Row 44 AMSS Order at ¶ 25 (Consent of potentially affected satellite networks “resolves
      concerns regarding interference to existing satellite operators.”).
                                                    3


technology, 7 and understand any tradeoffs made in the course of coordination. 8 In fact, the

satellite operators with which ViaSat has coordinated are the largest operators in the industry,

and, in the aggregate, have invested many billions of dollars into hundreds of commercial

satellites. Moreover, and as contemplated by Section 25.138, ViaSat will coordinate with any

future satellite networks that could be affected by its AES network. 9

                  Against this background, Row 44’s arguments about theoretical interference

concerns ring particularly hollow. First, Row 44 does not operate a Ka-band satellite network,

does not operate a Ka-band earth station network, and has no clear plans to do either. And even

if Row 44 were to operate a Ka-band earth station network, 10 Row 44 would be bound by the

terms of the coordination agreement to which its satellite capacity provider had agreed. 11 In
sum, particularly because all affected satellite networks have consented to the proposed AES

operations, ViaSat has no legal obligation, as Row 44 mistakenly suggests, to prove a negative:

that ViaSat “will not cause harmful interference to other spectrum users.” 12

III.      THE INTERFERENCE ENVIRONMENT DEFINED BY THE KA-BAND RULES
          PROTECTS ALL USERS OF THE BAND
                  Section 25.138 of the Commission’s rules defines the “default” operating

parameters under which GSO FSS Ka-band satellite networks are deemed to be

7
     Id. at ¶ 24 (finding that “potentially affected satellite operators are . . . capable of assessing the
     potential interference impact of proposed Ku-band AES operations” despite arguments that
     those operators “do not have sufficient knowledge and expertise to assess the technical issues
     involving new AES equipment”).
8
     See, e.g., Satellite Network Earth Stations, 20 FCC Rcd 5666 ¶ 51 (2005); Fixed-Satellite
     Service (Recon. of 1988 Orbital Assignment Plan), 5 FCC Rcd 179 ¶ 32 (1990); Orion
     Satellite, 5 FCC Rcd 4937 ¶ 14 (1990); GE American Communications, 3 FCC Rcd 6871 ¶ 2
     (1988); see also SkyTerra Subsidiary, 25 FCC Rcd 3043 ¶ 29-30 (2010) (“Reliance on
     satellite-operator coordination agreements is an important aspect of a longstanding
     Commission policy of reliance on marketplace mechanisms to develop solutions to
     interference concerns. . .”).
9
     See 47 C.F.R. § 25.138(c).
10
     See Row 44 Comments at 2.
11
     See, e.g., Comsat Mobile Communications, 16 FCC Rcd 21661 ¶ 115 (2001) (requiring earth
     station licensees to operate subject to the constraints of satellite network coordination).
12
     See Row 44 Comments at 4.
                                                     4


“precoordinated,” and provides a coordination procedure for operations at levels that could

exceed these default parameters. 13 Ka-band licensees operating at levels exceeding the default

parameters bear the burden of coordinating with other affected Ka-band satellite networks—

those in existence, and those that may be deployed in the future. 14 As detailed above, ViaSat has

coordinated its proposed AES operations with all potentially affected Ka-band satellite networks,

and has confirmed its willingness to coordinate with future satellite networks. The interference

environment established by this legal framework has guided the development of the Ka-band in

the United States for nearly 15 years, 15 including the launch of about 18 Ka-band satellites to

serve the United States. Moreover, this legal framework is the basis on which each of the FSS

satellite networks with which ViaSat has coordinated, and that is authorized to serve the United

States, has been authorized by the Commission.


13
     47 C.F.R. § 25.138; see also Redesignation of the 17.7-19.7 GHz Frequency Band, First
     Report and Order, 15 FCC Rcd 13430 (2000) (“18 GHz First Report and Order”).
     In fact, the power-pattern tradeoff reflected in Section 25.138 provided the framework for a
     similar licensing approach that the Commission adopted for the Ku-band over a decade after
     the Ka-band framework was first conceived. 2000 Biennial Regulatory Review –
     Streamlining and Other Revisions of Part 25 of the Commission’s Rules, Eighth Report and
     Order, 23 FCC Rcd 15099, 15108 (2008) (“[A]n off-axis EIRP approach for conventional C-
     band and Ku-band FSS earth stations would be consistent with our treatment of Ka-band FSS
     earth stations.”) (“Licensing Reform Eighth Report and Order”).
14
     47 C.F.R. 25.138(c).
15
     See, e.g., Redesignation of the 17.7-19.7 GHz Frequency Band, Second Order on
     Reconsideration, 17 FCC Rcd 24248 ¶ 24 (2002) (Section 25.138 “will permit nearly
     ubiquitous deployment of services [in the Ka-band] without compromising the interference
     protection that other users in the band are entitled to receive.”); Redesignation of the 17.7-19.7
     GHz Frequency Band, NPRM, 13 FCC Rcd 19923, 19945-6 (1998) (Off-axis EIRP density
     threshold “ensure[s] that conforming satellite systems will not emit power at off-axis angles at
     levels high enough to cause unacceptable interference to adjacent satellites spaced at 2-degree
     intervals.”) (“18 GHz NPRM”); see also 18 GHz First Report and Order at 13471 (adopting
     the recommendations of the Ka-band industry group, which included coordination procedures
     for operations exceeding the off-axis EIRP density thresholds); Second Report of the GSO
     FSS Ka-band Blanket Licensing Industry Working Group, IB Docket No. 98-172 (filed Sept.
     27, 1999); Report of the GSO Ka-Band Blanket Licensing Industry Working Group, IB Docket
     No. 98-172, at 9 (filed Nov. 19, 1998) (noting the group’s goal was to identify uplink off-axis
     EIRP spectral density limits that ensure “maximum design flexibility in areas that [would] not
     affect adjacent GSO satellite interference,” thereby “accommodat[ing] various Ka-band
     system designs”).
                                                    5


                 Despite the long history and established precedent, Row 44 argues that Section

25.138 and the coordination agreements ViaSat has reached are not relevant because the Ka-band

is “at a relatively early stage of development,” 16 and because Section 25.138 applies only to the

FSS, and not the MSS. 17 Row 44’s claim about the technological stage of development of the

Ka-band does not pass the “red face” test. With respect to the definition of “FSS” versus

“MSS,” it bears emphasis that each of the satellite networks at issue in this case, the networks

that would provide capacity for ViaSat’s AES network, as well as each of the satellites with

which ViaSat has effectuated coordination, is authorized by the Commission to provide FSS.

Moreover, for purposes of assessing the expected effect of ViaSat’s AES network on other FSS

networks, the only relevant factor is the level of energy generated in the direction of those

networks—not whether it is generated by a fixed, transportable, or mobile terminal. And, again,

the level of that energy is understood and accepted by all relevant Ka-band FSS satellite

networks through coordination agreements. 18 Finally, in granting Row 44’s AES authority, the
Commission determined that no less weight should be placed on coordination when dealing with

an “emerging” technology in the Ku-band. 19

                 Moreover, the absence of a regulatory framework at the ITU for Ka-band AES

systems has no bearing on this Application. 20 When the Commission began authorizing Ku-band




16
     Row 44 Comments at 8 (arguing that coordination is insufficient to protect future satellite
     networks that may be launched into the “many potentially usable orbital locations” in the Ka-
     band).
17
     Id. at 4.
18
     ViaSat Application, Exhibit A at 6 (“While there are no rules for mobile operations in the Ka
     band, operating the proposed terminals consistent with the technical parameters of Section
     25.138 would ensure compatibility with satellite systems operating in the Ka band.”).
19
     Row 44 AMSS Order at ¶ 24.
20
     See Row 44 Comments at 4, 8. The CEPT has finalized its work to develop a licensing
     framework for earth stations on mobile platforms, including AES terminals, to operate on Ka-
     band FSS networks as an application of the FSS. ECC Decision (13)01 is expected to be
     formally approved in March 2013.
                                                  6


AES terminals, no relevant ITU framework existed. 21 Likewise, no Commission service rules

for Ku-band AES terminals existed when the Commission authorized thousands of Ku-band AES

terminals to at least five licensees, including Row 44 itself. 22

IV.      VIASAT’S ANTENNA DESIGN AND PROPOSED OPERATIONS ARE
         CONSISTENT WITH THE COMMISSION’S RULES AND POLICIES
                 As detailed above, because ViaSat has coordinated with all potentially affected

satellite networks, Commission precedent is clear that “[t]his resolves concerns regarding

interference to existing satellite operators.” 23 That coordination obviates the need to address
Row 44’s technical arguments about the potential off-axis EIRP density levels from, and the

potential for mispointing of, ViaSat’s AES terminals. 24 Nevertheless, ViaSat provides the

technical response included as Attachment 1 (“ViaSat Technical Response”), to correct the

record with respect to certain inaccurate technical statements in Row 44’s Comments.

                 In discussing the extent to which the AES operations could (in certain cases)

exceed the default Section 25.138 off-axis EIRP density levels, Row 44 conflates the instances in

which an AES antenna would appear skewed in relation to the GSO arc, with the geographic

areas in which the operations of an AES theoretically could affect a particular GSO satellite. 25

In doing so, Row 44 grossly overstates the geographic area where AES operations are even

theoretically relevant to any GSO satellite. Notably, a GSO spacecraft will only be impacted if a

“grating lobe” from an individual AES “lands” on the spacecraft because of a specific amount of

21
     See The Boeing Company, 16 FCC Rcd 22645 ¶ 10 (2001) (granting authority to operate
     aeronautical earth stations in the FSS Ku-band before the secondary AMSS allocation in that
     band ultimately was added in the ITU 2003 World Radiocommunication Conference (“WRC-
     03”)) (“Boeing AMSS Order”); see also Service Rules and Procedures to Govern the Use of
     Aeronautical Mobile Satellite Service Earth Stations, 20 FCC Rcd 2906 ¶ 2 (2005).
22
     See Panasonic Avionics, 26 FCC Rcd 12557 (2011); Row 44 AMSS Order; ViaSat, 22 FCC
     Rcd 19964 (2007); ARINC, 20 FCC Rcd 7553 (2005); Boeing AMSS Order.
23
     Row 44 AMSS Order at ¶ 25.
24
     Id. at ¶¶ 19, 22 (declining to address arguments concerning antenna mispointing, because
     coordination was achieved with operators); see also id. at ¶¶ 24, 25 (declining to address
     arguments concerning the level of off-axis EIRP into adjacent spacecraft because potentially
     affected satellite operators had consented). Cf. Row 44 Comments at 9.
25
     Row 44 Comments at 9, Technical Appendix at 4.
                                              7


skew (caused by the geographic location of the AES and/or aircraft banking). Because the

locations of these grating lobes are known with certainty, only a finite and limited number of

orbital locations exist at which the grating lobes could fall. Moreover, for any such orbital

location, the AES must be located within very limited geographic areas where that “intersection”

with that particular GSO satellite can occur. In any event, ViaSat’s quantitative analysis of the

thermal noise impact, even under the worst-case conditions, for any such satellites showed that

the impact would be negligible and served as the basis for successful coordination.

                 Row 44’s claim that ViaSat’s AES design is “fundamentally inconsistent with

typical engineering practice” 26 is factually baseless. 27 ViaSat has a long history and extensive

experience developing reliable antenna technology for mobile applications, including

aeronautical applications. Row 44’s argument also ignores longstanding Commission policy to

allow earth station licensees the flexibility to make tradeoffs in antenna performance necessary

to enable the deployment of new technologies. 28 The highly innovative design of the ViaSat
AES antenna reflects these very tradeoffs, and the antenna control unit in fact is based on the

same proven technology used in ViaSat’s Ku-band mobile systems. The arrangement of the feed

horns in the antenna array incorporates state-of-the-art antenna engineering and allows efficient

spectrum use in a compact, low-profile antenna construction, which reduces drag, thereby

reducing aircraft fuel costs.

                 Moreover, Row 44 speculates that ViaSat will be unable to replicate a mass-

produced antenna that complies with the terms of ViaSat’s Commission authorization for this

AES network. As an initial matter, as a longstanding Commission licensee, ViaSat takes its

licensing obligations seriously and will ensure that its operation of AES antennas will comply

with the relevant terms of its license. In addition, as a well-regarded manufacturer and operator



26
     Row 44 Comments at 8, Technical Appendix at 8, 11.
27
     As detailed in the attached ViaSat Technical Response, at 2-3, Row 44’s pointing error
     “projections” are based on faulty statistical analyses.
28
     See, e.g., 18 GHz NPRM at 19946 (off-axis EIRP envelope affords earth station operators
     system design flexibility).
                                                8


of blanket licensed earth stations, ViaSat has demonstrated its ability to control the quality and

uniformity of such mass-produced terminals.

                 In any event, the performance of the radiating aperture of ViaSat’s proposed

antenna (including the grating lobes) is dictated by a single grid plate containing each of the

individual waveguide openings and a single horn plate, each of which are precision machined.

The simplicity of this two-piece construction ensures the uniform placement of the horns on each

antenna and ensures that neither vibrations in flight nor aging of the antenna will change the

location and arrangement of the horns. Further, ViaSat conducts RF testing of all completed

antenna assemblies. 29 The manufacturing process for the proposed aeronautical antenna will be

as rigorous as it has been for the other mass-produced Ka-band terminals that ViaSat has

produced. In short, ViaSat’s stringent quality control mechanisms have ensured, and will

continue to ensure, the consistency of the proposed antennas.

                 Finally, ViaSat has certified in its Application that it will comply with the -118

dBW/m2/MHz downlink power flux density (“pfd”) levels specified in the authorizations of the

satellite points of communication, 30 and ViaSat is not aware of any proposal before the
Commission to modify the authorizations for those satellite points of communication to increase

the permissible level of downlink pfd. Still, Row 44 suggests that ViaSat’s downlink operations

will not comply with the -118 dBW/m2/MHz pfd level. 31 Again, ViaSat has no obligation to

prove a negative—that it will not exceed the maximum downlink pfd level authorized to be

emitted by the satellites whose capacity it would utilize. In any event, Row 44’s arguments do

not bear scrutiny: the attenuation of the satellite downlink signal from the aircraft fuselage could




29
     Additional details regarding the design and construction of ViaSat’s AES antenna are
     provided in the ViaSat Technical Response at 3.
30
     ViaSat Application, Exhibit A at 4. The FCC Form 312 includes a certification that all
     statements made in the application, including in attached exhibits are “true, complete and
     correct to the best of [the signatory’s] knowledge and belief, and are made in good faith.” See
     ViaSat Application, FCC Form 312 at 10.
31
     Row 44 Comments at 11.
                                                   9


not possibly magnify or increase the level of the satellite downlink in any way. 32 Moreover, the

satellite downlinks will operate in the same manner regardless of whether the receiving terminals

are fixed or mobile.

V.       CONCLUSION

                ViaSat has coordinated its proposed AES operations with all potentially affected

satellite systems, which resolves all interference concerns raised by Row 44. Furthermore,

ViaSat’s proposed operations are consistent with the interference environment established by the

Ka-band framework established in the Commission’s rules, ensuring that other satellite

operations will be adequately protected. Row 44’s technical arguments, which in any event are

obviated by coordination, are based on inaccurate assumptions about the construction of ViaSat’s

antennas and erroneous statistical claims. ViaSat’s antenna design entirely is consistent with the

Commission’s rules and policies, and ViaSat’s proposed AES operations will fully comply with

the terms of its AES license. For the foregoing reasons, ViaSat respectfully requests that the

Commission expeditiously grant ViaSat’s Application in order to facilitate the deployment of

high-speed mobile broadband services on aircraft to meet growing consumer demand for

ubiquitous connectivity.
                                                 Respectfully submitted,



                                                            /s/
                                                 John P. Janka
                                                 Elizabeth R. Park
                                                 LATHAM & WATKINS LLP
                                                 555 Eleventh Street, NW
                                                 Suite 1000
                                                 Washington, DC 20004
                                                 Tel: (202) 637-2200

                                                 Counsel for ViaSat, Inc.


January 24, 2013



32
     Cf. Row 44 Comments, Technical Appendix at 11.
                                            10


                                     ATTACHMENT 1
               ViaSat, Inc. Technical Response to Row 44 Technical Appendix

The range over which grating lobes could potentially impact a satellite network is limited.

The grating lobes of ViaSat’s Mantarray aeronautical earth station (“AES”) antenna and their
potential impact on other satellite networks are much more limited than Row 44 describes, and in
any event, have been fully coordinated with all potentially impacted satellite operators.

Row 44 in Figure 3 of its Technical Appendix depicts the geographic areas in which it believes
the operation of aircraft with ViaSat AESs can generate interference into other Ka band GSO
satellite networks. Row 44’s assumption that any exceedance of the 25.138 mask at any off-axis
angle will result in interference is not correct.

The lobes exceeding the Section 25.138 off-axis EIRP spectral density limits are discrete and
would intersect the GSO arc only when the aircraft is skewed with respect to the GSO at specific
angles as a result of geographic location or aircraft attitude, or a combination of the two. In the
vast majority of the orbital locations along the GSO arc, the grating lobes would never intersect
with that location under any conditions. For the few locations at which a grating lobe under
certain conditions could radiate toward another satellite, ViaSat calculated the ΔT/T assuming
the worst-case power density levels of the grating lobes and the worst-case antenna pointing and
geographic skew conditions.

The plot shown in Figure 1 of Row 44’s Technical Appendix represents the highest on-axis EIRP
density level (i.e., highest power, lowest symbol rate operations) at which the Mantarray antenna
will operate. As seen from this plot (generated using measured antenna pattern cuts), the EIRP
density of the grating lobes is 30 dB lower than the main lobe. While the magnitude and position
of the grating lobes do vary with frequency, across the entire 28.35 – 30 GHz frequency range
the worst case grating lobe is 26 dB down from the main lobe. Therefore, Row 44’s assertion
that the grating lobes “. . . may even rival the level of the antenna’s main lobe itself” is incorrect.
See Row 44 Technical Appendix at 8.

Despite ViaSat’s having provided this information about the nominal level of the grating lobes,
Row 44 provides no quantitative analysis to back up its claim that the EIRP density of the
grating lobes could rival the antenna’s main lobe.

Moreover, Row 44 provides no quantitative analysis of what it believes to be the ΔT/T impact to
the various satellites located over the range depicted in Figure 3 of Row 44’s Technical
Appendix for the given AES locations. In fact, Row 44 vastly overstates the potential impact.

ViaSat has had direct discussions with the satellite operators and provided each with a detailed
interference analysis based on actual satellite receiver performance. This ΔT/T analysis assumed
the maximum possible operational EIRP density of the worst-case grating lobe that potentially
could land directly on the satellite in question. In all cases, the resulting ΔT/T impact was
negligible.


In addition, as the AES must be operating at specific locations in order for energy from the
sidelobes and grating lobes to fall in the vicinity of a victim satellite, ViaSat developed a detailed
geospatial model that considers among other things, the actual antenna pattern, the AES location,
the target satellite, and the victim satellite. The output of this model was shared with satellite
operators during discussions and depicts the areas in which an AES must operate to cause a
given rise over thermal noise (ΔT/T) level. In many cases the aircraft must be operating outside
the service coverage area in order to produce a meaningful increase in noise. However, as that
theoretically could occur only outside the coverage area of the service satellite, no potential for
interference actually exists because the transmitter would be disabled in those instances.

Row 44’s pointing error projections rely on incorrect statistical analyses.

ViaSat actively monitors both azimuth and elevation pointing errors and will inhibit
transmissions when the declared pointing error limit is exceeded on either axis independently of
the other. ViaSat has a long history of making antennas for dynamic antenna pointing
applications, including mobile platforms. The antenna control unit (“ACU”) that ViaSat will use
in this case is based on the same technology used in ViaSat’s existing Ku band mobile systems
and will ensure compliance with the antenna pointing accuracy limits stated in ViaSat’s
application.

Row 44 presents what purports to be a formula to project the pointing error along the GSO. Row
44 uses this formula to produce the table on page 6 of its Technical Appendix and claims that the
results in the table represent the 1-sigma or 3-sigma likelihood of the maximum pointing angle
for the indicated skew angle. Row 44’s application of the formula and presentation of the data in
the table are wrong in two ways.

First, the joint probability of two 1-sigma or two 3-sigma events is not itself a 1-sigma or 3-
sigma event.

The joint probability of two independent 3-sigma events is given as follows:

       P(az = 3-sigma ∩ el = 3-sigma) = (1 – 99.73) x (1 – 99.73)

       0.0027 x 0.0027 = 7.29 x 10-6 ≈ 4.5 sigma, or 7.3 x 10-8%

Thus the azimuth error and the elevation error both reach a 3-sigma value simultaneously only
0.000000073% of the time – if they are independent events. However, they are not completely
independent.

In the case of the Mantarray antenna, the azimuth and elevation errors are actually inversely
correlated to a degree in that the worst case azimuth and elevation error each actually occur when
the other axis is least likely to experience significant error. This inverse correlation is a function
of the elevation angles at which the peak velocities for azimuth and elevation occur.
Specifically, azimuth pointing errors have the greatest chance of occurring when the AES is
pointing at high elevation angles (e.g., near the equator), and elevation pointing errors have the
greatest chance of occurring when the AES is pointing at low elevation angles (e.g., operating at



                                                  2


higher latitudes). This reduces the actual likelihood of a simultaneous dual axis 3-sigma event
even more.

Second, while Row 44 includes the ± sign for the azimuth and elevation error in its table, Row
44 only includes the results for cases where both axes have the same error sign, i.e. both positive,
or, both negative values. This characterization of the error scenario for the maximum pointing
error across GSO as a 1 or 3-sigma event is wrong. In fact, because half of the time the azimuth
or elevation error will have a negative sign, the probability of dual axis 3-sigma events along the
GSO would more correctly be:

       (0.5 x 0.0027) x (0.5 x 0.0027) = 1.28 x 10-6 ≈ 4.9 sigma or 1.28 x 10-8%

That is, only 0.0000000128% of the time would both antenna axis experience simultaneous 3-
sigma error events where the error direction is additive.

In any case, the pointing error performance of the Mantarray has been disclosed and coordinated
with other potentially affected satellite networks.

Row 44 mischaracterizes ViaSat’s antenna design and manufacturing process.

In describing alleged deficiencies in ViaSat’s antenna construction, Row 44 makes incorrect
assumptions about the Mantarray antenna’s design and assembly. Row 44 claims that
manufacturing tolerances will not be precise enough to produce horn spacings that are uniform or
repeatable, and thus, the grating lobe pattern will vary among units. Row 44 also claims that the
effects of aging and varying environmental conditions could change the antenna performance.

The Mantarray antenna design is composed of three parts: 1) a thin uniform fiber reinforced
dielectric window or aperture closeout for environmental protection, 2) a single grid plate with a
number of waveguide openings or apertures that is a multiple of the number of horns, and 3) a
single horn plate with a number of individual waveguide openings or apertures. Items 2 and 3
control the grating lobe characteristics by careful layout and choice of the interleaving of horn
and grid openings.

The grid plate and horn plate are precision milled from single pieces of aircraft grade (6061-T6)
aluminum stock to very high tolerances in a temperature controlled environment. Finished parts
are 100% dimensionally inspected using a state-of-the-art computer controlled coordinate
measuring machine. Locating pin features are used to insure proper mating between the grid and
horn plates and the two components are bonded into a single assembly in a temperature
controlled environment using the precise machine locating features. Finally, each unit is 100%
RF tested in a state-of-the-art antenna measurement facility during production prior to integration
with the positioner, and no antenna will be deployed that does not meet its performance
requirements regarding grating lobes.

These manufacturing and testing processes ensure the uniformity and repeatability of antenna
construction. In addition, the performance of the Mantarray antenna is not expected to change



                                                 3


over time or due to environmental effects, because of the precision openings in a single element
that form the antenna horns and because of the simplicity of the assembly.




                                                4


                                       DECLARATION


       I, Daryl T. Hunter, hereby make the following declarations under penalty of perjury. I
understand that this Declaration will be submitted to the Federal Communications Commission.

       1.     I am Director, Regulatory Affairs of ViaSat, Inc.

       #2     I have reviewed the forgoing Response of ViaSat, Inc.

       3.     I certify that the facts set forth in the foregoing Response of ViaSat, Inc. are true
              and correct to the best of my knowledge.




                                                     Daryl T.      ter


Executed January 24, 2013


                                CERTIFICATE OF SERVICE



       I, Amanda E. Potter, hereby certify that on this 24th day of January, 2013, I served a true
copy of the foregoing Response of ViaSat, Inc. via first-class mail upon the following:

       David S. Keir
       Lerman Senter PLLC
       2000 K Street, NW, Suite 600
       Washington, DC 20006




                                                                  /s/
                                                     Amanda E. Potter



Document Created: 2013-01-24 18:57:15
Document Modified: 2013-01-24 18:57:15

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC