                                              WAIVER REQUESTS

1.   Petition For Partial Waiver Of Data Submission Requirement Of Section 25.115(E)

        Pursuant to Sections 1.3 of the Commission’s rules, 47 C.F.R. § 1.3, HNS License Sub, LLC

(“Hughes”) respectfully requests a partial waiver of Section 25.115(e) of the Commission’s Rules, 47

C.F.R. § 25.115(e), with respect to some of the information that is required to be submitted with all

applications for 20/30 GHz band fixed-satellite service (“FSS”) earth station applications. This waiver

is requested for the new 6.3m and 8.1m earth station antennas that will are proposed in the instant

license application.

        Hughes’ proposed 6.3m and 8.1m earth station antennas will be used to provide gateway

services for Hughes’ Jupiter 107W satellite that is scheduled to be launched in 2012 to the 107.1°

W.L. orbital location. Hughes seeks this limited waiver in order to allow the processing and grant of

authority for its new antennas prior to the submission of certain data elements from Section 25.138

that are called for in Section 25.115(e) of the rules. The required data will not be available to Hughes

until after the first of each type of earth station antenna is constructed and readied for operation. As

explained more fully below, there is good cause to waive this rule and doing so would not be

inconsistent with Commission precedent – in particular, because Hughes will supply the information

required as soon as it is able to generate the data.1 Grant of this request will serve the public interest


1
 The Commission previously granted a similar waiver request. See Satellite Communications Services Information
Re: Actions Taken, Report No. SES-00748, File No. SES-AMD-20050901-01203 (Sept. 14, 2005) (Public Notice)
(granting DirecTV a waiver of Section 25.138 information requirements). Moreover, when it granted the initial
applications under Call Signs E060382 and E060383 for the TT&C earth station antennas for operation with Hughes’s
SPACEWAY 3 satellite, it granted waivers identical to those requested here. See, e.g., License for Call Sign E060382
at Condition 253.


by allowing the provision of additional satellite broadband communication services in the United

States without undermining the purpose of the Commission’s rules.

       Under Section 25.115(e) of the Commission’s rules, applications for earth station licenses in

the in the FSS in the 20/30 GHz bands are required to include the information described in Section

25.138. Section 25.138(a) specifies GSO FSS earth station antenna off-axis EIRP spectral density

requirements for transmissions in the 28.35-28.6 GHz and 29.25-30 GHz bands, while Section

25.138(d) specifies that a series of measured antenna radiation patterns are to be provided for the

purpose of determining compliance with the off-axis EIRP density levels in Section 25.138(a).

Similar data for the receive band is called for in Section 25.138(e). The requirements of Sections

25.138(a), (d), and (e) are aimed at ensuring that an earth station transmitting to a satellite in the

geostationary arc does not cause excessive interference to neighboring satellites.2

       As discussed in more detail below, Hughes is seeking a partial and limited waiver of the

obligation to provide with the instant blanket license earth station applications the information called

for in Sections 25.138(d) and (e) of the Commission’s rules, and instead to allow Hughes to provide

the required data in connection with its post-grant certification of earth station construction pursuant to

Section 25.133(b) of the Commission’s rules, 47 C.F.R. § 25.133(b), on the basis that:

       •        the specific new model of antenna specified for the two locations has not previously
       been field deployed (meaning that the measured data required by Section 25.138(d) of the FCC
       rules is not available);

       • the proposed antennas are not “production” antennas in the mass-production,
       ubiquitous deployment of small terminal sense of the word. Instead, the two antenna types for
       which waivers are sought are non-consumer gateway antennas that should be subjected to a

   2
      As explained below, Hughes proposes to operate in the 28.6-29.1 GHz band. While this band is allocated
   primarily for non-geostationary fixed-satellite service transmissions in the Earth-to-space direction, Hughes seeks
   a waiver of Section 25.138 to include the 28.6-29.1 GHz band in its blanket authorization. The showings made
   under this rule with respect to off-axis EIRP limits and Section 25.209 relate to the ability of an earth station to
   operate successfully in a two-degree spacing environment. To the extent that Hughes can do this in the 28.6-29.1
   GHz band, it should be able to be blanket licensed with respect to any other geostationary networks that are
   operating in the fixed-satellite service on a secondary basis to non-geostationary systems in the band.


                                                            2


           different level of scrutiny than potentially problematic small antennas targeted for ubiquitous
           deployment to commercial and consumer users;

           • Hughes will provide currently-unavailable data per the specifications in Sections
            25.138(d) and (e) of the FCC’s rules for each type of antenna after the first of each type of
           antenna is built in connection with its required certification under Section 25.133(b) of the
           Commission’s rules.

           Section 25.138(d) specifies that an applicant shall provide, for each earth station antenna type,

a series of radiation patterns measured on a production antenna performed on a calibrated antenna

range and, as a minimum, shall be made at the bottom, middle, and top frequencies of the 30 GHz

band. The radiation patterns are:

                (1) Co-polarized patterns for each of two orthogonal senses of polarizations in two
                orthogonal planes of the antenna.

                          (i) In the azimuth plane, plus and minus 10 degrees and plus and minus 180
                          degrees.
                          (ii) In the elevation plane, zero to 30 degrees.

                (2) Cross-polarization patterns in the E- and H-planes, plus and minus 10 degrees.

                (3) Main beam gain.3

Section 25.138(e) imposes similar information requirements for the 20 GHz band receiving earth

station antenna.4

                By virtue of Section 25.115(e) of the Commission’s rules, Hughes is obliged to submit, as

part of its applications for any Ka-band earth station, measured antenna patterns from a production

antenna of the type it proposes to deploy. This requirement causes a dilemma that has precipitated the

instant limited waiver request.           The 6.3m antennas that are the subject of this instant license

application have not been built yet. While the model of antenna is available, these are not ordinary


3
    See 47 C.F.R. § 25.138(d).
4
    See id. at § 25.138(e).




                                                         3


“production” antennas, and measured data for this new Vertex antenna model as used in the Hughes

gateway network will only be available after the first unit is constructed and tested on site. The same

is true for the 8.1m GDSATCOM antenna model.

           Although Hughes seeks a waiver of the requirement to provide unavailable data with its

application, Hughes does provide other detailed information here in order to show that the protection

of adjacent satellites will be ensured. Specifically, Hughes provides antenna patterns for the proposed

antenna types, as measured by the manufacturer in the case of the 6.3 meter antenna and by a system

integrator in the case of the 8.1 meter antenna. (See Annexes 1 and 2 to this Exhibit B.) These

submissions strongly suggest that the antenna performance for both types of proposed antenna will

comply with the requirements of Section 25.209 of the Commission’s rules.

           Under the Commission’s rules and associated decisions, a waiver of the Commission’s rules is

warranted when “good cause” is shown.5 A waiver may be granted if the grant “would not undermine

the policy objective of the rule in question and would otherwise serve the public interest.”6

           Hughes’ request for a partial waiver of Section 25.115(e) with respect to some of the

information called for in Section 25.138 satisfies these criteria. As explained above, the required

measurements of the Ka-band antennas that are the subject of the modification applications are not

feasible because the antennas in question have not been built and tested.

           The purpose of the Section 25.115(e) is to ensure that FSS earth station operations in the 20/30

GHz frequency band do not subject neighboring satellite networks to harmful interference. As

interference to other GSO FSS satellites will be within the levels permitted by the Commission’s rules,



5
    47 C.F.R. § 1.3. See also WAIT Radio v. FCC, 418 F.2d 1153, 1157 (D.C. Cir. 1969).
6
 EchoStar KuX Corp. Application for Authority to Construct, Launch and Operate a Geostationary Satellite Using the
Extended Ku-band Frequencies in the Fixed-Satellite Service at the 83° W.L. Orbital Location, Order and
Authorization, 20 FCC Rcd 919, 923 (¶ 12) (2004) (Commission waiver for “good cause shown”).



                                                            4


and GSO operations of other satellite operators will not be subject to harmful interference.

Additionally, Hughes stands prepared to provide the additional data per the specifications in Sections

25.138(d) and (e) of the Commission’s rules after each type of antenna is built.

           Furthermore, Section 25.138 was intended to address blanket licensing of ubiquitously

deployed production antennas. As correctly noted in another application for licensing of a fixed

transmit receive earth stations in the 30/20 GHz band, “the wide range of measurement parameters

specified in the rule was meant to account for the wide range of installation possibilities for such mass

marketed antennas, and for the fact that not every antenna would be tested after installation.”7 In the

instant case, there are only 15 earth stations, and each antenna will be used to provide gateway

services in support of traffic carried on the new Jupiter 107W satellite. The gateway antennas will be

very carefully installed and tested – much more so than user terminal antennas used for

communications services. The available antenna data points to the fact that co-frequency FSS

operations of adjacent satellites will not be subject to harmful interference. Moreover, Hughes notes

that the gateway service functions for Jupiter 107W can and will meet the levels in Section 25.138(a)

during all routine operations.

           Finally, grant of this waiver would be consistent with commission precedent, as the antenna

sidelobe performance is expected to be similar to that of other large-diameter Ka-band antennas from

the same manufacturer, and the Commission issued a waiver to Hughes for the large-diameter earth

station antennas it uses successfully today with SPACEWAY 3.

           In short, Hughes’s request for a partial, limited waiver of the information requirements in

Section 25.115(e) in connection with its proposed gateway earth stations for Jupiter 107W are fully

consistent with the purposes of the underlying rule. Moreover, grant of Hughes’s waiver request will


7
    See supra n.1.



                                                       5


serve the public interest by expanding the range and quality of communication services that are

available in the United States.

       For the reasons stated herein, grant of Hughes’s waiver request will serve the public interest

without undermining the purpose of the Commission’s rules. Accordingly, and for good cause shown,

Hughes asks that the Commission grant this waiver request.


2. Petition For Partial Waiver Of Section 25.138

       As Hughes noted above, it requests a waiver of Section 25.138 to allow blanket licensing of the

15 antennas proposed here in the 28.6-29.1 GHz bands. The rule does not currently apply to blanket

licensing of earth stations in this band segment. Good cause exists for Hughes’s request.

       The 28.6-29.1 GHz band is designated for primary non-geostationary fixed-satellite service

operation, and geostationary operations in this band are on a secondary basis to such non-geostationary

operations. Section 25.138 is intended to ensure that a geostationary fixed-satellite service satellite

network’s earth station transmissions are within levels permitted by the Commission’s rules and do not

subject operations of other geostationary fixed-satellite service networks to harmful interference.

Since Hughes will be operating earth stations in the 28.6-29.1 GHz band on the condition that non-

geostationary networks are protected from harmful interference, as will any other earth stations

operating with geostationary satellites, it makes sense to extend and apply the blanket licensing

provisions (including off-axis power limits) of Section 25.138 to the earth station antennas Hughes

proposes here for operation in the 28.6-29.1 GHz band.

       This will ensure a proper interference relationship between Hughes’s Jupiter 107W satellite

and any other geostationary satellites with secondary non-geostationary capability. It will also

advance the public interest by maximizing the efficiency with which secondary geostationary satellite

networks can successfully use the band (and its non-interference-basis corresponding downlink band



                                                    6


at 18.8-19.3 GHz). Finally, grant of the waiver requested here will not compromise or undermine in

any way the purpose of the frequency allocation determinations the Commission made regarding the

28.6-29.1 GHz and 18.8-19.3 GHz bands, as the obligation to operate without causing harmful

interference to/claiming protection from non-geostationary systems in the fixed-satellite service in

these bands is unaffected by the waiver grant requested here.

       For the reasons stated herein, grant of Hughes’s waiver request will serve the public interest

without undermining the purpose of the Commission’s rules. Accordingly, and for good cause shown,

Hughes asks that the Commission grant this waiver request.




                                                   7


             ANNEX 1: RF SPECIFICATION FOR VERTEX ANTENNA (6.3m) 8




    6.3m Performance - Gain
     Gain Summary:

      ƒ RX Gain: 60.49dBi
                Spec = 60.50dBi
      ƒ TX Gain: 64.01dBi
                Spec = 63.50dBi




                                                                                         October 20, 2011   1




8
    As provided by Vertex. Measurement data from same type of antenna Hughes proposes.


                                                      8


6.3m Performance – Sidelobes
Summary:
100% Compliant
with WGS/MIL Std.
188-164A




                               October 20, 2011   2




                    9


     ANNEX 2: RF SPECIFICATION FOR GDSATCOM ANTENNA (8.1m) 9




9
 As provided by Globecomm Systems, Inc. (system integrator). Measurement data from same type of antenna
Hughes proposes.


                                                   10


                                    Gbeconm systems: he
 Transmt Anterna Pattern                                                               hrtvet
  Transmit Antenna Pattern, Azimuth +/ 5 Deg, 10/21/2009 11:12:54 AM
      Test ParametersBs
      t                                               Antenna Pattern
      Aneca        Prgsttora
     Frgugy         scome      *
    mc               uee
   Aniieae             x
   sancomne          mss       ##
   suncome            en
            Resuts             w
   reasune.           —ins                                    ||
   t
   wemue
   cck               T9
                     Ho|s|,«=
                     sn
                                                            T iJ
   msoms             ies   se                         «l
                               s            CY                                 ¥I    apervd
         ax
         zeasiogm)             ow
                                    z*
                                                             m,,    100   2w        smm    om

                                                                   Testporomesty
                                                                   Tesinesasoy
                                      Gitecinn Sptens ie
                                          pporeme
rasermastenaz.See                     Hixpouge tr irmeuse                            roecmmsczpn


                                       Gpecomm Sysems: me
  Transmt Antenna Pateern                                                       CSi
  Transmit Antenna Pattern, Azimuth +/— 2 Deg, 10/21/2009 10:54:17 AM
        Test Parametersuzs
       tm                                               Antenna Pattern
       um            matine
      Framar         mmooure    some
     Hhoes
    nnimrem            uke
                        3       «e
   snncune            se
   imame               ko
             Results            «s
   semumen
   Wemem               san
                       sns                                A /Y      \v\
      e
     Faten Gan
   fomhweee
   naueies
                       as
                       srm
                       is
                       ce
                                |€"" JC
                               g sc
                                            L
                                            m
                                                       ‘// \            \/\_
                                                                               uey
        on             s        #a
          Seatcaton             tm
          a2itoutin)


                                           am im om snpgm.on om im im 2e

                                                                 Tesporomesty
                                                                 TesWinesasey
                                            Gitecznm Smtens ie
                                               16 Outheue
rasermastenAz.20e0                         Firpouige in irmuse                   recmmscom


                                        Gobecomm Sysems: me
 Transmit Anterna Pattern                                                                         ya
  Transmit Antenna Pattern, Elevation +/— 2 Deg, 10/21/2009 10:45:30 AM
        Test Parameters
      se               owz                                 Antenna Pattern
      Aurma          mguimia
      Frawer         meoine      o8
     Aeoke            ver
    nsm                 5
   Sean Gonee z       mosr       m#
   suncewe             2s
            nesurs               «oo
   Temmmes            sn                                          N
   Wetm
    Faunoe            c
                      u2       |g *»=
   renenaece           reso    8 mm       Lt —               I¥                  \vA    = f—]
                                        ETA    nv                                           Av Inmen

                       ss        se PR VWV                                                        w
         Specteaton
         mastoogn                 +#
                                nco
                                    ap am am om on                    o.    se     om      in    im   on

                                                                           Tosperomet:
                                                                           Torsitmssecte
                                           Gitecon Spters be
                                              16 Ou en
rasermasten5.aie0                         Hacpoaagn e rrse uon                                  roecmmsczpn


                                           Goteconm Systems, m
 Receive Antomna Pattemm                                                                    hrtvet
 Receive Antenna Pattern, Elevation +/ 2 Deg, 10/20/2009                       3:48:37 AM
      TestFarametersus
      e                                                     Antenna Pattern
     Anarea        PrastBnta        us,,
     Framg          noune
    mc               mee
   Aslimae             s            sam
   x
   suncoune           mon
                                                                     /\
           resus                    *#
   fasme          —oms
   en                   3P             1                                      U'         SZG
   10@ umm       osm                som                     A              A
    Fatencee     se            |a                    of€                            ~
    oonidarece                 8
                                    mm
     asnears
                                    1aco
         Specitcation
         zozsoorm)                  s#                                               +

                                             as am om sn og,, on               on    im     im   am

                                                                      Tesporometty
                                                                      Tesinesesby
                                             Gitecznm Smtens ie
                                                16 Outheue
rasunrocanmse                                epomge t0 rrmuse                             rmemmsaru


15



Document Created: 2011-10-21 12:41:43
Document Modified: 2011-10-21 12:41:43

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC