Ltr.ground spare upd

LETTER submitted by TerreStar Networks Inc.

TerreStar Networks ATC Authorization

2010-11-24

This document pretains to SES-LIC-20061206-02100 for License on a Satellite Earth Station filing.

IBFS_SESLIC2006120602100_853911

                                                                                          Alexandra Field
                                                                                          SVP Law and Public Policy

                                             12010 Sunset Hills Rd. Reston, VA 20190   alexandra.field@TerreStar.com 703-483-7805




                                           November 24, 2010

FILED ELECTRONICALLY

Marlene H. Dortch
Secretary
Federal Communications Commission
445 12th St., S.W.
Washington, DC 20554

        Re:      TerreStar Networks Inc.
                 Ancillary Terrestrial Component Authorization
                 File No. SES-LIC-20061206-02100
                 Call Sign E060430

Dear Ms. Dortch:

           Paragraph 34(c) of the order1 granting the above-referenced authorization to
operate ancillary terrestrial component (“ATC”) facilities states that the Commission
should be notified, by filing a statement for the record, “of any suspension or abrogation
of the construction contract for TerreStar-2 or any change in the delivery schedule.”
TerreStar Networks Inc. (“TerreStar”), debtor-in-possession,2 hereby notifies the
Commission that in connection with events culminating in TerreStar’s filing a voluntary
petition for relief under chapter 11 of the Bankruptcy Code, construction of TerreStar-2
has been suspended.

       At the time of suspension, construction of TerreStar-2, was largely completed
and most construction payments have been made. Construction of the satellite is more
than 90% complete, and approximately 95% of the construction costs have been paid.
In addition, at the time of suspension initial performance testing, which is used to
establish baseline data for all subsystems, and associated activities were underway.
Command Functional testing is approximately 90% complete and Bus testing is
approximately 30% complete. Planned unit installation is complete except for the
following: 4 bus units, 3 payload units, and test couplers. The solar array panels (12)
are in storage at Loral. One of the two 3-packs has been assembled and deployed
successfully. The 18m Harris reflector completed face-down surface set before being


1 See TerreStar Networks Inc., Application for Blanket Authority to Operate Ancillary Terrestrial Component Base
Stations and Dual-Mode MSS-ATC Mobile Terminals in the 2 GHz MSS Bands, Order and Authorization, DA
10-60 (Int’l Bur., Jan. 13, 2010) (“ATC Order”).
2 The Commission has consented to an involuntary assignment of the FCC authorizations held by
TerreStar Networks Inc. to TerreStar Networks Inc., debtor-in-possession. See Public Notice, Report No.
SES-01296 (Nov. 17, 2010).


Marlene H. Dortch
November 24, 2010
Page 2



secured and stored. Mechanically speaking this deployable assembly is virtually 100%
integrated. The Hawaii and Puerto Rico feed arrays have completed mechanical
assembly. The main feed array is partially integrated. Overall, construction of
TerreStar-2 has progressed in keeping with TerreStar’s obligations and commitments
with respect to its Commission authorizations.

          The contract with Space Systems/Loral for construction of TerreStar-2 is
subject to TerreStar Networks reorganization and bankruptcy court supervision.
TerreStar will inform the Commission once the status of the contract has been resolved.
Consistent with the requirements of the ATC Order, TerreStar will not begin ATC
operations until construction of TerreStar-2 has resumed and there is a contractual
schedule providing for a delivery deadline no more than one year in the future.3

           Please direct questions concerning this matter to the undersigned.

                                                Sincerely,


                                                /s/ Alexandra (Sasha) Field

                                                Senior Vice President and
                                                Deputy General Counsel
                                                Law and Public Policy

cc:     Bob Nelson
        Karl Kensinger




3 See ATC Order, ¶ 34(c).