                          FEDERAL COMMUNICATIONS COMMISSION
                                    Washington, DC 20554


       In the Matter of                           )
                                                  )
       ViaSat, Inc.                               )        Call Sign: S2985
                                                  )
       Petition for Declaratory Ruling Granting   )        File No. SAT-PDR-20161115-00120
       Access to the U.S. for a Non-U.S.-Licensed )
       Nongeostationary Orbit Satellite Network )


                   COMMENTS OF WORLDVU SATELLITES LIMITED

       WorldVu Satellites Limited, d/b/a OneWeb (“OneWeb”), pursuant to Section 25.154(a)

of the rules of the Federal Communications Commission (the “FCC” or “Commission”) and the

Commission’s recent public notice,1 hereby comments on the application of ViaSat, Inc.

(“ViaSat”) for operating authority for a non-geostationary orbit (“NGSO”), medium-Earth orbit

(“MEO”) satellite system in the Fixed Satellite Service (“FSS”) using Ka-band frequencies (the

“Application”).2




1
 See 47 C.F.R. § 25.154(a). See also Satellite Policy Branch Information; Applications
Accepted for Filing; Cut-Off Established for Additional NGSO-Like Satellite Applications or
Petitions for Operations in the 12.75-13.25 GHz, 13.85-14.0 GHz, 18.6-18.8 GHz, 19.3-20.2
GHz, and 29.1-29.5 GHz Bands, Public Notice, DA 17-524 (rel. May 26, 2017) (“Public
Notice”).

2
 ViaSat, Inc. Petition for Declaratory Ruling Granting Access to the U.S. for a Non-U.S.-
Licensed Nongeostationary Orbit Satellite Network, File No. SAT-PDR-20161115-00120 (filed
Nov. 15, 2016) (“ViaSat Petition” or “Petition”).

                                               1


I.        THE COMMISSION SHOULD DEFER CONSIDERATION OF VIASAT’S
          REQUEST TO OPERATE INTER-SATELLITE LINKS IN THE KA-BAND

          In addition to Earth-to-space and space-to-Earth communications, ViaSat proposes to use

spectrum allocated for FSS to support satellite-to-satellite communications between its newly-

proposed NGSO constellation and its pre-existing geostationary orbit (“GSO”) constellation.3

ViaSat asserts that such use is consistent with the Commission’s definition of “fixed-satellite

service” and does not require consideration in a separate processing round.4 Although inter-

satellite links are included within the Commission’s definition of FSS “in some cases,”5 ViaSat

has not provided a technical analysis demonstrating that these satellite-to-satellite links will not

become a source of interference to other NGSO FSS systems. Accordingly, consideration of this

part of ViaSat’s application should be deferred until ViaSat submits such an analysis for review

by the Commission and other interested parties.

          The Ka-band FSS designations in Article 5 of the Radio Regulations of the International

Telecommunications Union (“ITU”),6 as well as in the U.S. Table of Frequency Allocations,7

clearly state that FSS must involve either “Earth-to-space” or “space-to-Earth" communications

– and one reason for this is demonstrated below, as inter-satellite links of this nature are

inherently geometrically different than Earth-to-space and space-to-Earth links. Further, the

Commission has specifically designated spectrum for the inter-satellite service, although ViaSat


3
    ViaSat Petition at 5.
4
    Id. at 6, 30 n.74.
5
    See 47 C.F.R. § 25.103.
6
 Int’l Telecomm. Union, Radio Regulations, Vol. 1, Ch. II, Article 5.511, 5.521, 5.534 (RR5-
116, RR5-119, RR5-124) (2016).
7
    47 C.F.R. § 2.106.

                                                  2


does not request authority for operations utilizing those bands.8 ViaSat’s proposal to use Ka-

band FSS spectrum for its inter-satellite links was discussed at some length at the ITU’s May

2017 Working Party 4A meeting, with no conclusion being reached with respect to use of the

Ka-band for inter-satellite service links.9 At the meeting, “[t]here were views expressed that the

history of the definition of fixed-satellite service and the development of FSS allocations over

multiple revisions to the Radio Regulations suggested that satellite-to-satellite links in the FSS

would require an allocation to the FSS (space-to-space), and suggestions were made that the best

way to address the technical and regulatory questions associated with the potential use described

in the document would be to seek a specific agenda item for WRC-23.”10

          In addition to the regulatory uncertainty, there are also technical reasons why permitting

inter-satellite use could negatively impact critically important and evolving uses of the Ka-band.

The Ka-band is already heavily used worldwide for GSO high-throughput satellites (“HTS”) that

provide critical internet connectivity to millions of people. Overlaying the type of inter-satellite

service proposed by ViaSat on this existing infrastructure will make coordination with GSO and

NGSO satellite systems more difficult, and could result in interference into terrestrial stations for

the following reasons:

         Creating dynamic links between GSO and NGSO satellites in the Ka-band will require

          constantly moving spot beams (uplink and downlink) on GSO satellites that will scan the

          entire Earth’s surface and even beyond, which would be very different from the current


8
    See ViaSat Petition at 10.
9
  Chairman, Working Party 4A, Int’l Telecomm. Union [ITU], Document 4A/364-E, Report on
the Meeting of Working Party 4A, Section 4.3, “WRC-19 agenda item 7, issue H,” at 21-23 (June
9, 2017).
10
     Id. at 22.

                                                   3


          architecture of GSO HTS satellites. Such GSO satellites typically serve only a restricted

          and pre-defined portion of the Earth’s surface, rather than every point on the Earth’s

          surface that is visible to the GSO satellite, allowing them to effectively coordinate with

          other nearby or collocated GSO satellites that may serve different geographic areas. This

          provides increased spectral efficiency by exploiting the spatial separation of the beams

          and service areas of the GSO satellites. If, instead, each GSO satellite has beams that

          constantly scan a large percentage of the Earth’s surface, as would be necessary for

          ViaSat’s proposed satellite-to-satellite application, then the ability to reuse Ka-band

          spectrum in this way would no longer exist.

         The Earth-to-space (uplink) portion of the Ka-band is meant for transmissions from earth

          stations to GSO FSS and NGSO FSS satellites. If in addition, as proposed by ViaSat, Ka-

          band uplinks are also operated from MEO satellites to GSO satellites, this presents a

          potential new geometry for interference into the NGSO FSS links of NGSO FSS

          operators utilizing orbital altitudes higher than ViaSat’s. ViaSat has simply not addressed

          this challenge. Currently, any NGSO FSS system needs to protect itself from interference

          only from transmitting earth stations located on the surface of the Earth, or at most, on

          aircraft relatively close to the Earth’s surface. If the interference source is now a MEO

          satellite directing its beam at the NGSO FSS satellite, then an interference analysis needs

          to be made to show that an NGSO FSS satellite would not be subject to interference

          levels higher than would occur with an Earth-based Ka-band transmitter. ViaSat’s simple

          assertion that the victim NGSO satellites would have a “high degree of off-axis gain

          reduction in the receiving antenna”11 cannot be ensured, since some systems operate with



11
     ViaSat Petition, Attachment A (Technical Annex) at 26.
                                                    4


          low angles of arrival for their gateway or user links, such that the gain towards the edge

          of the Earth may not be significantly lower than the peak receive gain.

         Similarly, ViaSat does not acknowledge that its links from MEO to GSO in the 28 GHz

          band could also impact terrestrial networks when the geometry of the link involves a path

          that passes close to the Earth’s surface. In the 28 GHz band there are no power flux

          density (“PFD”) limits in Article 21 of the ITU’s Radio Regulations or in the

          Commission's rules because this band was never intended for transmissions towards the

          Earth. The figures contained in ViaSat’s Technical Annex seem to imply that the links

          from MEO to GSO are always such that the MEO satellite points away from the Earth.12

          However, ViaSat does recognize that there is a possibility of trans-horizon links passing

          close to the Earth’s surface, and such transmissions could directly impact terrestrial

          receivers in the 28 GHz band.

          The Commission should not process the ViaSat Petition until ViaSat has supplied a full

technical analysis of this potentially serious interference issue. Interested parties should also be

afforded an opportunity to comment on this specific issue raised by the ViaSat Petition, perhaps

in a separate comment cycle.

II.       VIASAT'S EPFD ANALYSIS CONTAINS FLAWED ASSUMPTIONS THAT
          MAY INVALIDATE ITS EPFD COMPLIANCE SHOWING

          OneWeb has significant concerns with respect to ViaSat’s satellite PFD masks with are

used for the EPFDdown analysis. Specifically, they do not appear to represent the operation of the




12
     See ViaSat Petition, Attachment A (Technical Annex) at 22-27.

                                                   5


system as described. A part of one of ViaSat’s PFD masks is shown below (for an NGSO

satellite latitude of 10 degrees).13




        This mask suggests that outside of the 3-degree GSO exclusion zone (either side of the

trough in the diagram above at 15 degrees off-axis from the sub-satellite point), the operational

PFD very gradually increases from -160 dBW/m2/40 kHz to -133 dBW/m2/40 kHz, which

means the service links would need to span 27 dB of signal range. Having such a large variation

in operating PFD across the service area amounts to extremely inefficient use of spectrum –

contrary to ViaSat’s repeated claims of how its system design achieves very high efficiency in

this regard.

        The pattern of this PFD mask appears to mimic the gain pattern of a large satellite

transmit antenna inverted rather than a true satellite PFD mask, which would need to represent

the PFD for all possible positions of the satellite beam. Outside of the GSO exclusion zone, the

PFD levels shown in a PFD mask should essentially be a near-constant level. Instead, the ViaSat

PFD levels in its mask gradually increase logarithmically, which indicates that ViaSat may not

be presenting a PFD mask that reflects the operations of a steerable beam, and instead has taken

a single antenna pointing direction and inverted it at alpha = 0. If ViaSat indeed plans to operate

at peak PFD over only a small fraction of its service area, as indicated by its PFD masks, then it

should make that intention clear and explain the consequences of that approach. Otherwise the



13
  This graph of PFD versus Earth elevation angle has been derived from the raw PFD mask data
provided by ViaSat in its application.


                                                 6


masks should reflect realistic operations, and should accurately account for the proper antenna

rejections, including all of ViaSat’s various satellite antenna beams ranging from 13.9 dBi to

46.5 dBi for the downlink beams in the Ka-band.14

           In addition, ViaSat’s EPFDup analysis may also be overly optimistic. To estimate the user

density, ViaSat starts with a single NGSO satellite’s field of view (“FOV”) and calculates the

area to be 6.358e7 km2.15 ViaSat explains that each satellite can have 20 users on the same

channel transmitting simultaneously,16 so the area of each cell is therefore 6.358e7/20 or 3.18e6

km2 and the user density would be the inverse of this. This analysis is an underestimation, as it

spreads simulated users out in an unrealistically optimistic manner, and does not account for the

fact that equivalent power flux density (“EPFD”) levels are higher when co-frequency users are

more geographically concentrated. This is particularly true considering the use of multiple

steerable beams on ViaSat’s NGSO satellites, which provide the capability to concentrate all

their beam coverage over restricted geographic regions.

           To address this problem, OneWeb believes a more realistic calculation would be to take

the entire area of the Earth, divide it by each of the 24 satellites, and then divide it again by the

20 user links to each satellite. Even this approach would likely not represent the limiting case for

the maximum level of user density that its system will support. Neither does it take account of

the fact that users are more likely to be concentrated on land and in habitable regions.

Nevertheless, this still-optimistic approach would give an average area per user of 5.1e8/24/20,




14
     See ViaSat Schedule S.
15
     ViaSat Petition, Attachment A (Technical Annex), Exhibit 1 at 6.
16
     Id.
                                                   7


or 1.06e6 km2, which corresponds to a user density that is three times higher than ViaSat

calculates. This will significantly impact the calculated EPFDup levels.

           As ViaSat has acknowledged, EPFD limits are a critical tool to ensure that NGSO

networks do not cause harmful interference into the geostationary arc.17 ViaSat’s EPFD analysis

should be updated to accurately reflect its intended operational parameters, thus allowing the

Commission and other interested parties an opportunity to gain confidence that ViaSat’s NGSO

network will not cause harmful interference into GSO operations.

III.       VIASAT’S PFD CALCULATIONS ARE MINIMAL AND DO NOT
           DEMONSTRATE THAT TERRESTRIAL STATIONS WILL BE ADEQUATELY
           PROTECTED

           The ability of ViaSat’s NGSO network to meet the Commission’s and the ITU’s PFD

limits is not clear.18 Accordingly, ViaSat should update its applications with a PFD analysis that

correctly demonstrates compliance with the Commission’s applicable PFD limits.

           ViaSat only demonstrates compliance with the PFD limits for elevation angles of 25

degrees and greater. ViaSat merely asserts, without any demonstration, that the PFD limits for

elevation angles below 25 degrees are met.19 ViaSat’s assertion relies on the belief that its

satellite transmit beam gain is rolling off faster than the PFD limit reductions for the elevation

angles below 25 degrees.20 This should be quantified so that PFD limit compliance can be

ensured.


17
  See Reply Comments of ViaSat, Inc., IB Docket No. 16-408, at 8 (filed Apr. 10, 2017) (noting
that “tt is essential that the Commission develop and adopt EPFD limits for both the Ka band and
the V band that adequately protect current GSO network technology from NGSO interference”).
18
  47 C.F.R. § 25.208(e); Int’l Telecomm. Union, Radio Regulations, Vol. 1, Ch. VI, Article 21,
Table 21-4, RR21-7 (2016).
19
     ViaSat Petition, Attachment A (Technical Annex) at 18.
20
     Id.
                                                  8


IV.     CONCLUSION

        The Commission should defer ViaSat’s request to use scarce Ka-band spectrum for inter-

satellite links pending further study to ensure that these links do not cause harmful interference

to other NGSO systems. In addition, ViaSat should be required to revise and update its EPFD

and PFD showings to accurately reflect operational levels compliant with the Commission’s

rules prior to any disposition of its Petition.



                                                  Respectfully submitted,

                                                  WORLDVU SATELLITES LIMITED


                                                   /s/ Mariah Shuman
                                                  __________________________
                                                  Mariah Shuman
                                                  Senior Director, Regulatory Affairs
                                                  WorldVu Satellites Limited
                                                  1400 Key Boulevard, Suite A1
                                                  Arlington, VA 22209

                                                  Brian D. Weimer
                                                  Douglas A. Svor
                                                  Ashley Yeager
                                                  Sheppard Mullin Richter & Hampton LLP
                                                  2099 Pennsylvania Ave. NW, Suite 100
                                                  Washington, D.C. 20006
                                                  (202) 747-1930

                                                  Counsel to WorldVu Satellites Limited

June 26, 2017




                                                    9


  CERTIFICATION OF PERSON RESPONSIBLE FOR PREPARING ENGINEERING
                           INFORMATION



I hereby certify that I am the technically qualified person responsible for preparation of the

engineering information contained in these Comments, that I am familiar with Part 25 of the

Commission’s rules, that I have either prepared or reviewed the engineering information

submitted in these Comments, and that it is complete and accurate to the best of my knowledge

and belief.



Dated: June 26, 2016



                                          /s/____Marc Dupuis_________________

                                         Marc Dupuis
                                         Senior Director, Spectrum Affairs
                                         WorldVu Satellites Limited
                                         1400 Key Boulevard, Suite A1
                                         Arlington, VA 22209


                                CERTIFICATE OF SERVICE

I, Ashley Yeager, hereby certify that on this 26th day of June 2017, a copy of the foregoing
Comments is being sent via first class, U.S. Mail, postage paid, to the following:

Christopher J. Murphy
Daryl T. Hunter
Christopher Hofer
VIASAT, INC.
6155 El Camino Real
Carlsbad, CA 92009-1699


John P. Janka
Elizabeth R. Park
Jarrett S. Taubman
LATHAM &WATKINS LLP
555 Eleventh Street, NW
Washington, DC 20004
Counsel to ViaSat, Inc.



                                                  /s/ Ashley Yeager_______________________
                                                  Ashley Yeager



Document Created: 2017-06-26 23:25:26
Document Modified: 2017-06-26 23:25:26

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC