SpaceX Further Conso

OPPOSITION submitted by Space Exploration Holdings, LLC

SpaceX Further Consolidated MOD Opposition

2019-02-21

This document pretains to SAT-MOD-20181108-00083 for Modification on a Satellite Space Stations filing.

IBFS_SATMOD2018110800083_1628189

                                        Before the
                 FEDERAL COMMUNICATIONS COMMISSION
                                 Washington, D.C. 20554


____________________________________
                                          )
Application of                            )
                                          )
SPACE EXPLORATION HOLDINGS, LLC           )     Call Signs: S2983 and S3018
                                          )
For Modification of Authorization for the )     File No. SAT-MOD-20181108-00083
SpaceX NGSO Satellite System              )
____________________________________)




    FURTHER CONSOLIDATED OPPOSITION TO PETITIONS AND RESPONSE
         TO COMMENTS OF SPACE EXPLORATION HOLDINGS, LLC




   William M. Wiltshire                       Patricia Cooper
   Paul Caritj                                Vice President, Satellite Government
                                              Affairs
   HARRIS, WILTSHIRE & GRANNIS LLP
   1919 M Street, N.W.                        David Goldman
   Suite 800                                  Director, Satellite Policy
   Washington, DC 20036
   202-730-1300 tel                           SPACE EXPLORATION TECHNOLOGIES CORP.
   202-730-1301 fax                           1155 F Street, N.W.
                                              Suite 475
   Counsel to SpaceX                          Washington, DC 20004
                                              202-649-2700 tel
                                              202-649-2701 fax

   February 21, 2019


                                             SUMMARY

       In this response, SpaceX addresses questions raised by SES/O3b and OneWeb about its

proposed modification to its license. SpaceX’s proposed modification will enhance the already

considerable safety attributes of its system by taking advantage of the self-cleaning properties of

a lower altitude. Critically, SpaceX took care in designing these proposed changes to ensure they

will not increase spectral interference to any other system. Because nothing in the record

undermines this fundamental point, the Commission should reject the requests to defer or deny the

application.

       The Commission authorized SpaceX early last year to construct, launch, and operate a

constellation of 4,425 non-geostationary orbit (“NGSO”) satellites. Following on its experience

successfully operating its experimental satellites, SpaceX applied to modify its license to improve

the safety of the system. Specifically, SpaceX proposed to operate a portion of its constellation at

550 km to capture the benefits of that self-cleaning orbit. SES/O3b and OneWeb both filed in

response to SpaceX’s proposal.

       SES/O3b and OneWeb both challenge SpaceX’s interference analysis. SES/O3b presents

no analysis of its own, but rather asserts that SpaceX used a representative system in its analysis

that may not reflect every other proposed system. But the Commission does not – and should not

– impose the extraordinary regulatory burden on anyone wishing to update its system to have to

perform exhaustive analysis of any particular configuration for every other satellite system.

Instead, the Commission correctly allows an applicant to show analytically that its modification

will not increase interference. Here, SpaceX went even further by performing simulations using a

representative system to confirm its conclusions. This approach is especially appropriate here

because SpaceX proposes to reduce the number of satellites, reduce its altitude, and reduce its



                                                 i


transmit power. Nevertheless, to assuage SES/O3b’s concern, SpaceX is submitting herewith an

analysis of the impact on O3b’s and OneWeb’s authorized systems that confirms that the proposed

modification will not increase interference.

       OneWeb in turn rests its analysis on two faulty assumptions: first, that SpaceX intends to

use hundreds of gateways in the Ku-band and second, that SpaceX will operate both gateways and

user terminals to transmit in the same Ku-band spectrum at a common given location. SpaceX has

made no such claims. Without the support of these assumptions, OneWeb’s objections to the

modification fall apart. SpaceX’s proposed modification would both reduce the number of

satellites in view from any point on the Earth and allow SpaceX to operate at reduced power levels,

thereby maintaining or improving interference for other licensed spectrum users. Not surprisingly,

SpaceX’s analysis of the impact of the proposed modification on OneWeb’s authorized system

submitted herewith shows no greater potential for interference.

       OneWeb also raises concerns about space safety that are similarly misplaced. While

SpaceX has always intended to operate a capable and reliable system, OneWeb is now challenging

SpaceX’s plan to reduce altitude to further enhance the space safety attributes of its system.

Considering OneWeb’s frequent request that SpaceX take this exact step of moving farther away

from OneWeb’s proposed constellation, one is left to wonder whether OneWeb would be satisfied

with SpaceX operating at any altitude whatsoever.

       Lastly, SES/O3b and OneWeb ask the Commission to await a determination from the

International Telecommunication Union (“ITU”) as to whether SpaceX’s modification complies

with applicable limits on equivalent power flux-density (“EPFD”).           Yet the Commission

historically made this determination on its own, and only changed this rule recently. As a company

that chose to license its system in the United States, SpaceX has confidence that the Commission



                                                ii


remains fully capable of making its own determination now on EPFD compliance, subject to later

confirmation by the ITU.

       Because neither SES/O3b nor OneWeb raise any reason to deny or defer consideration of

SpaceX’s modification, the Commission should act expeditiously to allow SpaceX to proceed

with its NGSO system that will extend the benefits of broadband service to customers in rural

and other areas of the U.S.




                                               iii


                                                    TABLE OF CONTENTS
                                                                                                                                               Page

SUMMARY ............................................................................................................................................. i

BACKGROUND ................................................................................................................................... 2

I.      THE PROPOSED MODIFICATION WILL NOT INCREASE POTENTIAL INTERFERENCE
        FOR OTHER NGSO SYSTEMS ....................................................................................................... 3

        A.       SpaceX’s Analysis and Commission Precedent Confirm That the
                 Modification Will Not Result in Increased Interference ............................................... 4

        B.       Deployment of a Handful of Ku-band Gateways for a Limited Period
                 Will Not Materially Affect the Interference Environment............................................. 6

II.     THE PROPOSED MODIFICATION WILL ENHANCE THE ORBITAL DEBRIS MITIGATION
        PROFILE OF SPACEX’S NGSO CONSTELLATION, NOT PRESENT CONCERNS ......................... 11

III.    THE COMMISSION IS FULLY CAPABLE OF MAKING ITS OWN INITIAL DETERMINATION
        WITH RESPECT TO SPACEX’S COMPLIANCE WITH EPFD LIMITATIONS................................. 16

CONCLUSION .................................................................................................................................... 19


                                                 Before the
                   FEDERAL COMMUNICATIONS COMMISSION
                                        Washington, D.C. 20554

___________________________________
                                          )
Application of                            )
                                          )
SPACE EXPLORATION HOLDINGS, LLC           )                 Call Signs: S2983 and S3018
                                          )
For Modification of Authorization for the )                 File No. SAT-MOD-20181108-00083
SpaceX NGSO Satellite System              )
____________________________________)


      FURTHER CONSOLIDATED OPPOSITION TO PETITION AND RESPONSE
          TO COMMENTS OF SPACE EXPLORATION HOLDINGS, LLC

        Space Exploration Holdings, LLC, a wholly owned subsidiary of Space Exploration

Technologies Corp. (collectively, “SpaceX”), hereby opposes the Petition to Deny or Defer filed

by WorldVu Satellites Limited (“OneWeb”) and responds to the Comments filed by SES

Americom Inc. and O3b Limited (“SES/O3b”) with respect to the above-referenced application

for modification of SpaceX’s authorization to launch and operate a non-geostationary orbit

(“NGSO”) satellite system. 1 As discussed further below, SES/O3B and OneWeb fail to present

any reason to deny or defer this application, and the Commission should grant it expeditiously. A

prompt review will allow SpaceX to proceed with development and deployment of its NGSO

system and extend the benefits of broadband service to customers in rural and other areas of the

U.S. currently underserved or unserved by other alternatives.




1
    See Petition to Deny or Defer of WorldVu Satellites Limited (“OneWeb Petition”); Comments of SES Americom,
    Inc. and O3b Limited (“SES/O3b Comments”). Both filings were submitted in IBFS File No. SAT-MOD-
    20181108-00083 on February 8, 2019. SpaceX previously responded to earlier-filed comments and petitions
    from several small satellite operators. See Consolidated Opposition to Petitions and Response to Comments of
    Space Exploration Holdings, LLC, IBFS File No. SAT-MOD-20181108-00083 (Feb. 11, 2019).




                                                       1


                                              BACKGROUND

         Last year, the Commission authorized SpaceX to construct, deploy, and operate an NGSO

constellation consisting of 4,425 satellites operating in 83 orbital planes at five different altitudes

ranging from 1,110 km to 1,325 km. 2 That authorization anticipated that SpaceX would use Ku-

band spectrum for communications between its satellites and user terminals, while the Ka-band

would be used for communications with gateway earth stations. The Commission placed several

conditions on that authorization, including (1) submission and approval of an updated orbital

debris mitigation plan, and (2) receiving a “favorable” or “qualified favorable” finding by the ITU

Radiocommunication Bureau regarding compliance with applicable EPFD limits.3 In addition,

that authorization “is subject to modification to bring it into conformance with any rules or policies

adopted by the Commission in the future.” 4

         To accelerate its deployment schedule and further improve its space safety profile, SpaceX

has proposed a modification of its license that would relocate 1,584 satellites previously authorized

to operate at an altitude of 1,150 km to an altitude of 550 km. 5 SpaceX detailed, among other

things, how this move will enhance the considerable space safety attributes of SpaceX’s

constellation by ensuring that any orbital debris will undergo rapid atmospheric re-entry and

demise, even in the unlikely event that a spacecraft fails in orbit. 6 It also submitted an analysis

showing that operating slightly fewer satellites at a lower altitude would not increase the potential



2
    See Space Exploration Holdings, LLC, 33 FCC Rcd. 3391 (2018) (“SpaceX Authorization”).
3
    See id. ¶¶ 9, 40n, and 40p.
4
    Id. ¶ 40(r).
5
    See Application for Modification of Authorization for the SpaceX NGSO Satellite System, IBFS File No. SAT-
    MOD-20181108-00083 (Nov. 8, 2018) (“SpaceX Modification”).
6
    SpaceX also noted other benefits of operating at lower altitude, including reduced signal latency and improved
    spectral efficiency. See, e.g., id. at 8.




                                                        2


for interference to other NGSO systems. In addition, SpaceX submitted an updated orbital debris

mitigation showing and a demonstration of compliance with applicable EPFD limits, with a request

that the Commission deem the related conditions of its existing authorization satisfied. 7 SpaceX

did not, however, request relief from the obligation to comply with rules adopted in the future.

         SES/O3b and OneWeb contend that the Commission should require a further

demonstration from SpaceX that its modified system would not increase potential interference to

other NGSO systems, or else defer the application to a new processing round. They also argue

that the Commission should not deem SpaceX’s modified system compliant with applicable EPFD

limitations in the absence of an ITU determination to that effect. OneWeb raises additional

questions with respect to the effect of SpaceX’s proposed operations at 550 km on orbital debris.

As discussed below, these concerns either are not well founded from a technical perspective, are

within the Commission’s competence to resolve, or are the kind of industry-wide issues that are

properly resolved in a rulemaking proceeding rather than a licensing determination.

                                              DISCUSSION
    I.      THE PROPOSED MODIFICATION WILL NOT INCREASE POTENTIAL INTERFERENCE
            FOR OTHER NGSO SYSTEMS

         SpaceX proposes to operate slightly fewer satellites at a lower altitude and at lower power

than specified in its initial license. SpaceX would use Ku-band spectrum and Ka-band spectrum

for gateway transmissions during different stages of development. As discussed below, concerns

raised by SES/O3b and OneWeb that these proposed changes would result in an increase in

interference do not withstand scrutiny.




7
    See SpaceX Modification, Technical Attachment at 23-24, 38-47, and Annexes 1 and 2.



                                                      3


            A. SpaceX’s Analysis and Commission Precedent Confirm That the Modification
               Will Not Result in Increased Interference

        Several aspects of the proposed modification combine to reduce the potential for

radiofrequency interference compared to the operations SpaceX is currently authorized to conduct.

First, SpaceX proposes to decrease slightly the number of satellites in its constellation from 4,425

to 4,409. Second, operating at a lower altitude will reduce radiofrequency interference in two

fundamental ways: fewer satellites will be visible above the minimum elevation angle at any

particular time at any point in the U.S., and the satellites can transmit and receive at lower EIRP

power levels.

        As SpaceX noted in its application, the Commission previously recognized these as factors

that demonstrate that a modification will not increase interference to other NGSO systems. 8 To

confirm the Commission’s common-sense conclusion, SpaceX submitted an analysis of the

potential impact of its modified constellation on a representative NGSO system (IK-NGSO-A10K-

1). 9 That analysis considered the dynamic, time-varying interference expressed as a cumulative

distribution function of the interference-to-noise ratio for varying percentages of time under worst-

case assumptions. The analysis also confirmed that the modification will not increase the potential

interference into other NGSO systems by showing that the new interference levels resulting from

the modification are no worse (and are often better) than the interference levels under the original

plan for all percentages of time.




8
    See Teledesic LLC, 14 FCC Rcd. 2261, ¶¶ 13, 17 (IB 1999) (“Teledesic”). Accordingly, SES/O3b is incorrect in
    asserting that SpaceX’s interference showing rests solely on an analysis of the Intersputnik ITU filing. See
    SES/O3b Comments at 3.
9
    See SpaceX Modification, Technical Attachment at Section A.8.




                                                       4


         Notwithstanding this analysis and the Commission’s prior conclusions, SES/O3b questions

SpaceX’s showing that its proposed modification would not increase interference to other NGSO

systems. Because O3b is authorized to access the U.S. market using an NGSO constellation

operating only in Ka- and V-band spectrum, 10 it should not be affected by SpaceX’s proposal to

operate in the Ku-band during its initial deployment phase. O3b’s concern therefore must relate

only to the use of Ka-band spectrum for gateway links.

         SES/O3b does not challenge the Commission’s previous conclusions about modifications

with fewer satellites and lower power levels, nor does it provide its own analysis of SpaceX’s

proposed modification. Rather, it simply asserts that the information submitted by SpaceX is not

sufficient because it claims – with no analysis – that SpaceX’s interference analysis may not be

representative of other systems and that interference analysis should be performed using a system

considered in the recent Ku/Ka-band processing round. But the information SpaceX has supplied

is consistent with Commission precedent; in fact, it is the very same sort that the Commission

found sufficient to grant a modification in Teledesic. Commission precedent does not – and should

not – require an applicant to make exhaustive demonstrations that a modification will not change

interference for any configuration with respect to every other system. Instead, the Commission

correctly allows applicants to show analytically that its modification will not increase interference

(especially in cases like this when the modification includes factors such as a reduction in number

of satellites, reduction in altitude, and reduction in transmit power).

         In this case, SpaceX went further and performed simulations using a representative NGSO

system designed to operate in both the Ku- and Ka-bands. This should be more than sufficient to

demonstrate that the proposed modification will not increase interference. Nevertheless, to


10
     See O3b Limited, 33 FCC Rcd. 5508, ¶ 1 (2018).



                                                      5


assuage SES/O3b’s concerns about radiofrequency interference on specific systems involved in

the Commission’s Ku/Ka-band processing round, SpaceX is submitting herewith an analysis of

the interference impact on the NGSO systems authorized for O3b and OneWeb. 11 As with the

representative IK-NGSO-A10K-1 network, this analysis confirms that the proposed modification

will not result in increased interference to either of those systems.

         SES/O3b also contends that SpaceX should be required to present an analysis that considers

only the initial shell of its constellation proposed in the modification application, rather than the

entire constellation as modified. It bases this contention on the fact that SpaceX at one time

requested a milestone assessment based on a phased deployment, and the fact that in denying that

request the Commission’s left open the possibility that SpaceX could seek such relief in the

future. 12 To be clear, SpaceX has not requested such relief in this proceeding, and has proposed

its modification precisely in an effort to expedite deployment of its entire constellation. Moreover,

should SpaceX request such relief in the future, SES/O3b and all other interested parties would

have an opportunity to comment on that request and demand any sort of analysis they believe

appropriate. Accordingly, there is no reason to require such a limited analysis at this time.

             B. Deployment of a Handful of Ku-band Gateways for a Limited Period Will Not
                Materially Affect the Interference Environment

         OneWeb also raises concerns that SpaceX’s Ku-band operations during the initial

deployment phase will cause actual interference to some future OneWeb service, even though

OneWeb has not yet applied for authority to operate a single Ku-band earth station in the U.S. and




11
     See Attachment A hereto.
12
     See SES/O3b Comments at 4.




                                                  6


is not providing any service in this country with which SpaceX could interfere. 13 OneWeb

criticizes SpaceX’s analysis that demonstrates temporary gateways operating in the Ku-band will

not increase interference to other NGSO systems authorized to use the band, such as OneWeb.

OneWeb’s concerns are misplaced. In fact, rather than base its critiques on facts in SpaceX’s

application or evidence in the record, OneWeb relies entirely on a collection of flawed assumptions

cobbled together into an equally-flawed fictional scenario.

          Specifically, OneWeb claims SpaceX failed to consider the potential effect of allowing up

to four satellites to communicate in the same frequency with both a gateway and a user terminal

at the same location. OneWeb offers various scenarios to project how this combination of up to

five satellites creates in-line interference, first on the downlink and then on the uplink. 14 But this

analysis not only rests entirely on two flawed assumptions, it also fails to take into account basic

operational differences between gateways and user terminals.                        Once these defective pillars

buttressing OneWeb’s claims are removed, the criticism crumbles.

          The first flawed assumption supporting OneWeb’s analysis is that SpaceX plans to deploy

“hundreds” of Ku-band gateways across the U.S. 15 SpaceX has said no such thing. Instead,

SpaceX made clear in its application that only a limited number of first-generation satellites will

use the Ku-band for gateway communications for a discrete period until it transitions to Ka-band

for gateways. Accordingly, SpaceX will only use a handful of Ku-band gateways scattered across

the U.S., rather than the hundreds envisioned by OneWeb. By contrast, the Commission already



13
     See WorldVu Satellites Limited, 32 FCC Rcd. 5366, ¶ 8 (2017) (“OneWeb Authorization”) (“A grant of U.S.
     market access includes no authority to deploy earth stations in the United States. Authority for such earth stations
     must be requested in an appropriate earth station application.”).
14
     See OneWeb Petition at 5-8.
15
     Id. at i.




                                                           7


anticipated that SpaceX would deploy a very large number of user terminals operating in the Ku-

band. 16 OneWeb’s dire projections simply do not reflect the actual planned deployment of just a

few additional Ku-band gateway earth stations scattered among a far larger population of Ku-band

user terminals, which would be highly unlikely to materially affect the coordination environment.

         OneWeb’s second flawed assumption is that SpaceX will rely on the same Ku-band

spectrum for both gateway and user transmissions at a common given location. Once again,

SpaceX never made such an assertion. To the contrary, SpaceX’s allocation of Ku-band downlink

beams between users and gateways will simply divide that finite number of beams between those

two applications. SpaceX will not increase the total number of beams in use at any given time.

Thus, the extreme interference scenario envisioned in OneWeb’s analysis resulting from co-

frequency operations of four gateway beams and a user beam at a given location simply will never

happen.

         Even setting aside this decisive factor, OneWeb’s analysis of potential downlink

interference fails for at least two additional reasons. 17 First, OneWeb disregards power reductions.

When SpaceX uses a downlink beam for gateway communications, it will reduce its power by 6

dB, thus reducing the potential for interference. 18              Although OneWeb noted this fact, its

calculations do not appear to have taken it into account. 19 Second, OneWeb exaggerates the impact

by disregarding the temporary nature of the proposed gateway operation in Ku-band. As noted in

the modification application, SpaceX plans to launch only a limited number of first-generation

satellites before it brings a new generation of satellites online with Ka-band capabilities for


16
     See generally IBFS File No. SES-LIC-20190201-00217 (application for blanket license for the operation of up to
     1,000,000 user terminal earth stations to use with SpaceX’s NGSO constellation).
17
     See OneWeb Petition at 5-7.
18
     See SpaceX Modification, Technical Attachment at n.8.
19
     See OneWeb Petition at 6.



                                                         8


gateway links. These first-generation satellites are unlikely to converge and communicate with

the same gateway earth station at any given time. As a practical matter, four first-generation

satellites will rarely, if ever, communicate simultaneously with a Ku-band gateway.

         OneWeb’s analysis of potential uplink interference is once again based entirely on the

incorrect assumption that SpaceX will use the same frequency for user terminal and gateway

transmissions in the same spot beam. 20 Even so, OneWeb fails to take into account the very

different operations of a user terminal versus a gateway. Although user and gateway uplink beams

may transmit at the same EIRP, gateway earth stations use larger antennas with better sidelobe

characteristics and therefore reduce the probability of an in-line interference event with another

NGSO.

         The significance of this operational distinction is clear when contrasting two scenarios.

The first scenario considers two collocated user terminals from two different NGSO systems. The

unwanted earth station is a user terminal with 33 dBi gain (approximately 0.4 m diameter), 0 dB

EIRP at beam peak, and a standard beam pattern described by ITU Radio Regulations, Appendix

8. Assume further that the impacted satellite can accept interference up to a level of -20 dB EIRP.

Under these assumptions, the unwanted earth station would need to point away from the impacted

satellite by at least 11.3 degrees to avoid creating harmful interference.

         Now consider the same scenario above but substituting a gateway as the unwanted earth

station. Assuming a higher 41 dBi gain (approximately 1 m diameter), and the same peak EIRP,

antenna pattern, and threshold for unacceptable interference at the impacted satellite, the required

angular separation to avoid interference is reduced to just 3.75 degrees. In other words, the area



20
     See id. at 7-8.




                                                  9


of the protection zone around the satellite for the gateway is only 11% of the area for the user

terminal. 21 Even assuming four collocated gateway earth stations transmitting at the same

frequency, the total area of the combined protection zone is only 44% of the area for a single user

terminal. In other words, the probability of an in-line event involving a gateway is less than half

compared to a user terminal.

         Looking at the issue in a slightly different way yields a similar result. Making the same

assumptions as before, consider the case of a single user terminal communicating with a SpaceX

satellite. If the separation angle to the nearest impacted satellite is 11.3 degrees, then interference

to the impacted satellite meets the acceptable -20 dB criterion. Now assume instead there are four

SpaceX gateways communicating with four SpaceX satellites – and no user terminals operating in

the same spectrum from that location, as discussed above – each with a separation angle of 11.3

degrees. In this scenario, interference to the impacted satellite from one gateway is -32 dB and

from all four gateways combined is -26 dB – a result that is actually lower than the interference

from a single user terminal. OneWeb’s analysis takes no account for these dramatic differences

in operation between gateways and user terminals.

         Overall, OneWeb rested its interference analysis entirely on incorrect assumptions and

overlooked basic operational distinctions in the actual effect of the proposed SpaceX modification.

By contrast, Attachment A hereto provides an analysis based on the actual parameters of SpaceX’s

system as modified, and demonstrates that the proposed modification will not result in increased

interference to OneWeb’s authorized NGSO system. Moreover, the Commission required each

system to coordinate with all other NGSOs as a condition on each authorization. Accordingly,

OneWeb has presented no plausible basis for the Commission to question the likelihood that the


21
     The calculation is (3.75/11.3)2 = .11.



                                                  10


potential for interference to other NGSO satellite systems would actually be reduced by SpaceX’s

plan to operate a limited number of Ku-band earth stations with a limited number of first-

generation satellites at lower altitude and lower power.

     II.      THE PROPOSED MODIFICATION WILL ENHANCE THE ORBITAL DEBRIS MITIGATION
              PROFILE OF SPACEX’S NGSO CONSTELLATION, NOT PRESENT CONCERNS

           The principal reason that SpaceX proposed to operate a portion of its system at a lower

altitude was to enhance further the already considerable space safety attributes of its

constellation. 22 The well-known atmospheric advantage of the 550 km altitude naturally removes

objects from orbit, including loose debris, and also improves safety when, in off-nominal events,

satellites fail to fully complete their disposal operations. In this case, moving to a lower altitude

also provides the additional benefit of increasing the distance between SpaceX’s satellites and

other proposed large NGSO constellations, including OneWeb – corresponding to a request

OneWeb has repeatedly made. 23 Despite all of the positive safety attributes of this modification,

OneWeb nonetheless claims that SpaceX’s proposed operation at a self-cleaning altitude raises

additional orbital debris concerns.

           First, OneWeb argues that “the Commission must seek additional information from

[SpaceX] regarding the propulsive capabilities and maneuverability of its proposed initial

deployment satellites.” 24 This argument is curious, given that SpaceX made very clear in the

Modification Application that its spacecraft would be fully propulsive and maneuverable. For


22
     See SpaceX Modification at 6-8.
23
     See, e.g., Reply Comments of WorldVu Satellites Limited, IBFS File No. SAT-LOA-20161115-00118, at 9 (July
     14, 2017) (“OneWeb reiterates its strong belief that the 125 km Safety Buffer Zone is in the public interest and
     will facilitate a safer orbital environment for all constellations authorized by the Commission pursuant to the
     current processing round. OneWeb encourages Space Exploration Holdings to consider adjusting the planned
     altitudes of its constellation.”).
24
     OneWeb Petition at 17.




                                                         11


example, it states that “SpaceX spacecraft will nominally continue to perform active conjunction

avoidance at all stages of flight.” 25 Even during the de-orbit phase, “SpaceX satellites will

continue to perform conjunction avoidance until the high atmospheric torques from low altitudes

cause the vehicle to be uncontrollable.” 26 Moreover, “[a]t all times during this descent, including

the period during which they will traverse the orbital altitude of the ISS and other NASA assets,

the spacecraft will retain sufficient fuel to perform maneuvers.” 27 Accordingly, OneWeb’s

assertion that SpaceX’s orbital debris mitigation plan “offers no insights as to the continued

viability of [maneuvering] capabilities” is simply inaccurate. 28

           OneWeb’s concern in this regard apparently grew out of its misconceptions about the

operations of SpaceX’s experimental satellites, Microsat 2A and 2B. 29 SpaceX launched these

spacecraft in February 2018, and included much of the SpaceX-built technology that will go into

the satellites in its constellation, such as its phased-array antennas and its Hall-effect thruster

propulsion system. SpaceX originally expected to operate these satellites at approximately 515 km

and then raise them to an altitude of 1,125 km for further testing, but chose not to do so. From

this, OneWeb leaps to an unsupported conclusion that SpaceX’s experimental satellites faced

“operational setbacks.” 30 To the contrary, SpaceX made a conscious decision to remain at this

optimal altitude for further experimentation. The Microsats have now been in orbit for nearly a

year, and have been under propulsive control and performing maneuvers as necessary to avoid



25
     SpaceX Modification, Technical Attachment at 42.
26
     Id. at 39.
27
     Id.
28
     OneWeb Petition at 18.
29
     See Call Sign WI2XTA, ELS File No. 0298-EX-CN-2016 (granted Nov. 16, 2017).
30
     OneWeb Petition at 14.




                                                        12


orbital debris. 31 Far from facing setbacks, the experimental program has validated SpaceX

technology – including the Hall-effect thruster propulsion system and the capabilities of the

communications payload. Thus, unlike OneWeb, SpaceX has successfully tested its spacecraft

design in advance of initiating deployment of its commercial constellation.                           In fact, the

Commission should take steps to encourage others to test their spacecraft design before full

deployment rather than saddle them with additional regulatory burdens as suggested by OneWeb.

         OneWeb next argues that the Commission should be “deeply concerned” by the idea of

SpaceX operating a portion of its constellation at 550 km. 32 OneWeb notes concern that its own

satellites will need to traverse this altitude during its orbit raising phase. 33 Yet OneWeb’s satellites

would also need to traverse across SpaceX orbits even at their higher currently authorized altitude

of 1,150 km. Presumably, OneWeb’s operational plan takes into account safe measures for the

orbit raise of its satellites through the many constellations up to their proposed 1,200 km operating

altitude. Moreover, although OneWeb questions the reliability of SpaceX’s de-orbit design,

SpaceX will exceed new stricter parameters NASA recently determined for safe operation of large

constellations 34 by achieving a 100% success rate of post-mission disposal within 5 years, even

assuming worst-case conditions. 35 SpaceX disagrees with OneWeb’s frequent refrain that its




31
     As part of Microsat conjunction avoidance operations, SpaceX has screened thousands of routine conjunction
     alerts, and operated the thrusters in the rare occasion the spacecraft need to be diverted to a new location.
32
     OneWeb Petition at 19.
33
     See id.
34
     See J.-C. Liou, et al., NASA ODPO’s Large Constellation Study, ORBITAL DEBRIS QUARTERLY NEWS, at 4-7
     (Sept. 2018) (suggesting that post-mission disposal within five years at a 99% success rate would mitigate the
     debris concern related to large NGSO constellations), available at https://orbitaldebris.jsc.nasa.gov/quarterly-
     news/pdfs/odqnv22i3.pdf.
35
     See SpaceX Modification, Technical Attachment at 39-41.




                                                         13


satellites should be given a 125 km “buffer zone,” 36 but given that SpaceX’s proposed modification

fulfills OneWeb’s repeated demand that SpaceX move away from OneWeb’s constellation at 1,200

km, one can only wonder whether SpaceX could operate at any altitude to OneWeb’s satisfaction.

         Third, OneWeb clutches at even thinner threads when it asserts that SpaceX’s constellation

presents a “troubling risk profile” due to the potential for survivable debris. 37 OneWeb does not

deny that SpaceX far surpasses the U.S. and international standards for safety of de-orbit

operations.     Instead, OneWeb argues that the Commission should apply a new and as-yet

unquantified standard to SpaceX that would assess potential risks in the aggregate. Such a standard

has been applied to no other satellite operator at any orbit – including OneWeb and other applicants

in the Ku/Ka-band NGSO processing round. In fact, OneWeb itself has repeatedly refused to make

available comparably detailed information on its collision avoidance and orbital debris plans for

public scrutiny or Commission review. 38 If a new rule were imposed, it should be considered and

adopted in the ongoing Orbital Debris NPRM rulemaking and, if adopted, then made applicable

to all NGSO system authorizations. It would be inappropriate to apply a novel and unannounced

standard to SpaceX uniquely. Indeed, SpaceX’s existing authorization is conditioned upon

compliance with any future rule. 39




36
     See, e.g., Comments of WorldVu Satellites Limited, IBFS File No. SAT-LOA-20161115-00118, at 11-12 (June.
     26, 2017).
37
     OneWeb Petition at 20.
38
     See, e.g., Consolidated Opposition and Reply Comments of OneWeb, IBFS File Nos. SAT-LOI-20170301-00031
     and SAT-AMD-20180104-00004, at 23-24 (Aug. 27, 2018) (asking the Commission to rely upon oversight by
     the U.K. regulator rather than providing orbital debris information); Consolidated Opposition and Reply
     Comments of OneWeb, IBFS File No. SAT-MOD-20180319-00022, at 22-23 (Aug. 27, 2018) (same).
39
     See SpaceX Authorization, ¶ 40r.




                                                     14


         OneWeb also argues that the Commission should not accept SpaceX’s updated orbital

debris showing until after the Orbital Debris NPRM proceeding has concluded. 40 But this is

inconsistent with Commission precedent. Rather than defer applications pending the completion

of a rulemaking proceeding, the Commission routinely grants them subject to any new policies or

rules that it may adopt. That is exactly what the Commission did with respect to SpaceX’s original

application – and OneWeb’s as well. 41 The Commission’s policy wisely enables satellite operators

to proceed with development of their specific systems while more general issues that affect the

entire satellite industry are debated and resolved in the larger context of a proceeding to adopt rules

for everyone – rules that, once adopted, will be applied to all satellite operators. Any other

approach would open the door to mischief by competitors and make the regulatory burden on

deploying new services nearly insurmountable. Thus, OneWeb’s request for deferral while that

larger debate takes place stands Commission precedent on its head, and should be rejected.

         Finally, OneWeb cites rumors and unnamed sources as the basis for concern that SpaceX

will use the altitudes above the International Space Station (“ISS”) as a “testbed” for spacecraft

design. As the company planning to fly NASA astronauts to the ISS this year and with numerous

successful cargo missions to the ISS already completed, SpaceX welcomes OneWeb’s attention to

the safety of the ISS and its crew and operations. The future of crewed spaceflight and the safety

of astronauts en route to and aboard the space station are SpaceX’s top priority, which is why

SpaceX continues to collaborate closely with NASA on ISS and crew safety issues, including safe

operation for the ISS with the modified SpaceX constellation.




40
     See OneWeb Petition at 22.
41
     SpaceX Authorization, ¶ 17; OneWeb Authorization, ¶ 12.



                                                      15


            OneWeb’s criticism of SpaceX’s use of rigorous iteration to improve its satellites is

particularly surprising given OneWeb’s embrace of frequent changes to its own system. In the

past year alone, OneWeb has announced plans to increase threefold the size of its constellation to

1,920, 42 then to shrink its initial rollout by 300 satellites, 43 using a testbed of 600 satellites that

operate at what it admits is only 2% of the throughput of its next generation. 44 In contrast, by

continuing to proceed deliberately and incrementally, SpaceX has made a single modification that

will permit expedited launch of highly capable satellites in the coming months, while OneWeb

reduced its initial launch payload by 40% out of concern that its initial satellites will face in-orbit

anomalies. 45 Overall, SpaceX’s integrated, iterative approach will better serve the public interest

by quickly bringing high-speed broadband service to American consumers.

     III.      THE COMMISSION IS FULLY CAPABLE OF MAKING ITS OWN INITIAL
               DETERMINATION WITH RESPECT TO SPACEX’S COMPLIANCE WITH EPFD
               LIMITATIONS

            The Commission conditioned SpaceX’s authorization on receipt, prior to initiation of

service, of a “favorable” or “qualified favorable” finding by the ITU Radiocommunication Bureau

regarding its compliance with those EPFD limits.46 As required by Commission rules, SpaceX



42
     See Application for Modification of WorldVu Satellites Limited, IBFS File No. SAT-MOD-20180319-00022
     (Mar. 19, 2018) (seeking to increase the number of active satellites in its LEO Constellation from 720 to 1,980).
43
     See Caleb Henry, Oneweb Scales Back Baseline Constellation By 300 Satellites, SPACENEWS (Dec. 13, 2018),
     available at https://spacenews.com/oneweb-scales-back-constellation-by-300-satellites/.
44
     Greg Wyler, Founder and CEO of OneWeb (@greg_wyler), TWITTER (Jan. 23, 2019, 8:38 PM),
     https://twitter.com/greg wyler/status/1088294875655782401 (“In phase 1 we launch the satellites needed to
     achieve global coverage. Currently set at 600 satellites. We then continue to launch up to 900 of this gen1 while
     we finalize our gen2 design, prepare and validate the supply chains and build the tooling and manufacturing
     lines… before launching Gen2. The Gen2 satellites will have at least 50x more throughput than Gen1, and likely
     take us through 1980 satellites.”)
45
     See,     e.g.,    Greg     Wyler,     (@greg_wyler),  TWITTER     (Jan.   18,    2019,    7:29     AM),
     https://twitter.com/greg wyler/status/1086284451087351809 (“Keeping 4 as spares gives us optionality and
     schedule safety in case of an anomoly [sic].”).
46
     See SpaceX Authorization, ¶ 40n.




                                                         16


has certified that its NGSO constellation, as modified, will comply with the applicable EPFD limits

set forth in Article 22 of the ITU Radio Regulations, which have been incorporated by reference

into the Commission’s rules. 47 However, in light of its expedited deployment schedule and the

backlog of EPFD examination showings at the ITU, SpaceX requested a waiver of the condition

requiring a favorable ITU determination prior to initiating service. In support of that request,

SpaceX included the results of an EPFD analysis using ITU-approved software demonstrating

compliance with all applicable EPFD single entry validation limits in the Ku- and Ka-band

spectrum covered by its license. 48 SpaceX also provided the data files used for these analyses so

that the Commission and any other interested party could independently confirm these technical

findings.

         Despite all this evidence, OneWeb still frets that SpaceX’s waiver request is “based on

nothing more than a showing of impatience.” 49 Perhaps OneWeb simply overlooked the EPFD

compliance showing and underlying data submitted with the application. This analysis was

substantially similar to the one SpaceX supplied with its original application – an analysis that the

ITU has now confirmed with a favorable finding. 50 SpaceX’s sense of urgency reflects its

agreement with Chairman Pai that “[i]t really would be a game-changer for rural America if every

town in this country were connected.” 51




47
     See 47 C.F.R. § 25.146(a)(2).
48
     See SpaceX Modification, Technical Attachment, Annexes 1 and 2.
49
     OneWeb Petition at 23.
50
     See EPFD data and EPFD examination results, ITU, https://www.itu.int/ITU-R/go/space-epfd-data.
51
     See Marguerite Reardon, FCC Leaders Say We Need A 'National Mission' To Fix Rural Broadband, CNET
     (Oct. 24, 2018), available at https://www.cnet.com/news/fcc-leaders-say-we-need-a-national-mission-to-fix-
     rural-broadband/.




                                                        17


         As OneWeb recognizes, before the rules were changed in 2017, “the Commission required

a ‘comprehensive technical showing’ demonstrating EPFD compliance by NGSO FSS

applicants” 52 under a rule that had been in place since 2000. 53 Thus, it is curious for OneWeb to

characterize the ITU’s analysis as “the only substantive verification of [SpaceX’s] EPFD

compliance.” 54 As a company that chose to seek a U.S. license for its system, SpaceX is confident

that the Commission remains capable of performing its own analysis and reaching its own

conclusions about compliance with EPFD requirements, as it had done for over 15 years before

this rule change.

         SpaceX recognizes that it must comply with the ITU’s EPFD limits, has certified that its

constellation (as modified) will do so, and has provided the technical inputs for any party to

confirm this compliance. SpaceX has no objection to the proposal by SES/O3b that any waiver

granted in this proceeding relate only to the timing of the ITU finding, such that SpaceX may

proceed at its own risk pending ITU confirmation of a “favorable” or “qualified favorable”

finding. 55




52
     OneWeb Petition at 24 (citing 47 C.F.R. § 25.146(a)(2016)).
53
     See Amendment of Parts 2 and 25 of the Commission’s Rules to Permit Operation of NGSO FSS Systems Co-
     Frequency with GSO and Terrestrial Systems in the Ku-Band Frequency Range, 16 FCC Rcd. 4096 (2000).
54
     OneWeb Petition at 26.
55
     See SES/O3b Comments at 5.



                                                        18


                                       CONCLUSION

       There is no basis for deferring or denying SpaceX’s Modification Application.

Accordingly, the Commission should grant the Modification Application so that SpaceX can

proceed with its plans for expedited deployment of its NGSO constellation.

                                              Respectfully submitted,

                                              SPACE EXPLORATION HOLDINGS, LLC


                                              By: _/s/ Patricia Cooper ________
                                                  Patricia Cooper
 William M. Wiltshire                             Vice President of Satellite Government
 Paul Caritj                                       Affairs
 HARRIS, WILTSHIRE & GRANNIS LLP                  David Goldman, Director, Satellite
 1919 M Street, N.W.                               Policy
 Suite 800
 Washington, DC 20036                         SPACE EXPLORATION TECHNOLOGIES CORP.
 202-730-1300 tel                             1155 F Street, NW
 202-730-1301 fax                             Suite 475
                                              Washington, DC 20004
 Counsel to SpaceX                            202-649-2700 tel
                                              202-649-2701 fax

 February 21, 2019




                                              19


                                       ATTACHMENT A

         DYNAMIC INTERFERENCE ANALYSIS FOR ONEWEB AND O3B NGSO SYSTEMS

        In its initial application, SpaceX presented an analysis of the effect of the proposed
modification on downlink and uplink interference using the characteristics in the ITU filings of a
proposed NGSO system (IK-NGSO-A10K-1) operating in both the Ku- and Ka-bands. The
analysis considered the dynamic, time-varying interference expressed as a cumulative distribution
function (“CDF”) of the interference-to-noise ratio (“I/N”), for varying percentages of time. The
I/N CDF was derived from a time-domain simulation of the two NGSO systems over a long enough
time to produce meaningful statistics. To present a worst-case assessment of the interference
environment, the analysis also assumed that the two systems did not implement any interference
mitigation strategies.

        WorldVu Satellites Limited (“OneWeb”) and SES Americom Inc. and O3b Limited
(“SES/O3b”) have criticized that analysis because it did not include a system involved in the
Commission’s recent Ku/Ka-band processing round. In order to address this criticism, below we
present a dynamic interference analysis to determine whether SpaceX’s constellation with the
proposed modification would increase interference to the NGSO systems operated by OneWeb (in
the Ku-band) and O3b (in the Ka-band). As before, the anlaysis examines both downlink and
uplink interference and compares the impact on these victim systems of the original SpaceX
constellation and the modified constellation.

        For purposes of this dynamic interference assesment, SpaceX makes several worst-case
assumptions. First, the earth stations of both the interfering and victim systems are assumed to be
collocated. Second, the collocated earth stations are assumed to be located at 50° N latitude, where
the largest number of SpaceX satellites from the proposed modified constellation will be visible.
Third, the simulation does not consider the effects of atmospheric attenuation.

        Most importantly, the analysis assumes that the SpaceX earth station is a gateway rather
than a user terminal. This is a worst-case assumption because SpaceX satellites can transmit only
one co-frequency, co-polar beam to a user terminal, but can transmit up to four such beams in the
Ku-band and up to eight such beams in the Ka-band. In addition, the analysis selects the four or
eight interfering SpaceX satellites (depending on opeational frequency band) with smallest off-
axis sepration angle from a given victim earth station to communicate with the collocated gateway
station at each time step.

        The methodology for both dynamic downlink and uplink interference assesment is
explained in detail below. As this analysis confirms, because the new interference levels resulting
with the modification are no worse (and often better) than the interference levels that would have
been experienced with the original constellation for all percentages of time, the modification will
not increase the potential interference into other NGSO systems.

Downlink:

       The analysis simulates downlink interference from the transmitting SpaceX satellites into
the O3b and OneWeb NGSO systems’ receiving earth stations. Higher gain antenna earth stations

                                               A-1


have been chosen from these systems for analysis to ensure high I/N. Consistent with the
parameters in their applications, the minimum elevation angles for SES-O3B and OneWeb
transmissions are 5° and 45°, respectively. Any SpaceX satellite in view meeting 0° and 10°
minimum elevation angle is eligible for analysis with respect to the O3b and OneWeb systems,
respectively. 56 For each possible pointing angle from the eligible victim satellite to victim earth
station, the following two types of interference are computed and aggregated:

     •   Mainbeam interference from worst case SpaceX satellites to victim earth station assuming
         the mainbeam from the interfering satellites are directed to collocated gateway station.
     •   Sidelobe inteference from the remaining visible interfering satellities to the victim earth
         station. Sidelobe EIRP from these remaining interfering satellities is assumed to be 30 dB
         lower on average than their corresponding maximum mainbeam EIRP.

The results of the analysis for a victim earth station of the O3b and OneWeb NGSO systems are
set forth in Figures 1 and 2, respectively. In each case, the figure plots a CDF of aggregate I/N
levels for the SpaceX constellation as originally proposed and as modified.




               Figure 1. Worst-Case Downlink Comparison for O3b Constellation




56
     Although the O3b and OneWeb systems observe minimum elevation angles of 5 and 45 degrees, respectively, the
     analysis can consider SpaceX satellites at lower elevation angles (0 and 10 degrees, respectively) for purposes of
     aggregating sidelobe interference.

                                                         A-2


          Figure 2. Worst-Case Downlink Comparison for OneWeb Constellation


        In the Ku-band, not all earth stations will be gateways. In fact, SpaceX intends to deploy
a very small number of Ku-band gateways (communicating with up to four satellites in a
frequency) and a very large number of user terminals (communicating with only one satellite in a
frequency). Moreover, even for a gateway station, it is highly unlikely that all worst-case satellites
with the smallest off-axis sepration angle from victim pointing will transmit at each time step.
Hence, the aggrgated I/N represents a worst-case downlink inteference scenario which is certain
to be improved in real deployment.

Uplink:

         The analysis simulates uplink interference from the transmitting SpaceX earth station into
the O3b and OneWeb NGSO systems’ receiving satellites. Again, higher gain antenna earth
stations have been chosen from the SpaceX system for analysis to ensure high I/N. The O3b and
OneWeb earth station can communicate with any satellite in its own system above a 5° and 45°
elevation angle, respectively. Similar to the downlink methology, the analysis presents a worst
case by selecting SpaceX satellites with the smallest off-axis sepration angle from a given victim
satellite for uplink beams from the collocated gateway station at each time step. For each possible
pointing angle from the victim earth station to eligible victim satellite, the following two types of
interference are computed and aggregated:

   •   Mainbeam interference from SpaceX gateway earth station to victim satellite assuming the
       mainbeams from the interfering gateway station are directed to worst case satellites.
   •   Sidelobe inteference from adjacent earth stations to victim satellite. The anlaysis
       aggregates contributions from adjacent earth stations located within a square (with the
       collocated gateway station at the center) with area equal to 100 times the size of a SpaceX

                                                A-3


       cell. Sidelobe EIRP from adjacent earth stations is assumed to be 30 dB lower on average
       than their corresponding maximum mainbeam EIRP.

The results of the analysis for victim satellites of the O3b and OneWeb NGSO systems are set
forth in Figures 3 and 4, respectively. In each case, the figure plots a CDF of aggregate I/N levels
for the SpaceX constellation as originally proposed and as modified.




              Figure 3. Worst-Case Uplink Comparison for O3b Constellation




                                                A-4


    Figure 4. Worst-Case Uplink Comparison for OneWeb Constellation

         Again, in a real deployment, it is highly unlikely that the SpaceX earth station will
transmit to all worst-case satellites with the smallest off-axis sepration angle from a victim
satellite at each time step. Hence, the aggrgated I/N represents a worst-case uplink
inteference scenario which is certain to be improved in practice.




                                         A-5


                             ENGINEERING CERTIFICATION


       I hereby certify that I am the technically qualified person responsible for preparation of the

engineering information contained in this pleading, that I am familiar with Part 25 of the

Commission’s rules, that I have either prepared or reviewed the engineering information submitted

in this pleading, and that it is complete and accurate to the best of my knowledge and belief.



                                              /s/ Mihai Albulet
                                              Mihai Albulet, PhD
                                              Principal RF Engineer
                                              SPACE EXPLORATION TECHNOLOGIES CORP.


                                              February 21, 2019
                                              Date


                                CERTIFICATE OF SERVICE

       I hereby certify that, on this 21st day of February, 2019, a copy of the foregoing pleading

was served via First Class mail upon:

                      Mariah Dodson Shuman
                      Head of Regulatory Affairs
                      WorldVu Satellites Limited
                      1785 Greensboro Station Place, Tower 3
                      McLean, VA 22102

                      Brian Weimer
                      Douglas Svor
                      Samuel Swoyer
                      Sheppard Mullin Richter & Hampton LLP
                      2099 Pennsylvania Avenue, N.W.
                      Suite 100
                      Washington, DC 20006

                      Suzanne Malloy
                      Petra A. Vorwig
                      Noah Cherry
                      SES Americom, Inc./O3b Limited
                      1129 20th Street, N.W.
                      Suite 1000
                      Washington, DC 20036

                      Karis A. Hastings
                      SatCom Law LLC
                      1317 F Street, N.W.
                      Suite 400
                      Washington, DC 20004



                                                     /s/ Samuel D. Sperling
                                                     Samuel D. Sperling



Document Created: 2019-04-26 03:38:25
Document Modified: 2019-04-26 03:38:25

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC