                                         BEFORE THE

          Federal Communications Commission
                             WASHINGTON, D.C. 20554



In re the Matter of                           )
                                              )
Hughes Network Systems, LLC                   )      File No. SES-MOD-______________
                                              )
Application to Modify Letter of Intent        )      Call Sign S2834
To Access the U.S. Market from                )
The 97.1º W.L. Orbital Location               )



                  SPACE STATION MODIFICATION APPLICATION

        Hughes Network Systems, LLC (“Hughes”), pursuant to Section 25.117 of the

Commission’s Rules (47 C.F.R. § 25.117), hereby submits this application to modify its

authorization to operate the JUPITER-97W satellite network at the 97.1 West longitude

(“W.L.”) orbital location.1 In this modification application, Hughes revises its technical

proposal for the satellite to correspond to the design of the JUPITER-97W satellite that is

under physical construction. In particular, Hughes provides additional information concerning

its proposed gateway architecture, including the addition of the Local Multipoint Distribution

Service (“LMDS”) frequencies; details of its tracking, telemetry and command (“TT&C”)

operations; a revised power-flux density compliance showing; and an updated two-degree

spacing and non-geostationary satellite network compatibility showing. This modification also

proposes to update the ITU filing associated with the satellite. 2 With the exception of the


1
    See IBFS File Number SAT-LOI-20110809-00148.
2
  The original application (see footnote 1) indicated that the JUPITER-97W satellite would
operate under the International Telecommunication Union (“ITU”) satellite orbital filing


                                             -2-


updated information provided herein, Hughes certifies that its satellite design remains

materially unchanged from its current Letter of Intent authorization.


I.     GENERAL DESCRIPTION AND SERVICES TO BE PROVIDED

       The Ka band capacity on JUPITER-97W will expand Hughes’ capacity for broadband

service by satellite in North America, including the United States. Following the successful

launch of EchoStar XVII in 2011, Hughes has deployed over 1,000,000 broadband terminals

throughout the United States and Canada and demand keeps increasing.3 This increasing

demand and need for high-speed broadband service demonstrates that there is an ample

market for additional capacity for the types of services that Hughes provides.4 These services

include high-speed data transmission and high-speed broadband Internet access, which can

be used to support internet and content-provider offerings such as high definition video

programming, on-demand entertainment, digital music, interactive television, video

conferencing and high capacity two-way communications. Areas of the United States, as

well as Canada, Columbia, Costa Rica, Cuba,5 Mexico, Panama, and Venezuela that are

currently underserved or unserved by terrestrial broadband technologies will benefit from the

availability of this proposed new space segment capacity. Provision of broadband service to



designated as UKSAT-13, which was submitted to the ITU by the administration of the
United Kingdom. This orbital filing expired on 6/1/2014.
3
 Press Release, “Hughes Becomes First Satellite Internet Provider to Surpass One Million
Active Users,” Hughes Network Systems, LLC released on September 8, 2014.
4
 Press release, “Hughes to Highlight Growth in High Throughput Satellite Technology at
CSAT 2014 Conference,” Hughes Network System, LLC released on September 8, 2014.
5
  Under revised guidelines, issued in early 2010, U.S. satellite service providers may offer
services to end users in Cuba. See FCC Public Notice, “Modification of Process to Accept
Applications for Service to Cuba and Related Matters,” 25 FCC Rcd 436, DA-112 (IB,
released Jan. 21, 2010).


                                                 -3-


these areas will promote regional commerce while providing new job opportunities in the

United States through the construction of the satellite, the development of applications and

content for consumers, as well as the manufacturing of the gateway and user terminals. The

additional high-speed capacity will improve communications links in rural and underserved

areas, create new opportunities for economic development in the Western Hemisphere, and

foster greater regional cooperation.

       A. Space Segment

       The JUPITER-97W satellite will operate at the 97.1° W.L. orbital location and will

provide broadband service in several countries. The Ka band payload will incorporate state-

of-the-art engineering to achieve enhanced flexibility of service offerings. It will consist of

139 User Beams covering portions of Canada, Columbia, Costa Rica, Cuba, Mexico,

Panama, the United States and Venezuela. The satellite will also have 22 Gateway Beams

that will be oriented towards Canada, Mexico and the United States. With this new satellite,

Hughes will be bringing an additional 150 GBPS of capacity for broadband services to the

Americas, essentially doubling Hughes available capacity for consumer broadband and

greatly increasing available capacity overall.

       B. Ground Segment

       1.      Gateway Earth Stations (“GES”): Up to 22 Gateway Earth Stations will be

deployed in order to receive signals from users and to establish a terrestrial connection to the

internet. These 22 stations will have antennas of at least 5.6 meters in diameter in order to

provide sufficient robustness to interference and propagation effects.


                                              -4-


       2.       User Earth Stations (“UES”): Hughes customers served by the new Ka band

capacity will receive high-speed broadband services using UES that consist of a small-

diameter antenna mounted on the outside of their premises and a small indoor modem.

       3.       Telemetry, Tracking and Commanding Earth Station (“TT&C”): Hughes

will install two TT&C stations in Cheyenne, WY and Gilbert AZ to control the satellite. In

addition, four Radio Frequency Auto Tracking (“RFAT”) stations will be installed to

maintain the correct pointing of the satellite towards Earth.

       C. Spectrum Usage

       The Hughes Ka band GES will operate using the frequencies detailed in the Table 1

below for uplink (Earth-to-space) and downlink (space-to-Earth) operations. The UES will

operate using the frequencies detailed in the Table 2 below for uplink (Earth-to-space) and

downlink (space-to-Earth) operations. The additional frequency band for which authority is

sought via this modification application is highlighted in Table 1 below.




                                  Table 1 - Gateway Beams

Frequency Band                                                        US Allocation
                                   Function
    (GHz)
   27.85-28.35                  Gateway Uplink                       LMDS Primary
   28.35-28.6                   Gateway Uplink                      FSS GSO Primary
    28.6-29.1                   Gateway Uplink                     NGSO FSS Primary
   29.25-30.0                   Gateway Uplink                      FSS GSO Primary
    18.3-18.8                 Gateway Downlink                      FSS GSO Primary
    18.8-19.3                 Gateway Downlink                     NGSO FSS Primary
    19.7-20.2                 Gateway Downlink                      FSS GSO Primary


                                               -5-




                                     Table 2 – User Beams

Frequency Band                                                          US Allocation
                                    Function
    (GHz)
      29.25-30.0                User Beam Uplink                      FSS GSO Primary
      18.3-18.8               User Beam Downlink                      FSS GSO Primary
      18.8-19.3               User Beam Downlink                      NGSO FSS Primary
      19.7-20.2               User Beam Downlink                      FSS GSO Primary


         This proposed modification to the JUPITER-97W authorization requests the inclusion

of the frequency band 27.85-28.35 GHz, which was not part of the original application. This

frequency band is allocated to the Local Multipoint Distribution Service (LMDS) on a

primary basis and to the FSS on a secondary basis. Accordingly, in order to protect LMDS,

Hughes proposes to limit its operation in this band in the United States to a total of seventeen

GES which will transmit on a non-interference basis with respect to the LMDS. Hughes has

ensured that a Prior Coordination Notice was sent to all potentially impacted LMDS

licensees in proximity to the GES to ensure that they are aware of the proposed deployment.

No LMDS licensee has provided comment indicating any concern relative to the proposed

deployment.6

         An analysis was also conducted demonstrating the interference levels that LMDS

terminals may receive from nearby GES. The results of the study are attached to the




6
    See Comsearch Report attached as Exhibit E to this application.


                                              -6-


technical exhibit provided with this application as Exhibit E. These results show that the

impact to the LMDS is limited to the immediate vicinity of the GES.

         As this application for modification requests the use of an additional frequency band

beyond those currently authorized, the Commission’s Rules require that the application be

considered as a major modification to the existing authority and placed in the space station

processing queue pursuant to Section 25.158 of the Commission’s Rules.7 Nonetheless, as

there are presently no other applicants ahead of Hughes in the processing queue requesting

authority to make use of the frequency band 27.85-28.35 GHz at the nominal 97 W.L.

orbital location, the Commission can grant Hughes’ request for access to the additional

spectrum without delay.

         D. Launch

         The JUPITER-97W satellite will be authorized for launch by the administration of

Papua New Guinea through its National Information and Communication Technology

Authority (“NICTA”), which regulates the telecommunications sector. Papua New Guinea is

in the process of accession to the United Nations Convention on Registration of Objects

Launched into Outer Space and will comply fully with the orbital registration requirements

of the UN Office for Outer Space Affairs before the launch of JUPITER-97W. Papua New

Guinea has already ratified the Convention on International Liability for Damage Caused by

Space Objects.8 NICTA has agreed with Hughes that it will assume liability for the Jupiter-

97W satellite. Hughes has agreed to obtain third party liability insurance to compensate

NICTA in the event of a claim relating to Jupiter-97W.
7
    See 47 CFR 25.117(d)(2)(iii)
8
 See United Nations Office for Outer Space Affairs, Latest Depository Notifications.
http://www.oosa.unvienna.org/oosa/en/SpaceLaw/treatystatus/index.html


                                              -7-


       E. Grant of this Modification Application Will Serve the Public Interest.

       Hughes currently operates two high-throughput Ka band FSS satellites, SPACEWAY

3 (Call Sign S2663), which entered commercial service on April 3, 2008 at 94.95 W.L., and

EchoStar XVII (Call Sign S2753), which began operations on October 1, 2012 at 107.1°

W.L. The new JUPITER-97W satellite will offer significant additional capacity to meet the

broadband needs of business and residential users in North America, delivering such high

demand services as HD video programming, on-demand entertainment, digital music,

interactive television, video conferencing and high capacity two-way communications.

       The addition of JUPITER-97W will also allow Hughes to provide satellite broadband

connectivity in new markets. With the advanced and flexible design of this satellite payload,

Hughes will expand its footprint in the Americas, and provide broader coverage to a wider

range of users that to date have not benefitted from access to satellite broadband.

       In addition, the availability of this additional space segment capacity will promote

creation of new information and communications technology jobs within the United States

related to the construction of the satellite by SS Loral, the operation of the multiple gateway

earth station facilities as well as for the manufacture of remote user terminals that are

produced in the United States.


II.    HUGHES SATISFIES THE COMMISSION’S CRITERIA UNDER
       DISCO II FOR ACCESS TO THE U.S. MARKET – 47 C.F.R. § 25.137(a)

       The Commission’s DISCO II framework applies to this application because the

JUPITER-97W satellite is now to be licensed under authority of the government of Papua


                                              -8-


New Guinea, and the services will be provided in a variety of countries.9 Papua New Guinea

is a member of the World Trade Organization (“WTO”) 10 which, as described below,

establishes a rebuttable presumption that U.S. market entry is in the public interest. The

DISCO II analysis includes consideration of several factors, such as the effect on competition

in the United States, spectrum availability, eligibility requirements, technical requirements,

national security, law enforcement, foreign policy and trade concerns.11 Each of these factors

supports grant of this application, as detailed below.

          A. Positive Effect on Competition in the United States

          In DISCO II, the Commission established a rebuttable presumption that market entry

to provide services covered by the U.S. commitments under the WTO Basic Agreement on

Telecommunications using a non-U.S. satellite authorized by a WTO Member

Administration will further competition in the United States, whether such access is sought

via a Letter of Intent or through an earth station application.12 Papua New Guinea is a

member of the WTO, and Hughes seeks to use the space segment capacity to be accessed via

this modification to provide satellite services that are covered by the WTO Basic Agreement

on Telecommunications. Accordingly, the presumption in favor of entry applies to this

application.

9
 Amendment of the Commission’s Regulatory Policies to Allow Non-U.S. Licensed Satellites
Providing Domestic and International Service in the United States, Report and Order, 12
FCC Rcd 24094, 24107-17(¶¶ 30-49) (1997) (“DISCO II”).
10
   Papua New Guinea has been a member of WTO since June 9, 1996. See
http://www.wto.org/english/thewto_e/countries_e/papua_new_guinea_e.htm (visited
3/27/2014).
11
  See e.g., Telesat Canada, Petition for Declaratory Ruling for Inclusion of Anik F2 on the
Permitted Space Station List, Petition for Declaratory Ruling to Serve the U.S. Market Using
Ka band Capacity on Anik F2, Order, 17 FCC Rcd 25287, 25290 (¶ 6) (2002).
12
     DISCO II at 24112 (¶ 39); see also 47 C.F.R. § 25.137(a)(2).


                                               -9-


         Allowing Hughes to operate JUPITER-97W in the United States is consistent with the

intent of the WTO Basic Agreement on Telecommunications to facilitate fair and open

competition in satellite communications services, and provide equivalent opportunities to

access facilities in the U.S. market for satellites licensed in countries that allow U.S.-licensed

satellites to access their domestic markets. Grant of this application will enhance

competition in the satellite services marketplace by permitting Hughes to introduce new

satellite broadband services to additional areas, thereby stimulating lower rates, improved

service quality, increased service options, and greater technological innovation. The

Commission consistently has relied favorably on these same public interest benefits in

granting similar requests.13

         B. Spectrum Availability

         This application proposes to access the Ka band capacity on JUPITER-97W at 97.1°

W.L. for GES and UES operations using frequency bands designated for primary

geostationary (“GSO”) FSS use, as well as those segments designated for primary non-

geostationary (“NGSO”) FSS and LMDS use in the United States. Hughes has already been

granted authority to access the NGSO band and use under this modification will be consistent

with this authorization.

         In addition, through this modification application, Hughes seeks access in the uplink

direction to the 27.85-28.35 GHz band that is designated in the United States for primary use

by the LMDS – an application in the fixed service.14 As discussed, Hughes’s operation of

these additional Ka band links in the United States will be on a secondary, non-harmful
13
  See, e.g., Digital Broadband Applications Corp., 18 FCC Rcd 9455 (2003); Pegasus
Development Corp., 19 FCC Rcd 6080 (2004).
14
     See also discussion of Spectrum Utilization in Section IV.H., below.


                                             - 10 -


interference basis to LMDS. As outlined herein, Hughes proposes to operate seventeen GES

terminals in locations set at sufficient distance from the urban centers where LMDS

operations typically occur. These terminals will avoid causing harmful interference to

LMDS systems by minimizing energy transmitted toward the horizon, with additional

shielding used if required, as outlined in the Technical Annex.15 Hughes does not claim

protection from any harmful interference that may be caused by LMDS systems.

Accordingly, Hughes’ proposed limited use of the LMDS spectrum for secondary U.S. GSO

FSS uplink operations is fully consistent with Commission policy.16

         As is shown in the Technical Annex to this application, Hughes’s proposal is fully

compliant with the Commission’s two-degree spacing requirements, will not cause harmful

interference to any other authorized user of the spectrum, and is compatible with future Ka

band assignments pursuant to the FCC’s Rules. Therefore, this request is fully consistent

with the procedures set forth by the Commission in the Space Station Licensing Reform

Order regarding processing of GSO-like services.17




15
     See Technical Annex, Section A.9 at 13-24.
16
   See Amendment of Parts 1, 2, 21, and 25 of the Commission's Rules to Redesignate the
27.5-29.5 GHz Frequency Band, To Reallocate the 29.5-30.0 GHz Frequency Band, To
Establish Rules and Policies for Local Multipoint Distribution Service and for Fixed Satellite
Services, Third Report and Order, 12 FCC Rcd 22310, 22327 (¶ 42) (1997) and Third Notice
of Proposed Rulemaking, 11 FCC Rcd 53, 71(¶ 47) (1995) (designating the band 27.5–28.35
GHz for LMDS on a primary basis, and stating that GSO FSS operations in the band will be
permitted on a non-interference basis for the purpose of providing limited gateway-type
services). See also 47 C.F.R. § 25.202(a)(1).
17
  See Amendment of the Commission’s Space Station Licensing Rules and Policies, First
Report and Order and Further Notice of Proposed Rulemaking, 18 FCC Rcd 10760, 10806
(¶113) (2003).


                                             - 11 -


               C. No National Security, Law Enforcement, or Public Safety Concerns

       Grant of this application is also consistent with U.S. national security, law

enforcement and public safety considerations. Hughes, a U.S. company, will only employ

the proposed U.S. gateways to provide end user service to customers in the United States. 18

Hughes will be responsible for all aspects of the design, construction and operation of the

JUPITER-97W satellite, and will have authority over the U.S. earth station network in order

to ensure prompt compliance with any national security or law enforcement requirements.



III.   REGULATORY COMPLIANCE MATTERS

       A. Legal Qualifications – 47 C.F.R. § 25.137(a)

       Hughes’ legal qualifications are set forth in this narrative and in the attached FCC

Form 312 (including all associated exhibits). Separately, this application and its associated

attachments include all of the information required for space station applicants in Section

25.114 of the Commission’s rules, except as noted below.19

       B. Technical Qualifications – 47 C.F.R. § 25.137(b)

       A complete Technical Annex and Schedule S for the Ka band payload are provided as

part of this application. Hughes’ plan for mitigation of orbital debris was included in its

initial application. There have been no substantive changes in this plan; however, the

Technical Annex included with this modification application includes a restatement of the



18
 All UES located in the U.S. will connect exclusively to a GES located in the U.S. Some
UES in Central and South America will also be connected to GES located in the U.S.
19
   See 47 C.F.R. § 25.114. Detailed information concerning Hughes’ ownership and its
officers and directors is provided in Exhibit D to the Form 312 associated with this
application.


                                             - 12 -


plan, as provided for under Section 25.114(d)(14) of the Commission’s Rules, with some

additional detail and explanation.20

         With respect to the additional spectrum in the 27.85-28.35 GHz band that Hughes

seeks to use on a secondary basis, operations on JUPITER-97W will be restricted to

reception of transmissions from the GES. As mentioned previously, a quantitative

demonstration of the capability to operate on a secondary, non-harmful interference basis

with the LMDS is provided in Section A.10 of the attachment to this document titled,

“Technical Information to Supplement Schedule S”.

         C. Posting of Performance Bond

         Following grant of the underlying space station authorization, Hughes posted a

performance bond of $3,000,000 pursuant to Section 25.165 of the Commission’s Rules.21

Hughes subsequently submitted documentation to the Commission demonstrating its timely

compliance the first and second milestones.22 These have been reviewed and accepted as

proof of satisfaction of the conditions on Hughes’ license with a consequential reduction of

the bond to $1,500,000.23


20
   See Technical Annex, Section A.10 at 24-27. See also 47 C.F.R. § 25.114(d)(14) &
§ 25.283.
21
     See 47 C.F.R. § 25.165.
22
   See Hughes’ Demonstration of Compliance with First Satellite Implementation Milestone,
File No. SAT-LOI- 20110809-00148, filed July 18, 2013; Hughes’ Demonstration Of
Compliance With Second Satellite Implementation Milestone – Critical Design Review,
SAT-LOI- 20110809-00148, filed July 24, 2014; and Letter from Jennifer A. Manner, Vice
President, Regulatory Affairs, Hughes, to Lynne Montgomery, Attorney Advisor,
International Bureau, FCC, File No. SAT-LOI-20110809-00148, dated September 11, 2014.
23
   See FCC Public Notice, “Policy Branch Information, Actions Taken,” Report No. SAT-
01044, DA No. 14-1443, at 2 (Sat. Div., released October 3, 2014) (announcing the
determination that Hughes had met the first two milestones for the satellite to be located at
97.1 W.L. and permitting Hughes to reduce its bond to $1,500,000).


                                            - 13 -


         D. Reporting Requirements

         Hughes will comply with all FCC reporting requirements that apply to Ka band GSO

FSS satellites.24

         E. Compliance with FCC Technical Regulations

         Hughes’s proposal is compliant with the Commission’s two-degree spacing

requirements both for the bands covered by Section 25.138 of the Commission’s Rules and

for the bands where LMDS and NGSO FSS are primary, which are not so covered.25 Planned

operations will not cause harmful interference to any other authorized user of the spectrum.

Except with regard to those requirements for which waivers are requested (see Section V,

below), Hughes’s network will comply fully with the applicable requirements of Part 25 of

the Commission’s Rules, including power flux-density requirements,26 full frequency re-use

requirements,27 and all operational requirements. Specific showings as to the applicable

elements are contained in this application and the included exhibits and attachments hereto.

         G. Spectrum Utilization

         Hughes seeks to expand its authority to make use of spectrum in the 27.85-28.35 GHz

band to support its gateway uplink operations on a secondary basis to the LMDS in the

United States. As explained above, Hughes’s use of spectrum in this band is consistent with

the Commission’s intended use of the secondary U.S. allocation for FSS in this band. The




24
     See, e.g., 47 C.F.R. § 25.145(f).
25
     See Technical Annex, Section A.7 at 5-7.
26
     See Technical Annex, Section A.6 at 3-4.
27
     See Technical Annex, Section A.11 at 27-28.


                                               - 14 -


Commission has previously authorized secondary gateway operations in these frequencies,

and has recognized that such operations may coexist with primary LMDS operations.


IV.     WAIVER REQUESTS

        Hughes requests the following waivers of the applicable Commission Rules with

which its Ka band space segment may not be fully compliant.

        A.      Section 25.210(i)(1) – Cross-Polarization Isolation

        Section 25.210(i)(1) of the Commission’s Rules provides that FSS space station

antennas must be designed to provide cross-polarization isolation (“XPI”) such that the ratio

of the on axis co-polar gain to the cross-polar gain of the antenna will be at least 30 dB

within its primary coverage area. As shown in the attached Technical Annex, Hughes’ Ka

band package on the JUPITER-97W satellite is expected to have a cross-polarization

shortfall for all user beams in both transmit and receive cases.28 Accordingly, Hughes

requests a waiver of this requirement. This disparity with the FCC requirement will have no

material adverse impact on the operation of adjacent satellite networks. The only situation

where the XPI performance of a satellite antenna could impact the interference between

satellite networks, or between satellite and terrestrial systems, is when the associated earth

station (or terrestrial terminal) has its antenna pointed directly at the interfering or interfered-

with satellite. Only then is the polarization purity of the earth station high enough for the XPI

of the satellite antenna to be a material factor on the interference level. In all interference

situations where the satellite is located at any angle away from the boresight of the earth

station/terrestrial terminal – which will account for all interference interaction between the

28
   See Technical Annex, Section A.11 at 27-28. The XPI will meet the 30 dB requirement
on gateway beams. The XPI may be as low as 21.5 dB for the user beams.


                                             - 15 -


JUPITER-97W network and other GSO networks or terrestrial systems – the poor XPI of the

earth station/terrestrial terminal will dominate the interference calculation. Therefore the

shortfall in XPI for the JUPITER-97W satellite antenna will have no impact on the

interference to or from other networks and systems. Further, Hughes will claim no more

protection from interference from other licensed spectrum users operating in accordance with

the Commission's rules than if its antennas were in compliance with Section 25.210(i) of the

FCC’s Rules. Grant of this waiver is therefore consistent with long-established precedent.29

Moreover, the Commission has recently proposed to eliminate this cross-polarization

isolation requirement in favor of allowing individual operators to make appropriate

arrangements through the coordination process.30 Under these circumstances, waiver of the

rule will serve the public interest by affording Hughes that same treatment as other similarly

situated licensees with no adverse impact on other service providers, and will be consistent

with the Commission’s recent proposal to eliminate this requirement.

       B.      Schedule S Flexibility

       Section 25.114(c)(4)(vii) of the FCC’s Rules now provides that geostationary FSS

applicants “with large numbers of identical fixed spot beams” may, in lieu of the more

extensive requirements of Section 25.114(c)(4)(vi), “provide the predicted antenna gain

contours for one transmit and receive antenna beam, together with … [a] map of the isolines


29
    See, e.g., EchoStar Satellite Operating Corporation, 21 FCC Rcd 14780, 14782-83 (¶¶ 7-
8) (2006) (waiving the cross-polarization isolation requirement because it was adopted “in an
environment where satellites were predominantly using analog transmissions,” “performance
of the downlink satellite antenna has only a second-order effect on the interference into the
neighboring system,” and for systems using digital transmission, non-compliance “should
have only a negligible increase in interference to adjacent satellites”).
30
   See Comprehensive Review of Licensing and Operating Rules for Satellite Services, FCC
14-142, at 52-53 (¶ 181) (released Sept. 30. 2014).


                                             - 16 -


formed by combining all of the spot beams into one or more composite beams.”31 Given the

complexity of the Jupiter 97W satellite, consisting of a total of 159 beams, certain

simplifications have been made in the preparation of the Schedule S pursuant to this rule.

Rather than providing individual GXT files for each beam, a single representative isoline

gain contour is provided for both the uplink and downlink which depicts the coverage area.

         Consistent with the composite nature of the antenna contours being provided, Hughes

is submitting in Table S7 of Schedule S sample antenna beam characteristics for the

representative beams, rather than repeating beam information for each individual beam. The

beam information provided in Table S7 reflects the maximum EIRP for the identical transmit

beams, and the maximum G/T and minimum saturation flux density for the identical receive

beams. This information, coupled with the composite isoline diagram showing the maximum

gain across the coverage area, provides Commission staff with the data necessary to analyze

compatibility with adjacent satellites while minimizing Schedule S filing burdens, which is

consistent with the streamlined approach adopted in the Commission’s 2013 Part 25 Reform

Order.32 Accordingly, to the extent required, Hughes respectfully requests a waiver of the

general requirements to provide individualized beam information under Sections

25.114(c)(4)(i), (ii) and (v) of the Commission’s Rules, allowing it to provide the composite

antenna beam characteristics in Table S7 in the same manner that Section 25.114(c)(4)(vii)

explicitly allows submission of composite antenna gain contours.



31
     Section 25.114(c)(4)(vii)(C).
32
  Comprehensive Review of Licensing and Operating Rules for Satellite Services, 28 FCC
Rcd 12403 (2013).


                                               - 17 -



                                   V.         CONCLUSION


       The modification proposed herein is fully compliant with FCC rules relating to

system performance, flexibility, service quality and spectrum efficiency, and will result in a

U.S.-owned satellite system offering more advanced broadband services to users throughout

its service area. Grant of authority to operate the network in the United States as modified

will promote international commerce with key allies, increase access to broadband

communications, and create new employment opportunities in the United States.

       Accordingly, Hughes urges the Commission to find that the public interest will be

served by grant of the requested Ka band gateway earth station license, permitting access to

the JUPITER-97W satellite at the nominal 97.1º W.L. orbital location.

                                        Respectfully submitted,

                                        HUGHES NETWORK SYSTEMS, LLC



                                        By:       s/ Jennifer A. Manner
                                               Jennifer A. Manner
                                               Vice President, Regulatory Affairs




                                                  s/ Steven Doiron
                                               Steven Doiron
                                               Senior Director, Regulatory Affairs
December 10, 2014


                         ENGINEERING CERTIFICATION


       I, Steven Doiron, hereby declare, under penalty of perjury, that the following
statements are true and correct to the best of my information and belief:

(i)     I am the technically qualified person responsible for the engineering information
        contained in the foregoing Application,


(ii)    I am familiar with Part 25 of the Commission's Rules, and

(iii)   I have either prepared or reviewed the engineering information contained in the
        foregoing Application and found it to be complete and accurate.




                                     By: ____________________________
                                           Steven Doiron
                                           Senior Director, Regulatory Affairs
                                           Hughes Network Systems, LLC


                                             Dated: December 10, 2014


           LIST OF ATTACHMENTS AND EXHIBITS TO APPLICATION


Attachment – Technical Information to Supplement Schedule S (including Link Budgets)


Exhibits to FCC Form 312 and Schedule S


       Exhibit A – Response to Question 24 (Frequency Bands Requested)


       Exhibit B – Response to Question 35 (Requests for Waiver)


       Exhibit C – Response to Question 36 (Qualifications)


       Exhibit D – Response to Question 40 (Ownership)


       Exhibit E – Comsearch Report regarding the band 27.85-28.35 GHz