In the Matter of                                         )
                                                         )
EchoStar Satellite Operating Corporation                 )                     File Nos. SAT-MOD-20140623-00074
                                                         )                     Call Sign: S2232
Application for Modification of License for the EchoStar )
6 Satellite to Extend Termination Date                   )




                                        ORDER AND AUTHORIZATION

    Adopted: May 4, 2015                                                   Released: May 5, 2015

By the Chief, International Bureau:

I. INTRODUCTION
          1.      With this Order, we grant the request of EchoStar Satellite Operating Corporation
(ESOC) to extend the term of its license for the EchoStar 6 satellite, operating at the 96.2º W.L. orbital
location using the 12.2-12.7 GHz (space-to-Earth) and 17.3-17.8 GHz (Earth-to-space) frequency bands,1
to January 31, 2019. We conclude that grant of the requested license modification is consistent with our
practices concerning granting extensions of license terms and will serve the public interest by continuing
to facilitate possible development of new services to the Atlantic Ocean region.
II. BACKGROUND
        2.     ESOC filed the application to extend its license term, which expired on August 11, 2014,
on June 19, 2014.2 The application was placed on public notice on July 25, 2014.3 Spectrum Five
opposed grant of the application.4 At the time of the public notice, EchoStar 6 was operating at the 96.2°

1
  EchoStar Satellite Operating Company, Order and Authorization, 29 FCC Rcd 9615 (Int’l. Bur 2014) (EchoStar
Grant Order). This action is without prejudice to any Commission action on Spectrum Five’s pending petition for
reconsideration of the EchoStar Grant Order (filed September 10, 2014). See also EchoStar Satellite Operating
Company, Order and Authorization, 28 FCC Rcd 4229 (Int’l. Bur 2013) (STA Grant), stay denied, 28 FCC Rcd
5475 (Int’l. Bur 2013) (Stay Denial), review denied, 28 FCC Rcd 10412 (2013) (STA Affirmance), appeal dismissed,
Spectrum Five LLC v. FCC, Nos. 13-1231 & 13-1232 (D.C. Cir. July 11, 2014).
2
  IBFS File No. SAT-MOD-20140623-00074. After August 11, 2014, ESOC operations at the 96.2º W.L. orbital
location are considered continuing operations and to the extent consistent with the terms of the EchoStar Grant
Order, are considered authorized. See 47 C.F.R. § 1.62; 5 U.S.C. § 558(c).
3
 See Policy Branch Information, Satellite Space Applications Accepted for Filing, Public Notice, Report No. SAT-
01030 (July 25, 2014).
4
  Spectrum Five did not file a pleading formally captioned as a petition to deny or opposition. However, we are
treating the Supplemental Opposition of Spectrum Five, filed July 15, 2014 (Supplemental Opposition), as an
opposition to this application. The Supplemental Opposition supplemented oppositions filed in connection with
other applications, but included the file number for this application in its caption, along with the file numbers of
other applications seeking authorization for EchoStar 6 operations, grant of which Spectrum Five also opposed. The
                                                                                                            (continued....)


                                    Federal Communications Commission                                   DA 15-507


W.L. orbital location under special temporary authority (STA) and a request for regular authority for such
operations was pending.5 Spectrum Five also opposed the application for regular authority based in part
on measurement data it submitted which indicated that EchoStar 6 was not operating consistent with the
authorized power levels specified in the STA. In the August 11, 2014 EchoStar Grant Order, we granted
regular authority, stating that we were not in a position at that time to definitively address the power level
issue, and instead would address it in the context of ESOC’s application to extend the license term for
EchoStar 6, or in any enforcement action.6 We concluded, however, that assuming there was a violation,
it would not justify finding ESOC unqualified to hold a license.7 On September 10, 2014, Spectrum Five
filed a petition for reconsideration of the EchoStar Grant Order.8 On September 29, 2014, ESOC
submitted its own test measurements, acknowledged errors that led to higher than predicted power levels
at points in the United States, and specified steps to ensure compliance with the EchoStar 6 satellite’s
authorized power limits. In the ensuing months, the parties filed additional pleadings, with Spectrum
Five raising questions, to which ESOC responded, about the credibility and adequacy of ESOC’s
explanation and the adequacy of its corrective actions with regards to power levels.9
III. DISCUSSION
         3.       The Commission and the Bureau in several previous Orders found that authority for
operations of the EchoStar 6 satellite at the 96.2º W.L. orbital location would serve the public interest and
is warranted.10 In reaching that conclusion, we examined the various objections raised by Spectrum Five,
and for the most part will not further address those issues in this Order. We do, however, further address
certain matters, including the matter of power levels, that the EchoStar Grant Order specifically
identified for further consideration in connection with this license term extension application.11
Consistent with our practice, we have also reviewed information concerning the “health” of the satellite to
determine whether it is and is likely to continue to be capable of utilizing its assigned frequencies, and of
completing end-of-life procedures for orbital debris mitigation, as required by FCC rules.12

(...continued from previous page)
Supplemental Opposition did not, however, include any arguments uniquely focused on the license extension
request.
5
 IBFS File Nos. SAT-MOD-20130227-00026, as amended by SAT-AMD-20130429-00063 and SAT-AMD-
20130613-00083.
6
    EchoStar Grant Order, 29 FCC Rcd at 9622, ¶ 19.
7
 We also made a similar finding that a violation of an STA condition concerning station-keeping was not
disqualifying. Id. n.41.
8
 Petition for Reconsideration and Request for Referral of the Petition to the Full Commission, IBFS File Nos. SAT-
MOD-20130227-00026, SAT-MOD-201406237-00074, SAT-AMD-20130429-00063, SAT-AMD-20130613-00083
(Sept. 10, 2014) (Spectrum Five Petition for Reconsideration).
9
 See, e.g. Spectrum Five Letter dated October 7, 2014; ESOC Letter dated November 6, 2014; Spectrum Five Letter
dated November 7, 2014; Spectrum Five Letter dated November 17, 2014; ESOC Letter dated November 20, 2014;
Spectrum Five Letter dated December 1, 2014; ESOC Letter dated December 3, 2014; ESOC Letter dated December
17, 2014; and Spectrum Five Letter dated January 5, 2015.
10
     See STA Grant, STA Affirmance, and EchoStar Grant Order.
11
     ESOC Grant Order, 29 FCC Rcd at 9621-22, ¶ 19.
12
   The license term for most space stations is 15 years. 47 C.F.R § 25.121. Many satellites continue to be capable of
operating at the end of the license term. Requests to extend the license term are processed as requests to modify the
license. See, e.g., DISH Operating LLC, IBFS File No. SAT-MOD-20120124-00011, granted Oct. 18, 2012
(extending 10-year license term of EchoStar 7 for ten years); Lightsquared Subsidiary LLC, IBFS File. No. SAT-
MOD-20111128-00228, granted March 22, 2012 (extending license term of MSAT-2 for one year).



                                                         2


                                     Federal Communications Commission                                  DA 15-507


        4.       Radiated Power Levels and Antenna Pointing. In response to ESOC’s request for
operations at the 96.2º W.L. orbital location, Spectrum Five argues that the measured power levels exceed
the levels authorized in the STA Grant.13 ESOC concedes that, based upon actual test measurements and
analysis conducted between August 18 and September 29, the measured equivalent isotropically radiated
power (“EIRP”) did not match the predicted EIRP, and determined that its initial analysis contained the
following two errors: (i) the expected output back-off apparently was not achieved;14 and (ii) the antenna
apparently was pointed more north and west than expected.15
         5.       ESOC reported that on September 10, 2014, it reduced EchoStar 6’s EIRP level.16 ESOC
also reported that on October 1, 2014, it completed operations to repoint the EchoStar 6 antenna to match
the satellite coverage pattern as filed with the FCC.17 ESOC stated that other potentially affected satellite
operators, including DIRECTV, were apprised of EchoStar 6’s power levels and to date have not reported
any interference issues to ESOC.18 Further, ESOC initiated an audit across its fleet in order to confirm no
similar situations exist.19 Based upon the foregoing, ESOC believes that EchoStar 6 is in compliance with
applicable power limits and that appropriate measures have been taken to ensure continued compliance
with respect to ESOC’s satellite fleet.20
        6.      We find that ESOC has taken sufficient steps to rectify the problems identified by
Spectrum Five. Further, while the EIRP level errors could give rise to enforcement actions, these errors
do not warrant denial of a license extension.21
        7.      Health of Echostar 6. In the EchoStar Grant Order, we stated that questions concerning
the adequacy of current fuel levels with respect to the extended license term ESOC requests would be
addressed in connection with this application.22 As noted in that Order, Spectrum Five’s allegations rely

13
  See, e.g., Supplemental Opposition of Spectrum Five (dated July 25, 2014); Spectrum Five Letter dated August 6,
2014; Spectrum Five Letter dated November 17, 2014; Spectrum Five Letter dated December 1, 2014.
14
  ESOC states that the output back-off error is the result of payload performance not matching predictions,
specifically the achieved level of EIRP back-off versus the commanded level of EIRP back-off at very high back-off
levels. ESOC Letter dated September 29, 2014, at 2.
15
     Id. See also ESOC Letter dated December 17, 2014, at 3.
16
   ESOC Letter dated September 29, 2014. On October 1, 2014, ESOC conducted additional test measurements
under proper reference conditions, which confirm that EchoStar 6’s EIRP level is at least 1 dB below applicable
coordinated power limits. ESOC Letter dated November 20, 2014, at 2, and ESOC Letter dated December 17, 2014,
at 3.
17
  ESOC Letter dated November 20, at 3. ESOC explained that the incorrect antenna pointing is the result of
compounding errors and circumstances, exacerbated by the history of multiple owners/operators of this spacecraft
over its lifetime and by certain antenna alignment details, which are necessary to correctly position the antenna
patterns, and which were omitted from the spacecraft operators’ handbook.
18
     ESOC Letter dated November 20, 2014, at 3; and ESOC Letter dated December 17, 2014, at 3.
19
     ESOC Letter dated November 20, 2014, at 3.
20
     Id.
21
  We stated in the EchoStar Grant Order, even if ESOC has operated EchoStar 6 at unauthorized power levels, such
a violation would not rise to the level of seriousness to warrant a finding that ESOC is technically or legally
unqualified to hold a Commission license. EchoStar Grant Order, 29 FCC Rcd at 9622, ¶ 19, n.43. Spectrum Five
questions this finding in its petition for reconsideration of the EchoStar Grant Order. This Order is not intended to
prejudge Spectrum Five’s petition. In this Order, we find only that ESOC has taken steps sufficient to rectify the
problems identified by Spectrum Five.
22
     Id. at 9618-19, ¶ 9, n.21.




                                                         3


                                      Federal Communications Commission                                   DA 15-507


primarily on satellite lifetime estimates by ESOC made prior to commencement of fuel-saving inclined
orbit operations, or on speculation concerning the amount of fuel expended in satellite maneuvers.23 On
December 3, 2014, ESOC updated its report on the status of EchoStar 6.24 ESOC reported that the current
estimated End-Of-Life (EOL) of EchoStar 6 is February 2019, based on current fuel consumption. This
EOL estimate includes fuel for disposal of the spacecraft consistent with the requirements of FCC rules.25
Spectrum Five also speculated that EchoStar 6 may be incapable of conducting the continuous antenna
adjustments necessary to “maintain a stationary spacecraft antenna pattern” in compliance with Section
25.280(b)(1) of the Commission’s rules.26 ESOC responded that EchoStar 6’s attitude control system
automatically compensates for inclination.27 We have no factual basis to question ESOC’s statements
concerning these material facts. We will continue to monitor the status of EchoStar 6 operations through
annual reports during the remaining license term.28

V. CONCLUSION AND ORDERING CLAUSES
       8.       Based on the foregoing, we conclude that a grant of this request to extend the term of the
EchoStar 6 satellite would serve the public interest.
        9.       Accordingly, IT IS ORDERED that ESOC’s application for a license modification to
extend the term of its license through January 31, 2019, File No. SAT- SAT-MOD-20140623-00074 IS
GRANTED, and ESOC is authorized to operate the EchoStar 6 satellite (Call Sign S2232) in the 12.2-
12.7 GHz (space-to-Earth) and 17.3-17.8 GHz (Earth-to-space) frequency bands at the 96.2º W.L. orbital
location, with Telemetry, Tracking, and Command using the following center frequencies: 17.305 GHz
(Earth to space), and 12.203 GHz and 12.204 GHz (space to Earth). Operations under this authorization
must be in accordance with the technical specifications set forth in ESOC’s application and the following
conditions:
               a. All operations under this authorization are on an unprotected and non-harmful interference
                  basis, i.e., the EchoStar 6 space station shall not cause harmful interference to, and shall not
                  claim protection from interference caused to it by, any other lawfully operating station. In
                  the event of any harmful interference, ESOC shall cease operations immediately upon
                  notification of such interference, and shall inform the Commission, in writing, immediately
                  of such an event.
               b. While at the 96.2º W.L. orbital location, ESOC must maintain the EchoStar 6 spacecraft
                  with an east/west longitudinal station-keeping tolerance of +/- 0.05 degrees.
               c. Operations with earth stations located in the land area of the United States shall be limited

23
     Id. at ¶ 9.
24
  See ESOC Letter dated December 3, 2014, at 2. Over its life, EchoStar 6 has experienced solar array string
failures resulting in a 22.7% reduction in solar array power. Id. at 3. The EchoStar 6 batteries have had no cell
failures. Id. The EchoStar 6 power subsystem has had no failures. Id. EchoStar 6 has had five transponder
failures; backup travelling wave tube amplifiers have replaced these failed transponders. Id. at 4.
25
     Id. Attachment at 2.
26
 47 C.F.R. § 25.280(b)(1). See Spectrum Five Letter dated October 7, 2014, at 5; Spectrum Five Letter dated
December 1, 2014, at 5.
27
     ESOC Letter dated March 20, 2015.
28
  In the EchoStar Grant Order, we stated that we were considering EchoStar 6 operations as Fixed Satellite Service
and Mobile Satellite Service. This classification triggers annual reporting under Section 25.170 of the rules, which
require annual reporting of any space station not performing to specifications.




                                                          4


                                Federal Communications Commission                            DA 15-507


              to FSS uplink and Telemetry, Tracking, and Command operations using three stations.
        10.     This Order and Authorization is issued without prejudice to any future enforcement
action concerning the possible operation of the EchoStar 6 satellite at unauthorized power levels.
        11.     This Order and Authorization is issued pursuant to Section 0.261 of the Commission’s
rules on delegated authority, 47 C.F.R. § 0.261, and is effective on release.


                                                FEDERAL COMMUNICATIONS COMMISSION




                                                Mindel De La Torre
                                                Chief, International Bureau




                                                   5



Document Created: 2015-05-05 14:14:23
Document Modified: 2015-05-05 14:14:23

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC