Attachment redacted

redacted

OTHER submitted by Star One

redacted

2007-08-07

This document pretains to SAT-MOD-20051014-00200 for Modification on a Satellite Space Stations filing.

IBFS_SATMOD2005101400200_585261

                                  STEPTOE&JOHNSONw
                                           ATTORNEYS      AT    LAW


Daniel C.H. Mah                                                                  1330 Connecticut Avenue, NW
202.429.6414                                                                      Washington, DC 20036—1795
dmah@steptoe.com                                                                            Tel 2024293000
                                                                                            Fax 202.429.3902
                                                                                                 steptoe.com




                                EXPEDITED ACTION REQUESTED

   August 7, 2007


   Marlene H. Dortch
   Secretary
   Federal Communications Commission
   455 12th Street, S.W.
   Washington, D.C. 20554

   Re:     Star One S.A.
           File Nos. SAT—PPL—20050708—00144, SAT—MOD—20051014—00200, SAT—AMD—
           20051118—00223; Call Sign $2678

   Dear Ms. Dortch:

                   Star One S.A. ("Star One"), in accordance with Section 25.164(c) of the Rules,‘
   hereby submits a public version of a certification that the milestones for Critical Design Review
   ("CDR") and commencement of physical construction of the Star One C2 satellite have been
   met," Specifically, the attachments to the certification have been redacted. An unredacted
   version of the certification is being submitted separately with a request for confidentiality.

                  Star One respectfully requests that the Commission confirm expeditiously that the
   milestones have been met (by August 10, 2007, if possible) so that Star One can arrange for a
   timely reduction in the bond amount with its surety.



           ! 47 C.F.R. § 25.164(c).
          * See Stamp Grant, SAT—PPL—20050708—00144, at condition (f) (granted Sept. 9, 2005;
   corrected Sept. 13, 2005) (establishing CDR and commence physical construction milestones of
   September 9, 2007, and September 9, 2008, respectively.).




WASHINGTO N        ®   NEW YORK       #   PH O ENIX   ®   LOS    ANGELES   a   LOND O N      &    BRUSSELS


Marlene H. Dortch
August 7, 2007
Page 2


               Please contact me if you have any questions concerning this submission.

                                            Respectfully submitted,


                                                   Is/
                                            Daniel C.H. Mah
                                            Counselfor Star One S.4.

Enclosures

cc: (by electronic mail)

Andrea Kelly, International Bureau
Robert Nelson, International Bureau


                                             CERTIFICATION




I, Lincoln Oliveira, certify under penalty of perjury under the laws of the United States of
America that:

1.     I am the Director of Engineering and Vice President at Star One S.A. ("Star One") with
       knowledge of the construction status ofthe Star One C2 satellite.

2.     To the best of my knowledge, information, and belief:

       a.      Critical Design Review ("CDR") for the Star One C2 satellite was completed
               during meetings held between 8 March 2006 and 13 March 2006, at Alcatel
               Alenia Space (now named Thales Alenia Space). Attached are minutes from each
               day of those meetings that show the attendees, the matters discussed and the
               action items arising out of each meeting. See Attachment 1 (confidential).

       b.      To date, Star One has paid to Thales Alenia Space approximately 90%of the
               amount due on completion of Payload and System CDR and approximately 80%
               of the total amount due under contract. A small proportion of the progress
               payments due have been withheld for a number of minor pending items that
               Thales Alenia Space is to address during the following months.

       c.      Physical construction of the Star One C2 satellite has commenced. Attached is a
               photograph of the Star One C2 communications payload mated to the satellite
               bus. See Attachment 2 (confidential).




                                       Rio de Janeiro, August 07, 2007.




                                                        [ } LE@%‘v\
                                           LincolnA. A. Oliveira
                              Director of Engineering and Vice President




                  Av. Presidente Vargas, 1012 — 6° andar — Rio de Janeiro — Brasil — Cep: 20071—910
                                  Tel: 55 21 2121—9358    —   Fax: 55 21 2121—9321


ATTACHMENT 1

   REDACTED


ATTACHMENT 2

   REDACTED



Document Created: 2007-08-10 16:19:26
Document Modified: 2007-08-10 16:19:26

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC