Attachment 2003TMI TerreStar-Ca

2003TMI TerreStar-Ca

OPPOSITION submitted by AT&T; Cingular; Verizon

ltr

2003-03-27

This document pretains to SAT-MOD-20021114-00237 for Modification on a Satellite Space Stations filing.

IBFS_SATMOD2002111400237_860742

                                                                                        ORIGINAL
                            |                  Before the                          F?ECE,VED
                                Federal Communications Commission
                                      Washington, DC 20554                             MAR 2 72003
                                                               _              FEDERAL communications
In the Matter of                                    i   DA 03—385                      OFFICE oF the secaeggnMme

TMI Communications and Company,                     )   File No.: 189—SAT—LOI—97
Limited Partnership                    '            )
                                                    )   IBFS Nos.: SAT—LOI—19970926—00161
Request for Modification of Spectrum                )              SAT—AMD—20001103—00158
Reservation for a Mobile—Satellite Service          )              SAT—MOD—20021114—00237
in the 2 GHz Bands                                  )
                                                    )
TMI Communications and Company,                     )               SAT—ASG—20021211—00238
Limited Partnership, Assignor                       )                        R
                                                    )                            Siveq
                                                    )                                   5 zoP
TerreStar Networks Inc.                             )                   l   PO/icy 6
Assignee                                            )                    me’"atlbnalra"Ch
                                                   )                                   Sursay
Request to Assign Spectrum Reservation             )




                      OPPOSITION TO APPLICATION FOR REVIEW


                                                        Kathryn A. Zachem
                                                        L. Andrew Tollin
                                                        Craig E. Gilmore
                                                        Wilkinson Barker Knauer, LLP
                                                        2300 N Street, NW, Suite 700
                                                        Washington, DC 20037—1128
                                                        (202) 783—4141



AT&T WIRELESS SERVICES, INC.               VERIZON WIRELESS             CINGULAR WIRELESS LLC
Douglas I. Brandon                         John T. Scott, III           J. R. Carbonell
AT&T Wireless Services, Inc.               Charla M. Rath               Carol L. Tacker
1150 Connecticut Avenue, NW                Cellco Partnership           David G. Richards
Washington, DC 20036                       d/b/a Verizon Wireless       Cingular Wireless LLC
 (202) 223—9222                            1300 I Street, NW            5565 Glenridge Connector
                                           Suite 400—W                  Suite 1700
                                           Washington, DC 20005         Atlanta, GA 30342
                                           (202) 589—3760               (404) 236—5543



March 27, 2003


                                                     TABLE OF CONTENTS

INTRODUCTION AND SUMMARY .1.222222222020202222222r2rrerrreerreererreresereeseeseeresreer es en rr se esn es esn e se e en en eas 2
DISCUSSION ..2222222222222222v¥rrrrersrrrrrrerererrrrrrssrrrrersrrrrrererseresrreserserseeressrersrerereeristrecrer es e se rer es ie se ererrenes 4
I.         THE BUREAU ORDER CORRECTLY HELD THAT TMI DID NOT SATISFY
           THE INITIAL MILESTONE ...222020222020002209e2r¥retrerrssersrreresrrsirrsrererreresserere se er se rre ies rerrerrrees 4
IL         THE BUREAU ORDER WAS PROCEDURALLY PROPER AND
           CONSISTENT WITH PRECEDENT..2202222222222220202200262689ereseree ks s+re iess rrerr iess ereareree se rerrree. 7
           A.         Failure to Give TMI the Opportunity to Cure Was Not EITOT ..................clcclclle}}. 7
           B.         There Is No Validity to TMI‘s Claim It Lacked Adequate Notice....................... 11
           C.         The Hearing Provision of Section 312 Is Inapplicable and In Any Event Has
                      B@EM SAtISFIE@Q .........0122020222222errerrrevereverrrerertrerers es se se e reeserserrrrerr es en reereresreesrerrerr ies 15
III        THEBUREAU ORDER DOES NOT VIOLATE INTERNATIONAL COMITY........... 19
IV.        THE BUREAU DID NOT ERR BY FAILING TO GRANT A WAIVER...................... 20
0ou(einans (o) ooo 23


                                                                                 RECEIVED
                                             Before the
                             Federal Communications Commission                     MAR 2 7—2003
                                     Washington, DC 20554                   FEDERAL Communications conimiserors
                                                                                  OFFICE oF ThE sechetary
In the Matter of                               )   DA 03—385
                                               )
TMI Communications and Company,                )   File No.: 189—SAT—LOI—97
Limited Partnership                            )
                                               )   IBFS Nos.: SAT—LOI—19970926—00161
Request for Modification of Spectrum           )              SAT—AMD—20001103—00158
Reservation for a Mobile—Satellite Service     )              SAT—MOD—20021114—00237
in the 2 GHz Bands                             )
                                               )
TMI Communications and Company,                )               SAT—ASG—20021211—00238
Limited Partnership, Assignor                  )
                                               )
And                                            )
                                               )
TerreStar Networks Inc.                        )
Assignee                                       )
                                               )
Request to Assign Spectrum Reservation         )

To:    The Commission


                     OPPOSITION TO APPLICATION FOR REVIEW


       Pursuant to Section 1.115(d) of the Commission‘s Rules, 47 C.F.R. § 1.115(d), AT&T

Wireless Services, Inc., Cingular Wireless LLC and Verizon Wireless (the "Carriers") hereby

oppose the March 12, 2003 Application for Review filed by TMI Communications and

Company, Limited Partnership ("TMI") and TerreStar Networks Inc. ("TerreStar") in the above—

referenced proceedings. For the reasons set forth below, the Commission should deny the

Application for Review and affirm the decision of the International Bureau (the "Bureau")

finding that TMI failed to satisfy the initial MSS milestone upon which its authorization was


conditioned, thus rendering its 2 GHz MSS authorization null and void, and dismissing as moot

its related applications for license modification and assignment to TerreStar.‘

                              INTRODUCTION AND SUMMARY

       As a general matter, the Carriers observe that TMI quibbles with specific aspects of the

Bureau Order without ever addressing its own failure to satisfy the initial contract milestone.

The Application for Review provides TMI‘s version of the background surrounding the

nullification order. TMI leaves out several important points, however. For example, TMI

frequently refers to its "affiliation" with TerreStar, but fails to rebut the Bureau‘s finding that

TMI did not control TerreStar, or otherwise demonstrate how TMI was committed to the

construction of the satellites. In a similar vein, TMI suggests that the Commussion‘s approval of

the combination of TMI‘s L—Band MSS business with that of Motient is decisionally significant,

but neglects to mention that decision explicitly indicated TMI‘s authorization to launch and

operate a new 2 GHz MSS system was "not germane to th[e] proceeding.”2

       As demonstrated below, the Bureau Order was well reasoned, consistent with precedent

and fully considered the arguments made by TMI. The Commission previously made clear that

TMI must enter into a non—contingent contract for the construction of its satellite system by July

17, 2002, and also made clear that it would strictly enforce the 2 GHz MSS milestones. The

precedent cited by TMI does not introduce any ambiguity into these obligations, as those cases

are readily distinguishable. Given that TMI sought to satisfy the milestone through a novel

approach, it should have sought advance guidance from the Commission instead of simply



       ‘ TMI Communications and Company, Limited Partnership, 18 F.C.C.R. 1725, @ 1, 14
(2003) ("Bureau Order‘).

       * See Motient Services Inc. and TMI Communications and Company, LP, Order and
Authorization, 16 F.C.C.R. 20469, 20472 & n.23 (IB 2001).

                                               2


waiting until the last minute to create the non—compliant arrangement whereby a company in

which TMI had only a minority interest executed the satellite manufacturing contract.

        The only logical explanation for the arrangement with TerreStar is that TMI wanted to

avoid exposing itself to any liability so as preserve its option to walk away from its 2 GHz MSS

proposal, while maintaining its authorization in case the right to use the spectrum developed any

significant independent value. TMI initially claimed that the contract was executed by TerreStar

because it was the entity to which the authorization would be assigned." In the latest pleadings

TMI now asserts that the identity of the assignee(s) is unknown, and could vary for the U.S. and

Canadian authorizations.* Neither claim, however, explains why it did not simply enter into a

contract with the satellite manufacturer that allowed the contract to be assigned if the licensee

changed.

       In addition, the Bureau Order did not violate the precepts of DISCO II. In that decision

the Commission specifically indicated it would enforce milestones against foreign—licensed

satellite systems. Finally, TMI has not demonstrated that it should receive a waiver or

retroactive cure of the defective milestone compliance.




        * In its October 15, 2002 letter, TMI indicated that: "TMI reasonably expected TerreStar
(rather than TMI) would probably be the licensee at the time the satellite system was completed
and ready for launch. Similarly, in light of the ongoing restructuring of its business, TMI wanted
to ensure continuity in the relationship with its satellite manufacturer and TerreStar also provided
an appropriate vehicle for that." Letter from Gregory C. Staple, Vinson & Elkins, Counsel for
TMI, to Marlene H. Dortch, Secretary, FCC, re: File No. 189—SAT—LOI—97 et al., at 3 (Oct. 15,
2002) ("October 15"" Letter®").
       * Application for Review at 18.


                                           DISCUSSION

1.      THE BUREAU ORDER CORRECTLY HELD THAT TMI DID NOT
        SATISFY THE INITIAL MILESTONE

        TMI‘s authorization expressly stated that "TMI must . . . Enter [a] Non—contingent

Satellite Manufacturing Contract" within 12 months after authorization, or by July 17, 2002."

Rather than executing its own contract with a manufacturer, TMI relied upon a contract between

TerreStar, an affiliate over which TMI lacks control, and Space Systems/Loral, Inc. ("Loral").

The Bureau correctly held that "TMI did not enter into a satellite manufacturing agreement" and

therefore "failed to comply with the plain terms of its authorization.""

        Contrary to TMI‘s claims, the Bureau did not elevate form over substance, but rather

examined the substance of the TerreStar—Loral contract and found that it was inadequate to

demonstrate that TMI had fulfilled not only the letter of the initial milestone, but also the intent

of the milestone to demonstrate an investment and commitment to completion of the satellite

system.‘ TMI asserts that the plain language of its authorization did "not expressly require TMI

to sign a satellite manufacturing contract itself," because the word "enter" has multiple meanings

other than execution.© Commission precedent makes clear, however, that the requirement to




       ° TMI Communications and Company, Limited Partnership, Order, 16 F.C.C.R. 13808,
13812, 13816 (IB 2001) ("TMI Authorization Order").

       ° Bureau Order at [ 9.

       ‘ See Bureau Order at J 8—14.

         8 See Application for Review at 10. As a preliminary matter, this issue must be raised for
the first time at the Bureau level. See 47 C.F.R. § 1.115(c) & note; Richard Duncan d/b/a
Anderson Communications, FCC 03—52, at § 7 (rel. Mar. 12, 2003) ("Duncan").

                                              4


"enter" into a non—contingent contract requires the licensee to execute the contract, and not some

third party over which the licensee lacks control." As the Commission recently explained:

                 We also disagree with Morning Star‘s contention that the Bureau
                 erred in the application of the commencement of construction
                 milestone. Morning Star seems to be arguing that the necessity of
                 entering into a construction contract . .. was not clear. To the
                 contrary, .. .. [t}he Commission has consistently held that, at a
                 minimum, an FSS /icensee must execute a non—contingent satellite
                 construction contract to satisfy the commencement of construction
                 milestone."""

As discussed below, the Commussion has placed even greater emphasis on strict compliance with

the non—contingent contract milestone by 2 GHz MSS licensees.

          Nor did the Bureau Order create any new standard of "strict privity," as TMI contends."‘

Instead, the Bureau found that the satellite contract relied on by TMI was inadequate because

TMI merely had a minority, non—controlling ownership interest in TerreStar, the entity that

executed the contract with the satellite manufacturer. TMI, therefore, did not demonstrate a

commitment to construction of the satellites by guaranteeing the obligations."" Moreover, while


        ° See, e.g., PanAmSat Licensee Corp., 16 F.C.C.R. 11534, 11539 (2001) ("PanAmSat");
NetSat 28 Company, L.L.C., 15 F.C.C.R. 11321, 11322—23 (IB 2000); Morning Star Satellite
Company LLC, 15 F.C.C.R. 11350, 11351—53 (IB 2000), affd, 16 F.C.C.R. 11550 (2001); Norris
Satellite Communications, Inc, 12 F.C.C.R. 22299, 22303 (1997).

          10 Morning Star Satellite Company LLC, 16 F.C.C.R. 11550, 11553—54 (2001) ("Morning
Star‘).

          !! See Application for Review at ii.

         2 TMI has no liability with regard to payment for satellite construction under the
TMTerreStar agreement or the TerreStar/Loral contract, either directly or as a guarantor of the
obligations of TerreStar. Thus, TMI has been and is free to walk away from its proposed 2 GHz
MSS system without penalty, and apparently without having spent any money constructing the
satellite. Compare PanAmSat, 16 F.C.C.R. at 11539 (contract "that does not create a financial
obligation for the licensee to proceed" does not satisfy the non—contingent contract milestone)
(emphasis added) with Tempo Satellite Inc. and DirecTV Enterprises, Inc., 7 F.C.C.R. 6597,
6600 (IB 1992) (contract in which the "payment terms and schedule demonstrate the applicant‘s
investment and commitment to completion of the system" satisfies non—contingent requirement)
(emphasis added).
                                              5


TMI claims certain contractual rights as a result of its letter agreement with TerreStar, the

satellite manufacturing contract expressly indicated that TMI had no rights under the contract.

Section 37.15 of that contract explicitly states that:

               This contract is entered into solely between, and may be enforced
               only by, Purchaser [defined as TerreStar] and Contractor [defined
               as Loral] and their permitted assigns, and this contract shall not be
               deemed to create any rights in third parties, including suppliers,
               customers and owners (inc/uding TMT) of a Party, or to create any
               obligations of a Party to any such third parties.13

       TMI‘s attempts to take snippets of language from the order and construct a claim that it

had met its milestone also fail.‘* Although the Bureau Order acknowledged that TerreStar was

an "affiliate" of TMI, the Bureau also looked beyond that label and determined that the minority

ownership interest did not amount to control by TMI over TerreStar. TMI does not dispute this

finding. Likewise, TMI‘s quotes from the Bureau Order that merely described TMI‘s arguments

about the reason for the contract being executed by TerreStar, the rights of TMI to benefits of the

contract, or the extent of progress under the contract, all ignore the fact that the Bureau assessed

TMI‘s obligations and commitments and found them to be inadequate.

       The Commission can also dismiss TMI‘s claim that the Bureau Order is inconsistent with

the ATC Order."" Although the ATC Order does refer to the "commonality of interests" among

TMI, Motient and MSV, that is irrelevant to the analysis in the Bureau Order as to whether the

commonality of interest between TMI and TerreStar was sufficient to satisfy the initial


        3 See Contract between TerreStar Networks Inc. and Space Systems/Loral, Inc. for the
TerreStar 1 Satellite Program (Acceptance On—Orbit), at § 37.15 (July 14, 2002)
("TerreStar/Loral Contract") (emphasis added).

       * See Application for Review at i.

      5 See Application for Review at 17 n.56 (citing Flexibilityfor the Delivery of
Communications by Mobile Satellite Service Providers, 18 F.C.C.R. 1962, « 6 n.10 (2003)
("ATC Order‘)).


milestone. In the L—band, TMI has combined its MSS business with Motient (into MSV), a

transaction that was approved by the Commission. That decision, however, explicitly excluded

TMI‘s 2 GHz MSS authorization."° Thus, the fact that there is, in some general respects, a

relationship among TMI, Motient and MSV is not inconsistent with the finding by the Bureau

that for purpose; ofmilestone compliance there is not the requisite commonality between TMI

and TerreStar, or control by TMI over TerreStar, or any other demonstration by TMI of a

commitment to the satellite manufacturing contract.

        If anything, it is TMI that seeks to establish a new interpretation of the milestone. In

essence, TMI argues that it satisfies the milestone because a company over which it lacks control

has entered into a satellite manufacturing contract. That contract expressly states that TMI has

no rights under the contract and the manufacturer has no obligations to TMI. TMI‘s position is

unfounded and unreasonable. In sum, the Bureau Order was not based on a mere technicality —

the absence of privity — but instead was based on the conclusion that TMI had not, through

execution of a contract, financial guarantees, or any other manner, demonstrated a commitment

to construction of the satellite as required by the initial contract milestone condition in its

authorization.

IL.    THE BUREAU ORDER WAS PROCEDURALLY PROPER AND
       CONSISTENT WITH PRECEDENT

       A.        Failure to Give TMI the Opportunity to Cure Was Not Error

       TMI claims that it was unfair and improper for the Bureau to declare the authorization

null and void because TMI was misled by Commission Staff at a post—milestone meeting into

believing it could retroactively cure the defective milestone compliance by filing an assignment




        5 See supra note 2.


application."‘ TMI also complains that the Bureau should have waited until the end of the

pleading cycle on the assignment application (¥.e., waiting for the Carriers to respond to its

Opposition to the Petition to Deny) to address the infirmities in the milestone compliance. As a

preliminary matter, these cure arguments erroneously link TMI‘s milestone compliance with the

TerreStar assignment application. The two are separate proceedings related only insofar as a

finding of milestone noncompliance and license nullification necessarily rendered the assignment

application moot as there was nothing to assign, as the Bureau correctly found."

       More fundamentally, there exists no right to cure milestone non—compliance after the

deadline has passed. To the contrary, the Commussion has stated that it will "strictly enforce" the

2 GHz MSS milestones, including the requirement to enter into a non—contingent satellite

manufacturing contract within one year of licensing, and that non—compliant licenses are null and

void." To permit TMI to correct its failure to execute a non—contingent satellite manufacturing

contract by assigning its authorization to TerreStar after the milestone has come and gone would

render meaningless strict enforcement of the milestones. TMI cites to no satellite precedent to

support its claimed "right to cure." It offers only a broadcast case, Spanish International, which

is inapposite. The case does not involve automatic cancellation for failure to meet a license

condition, let alone strict milestone enforcement.""

       Moreover, the Bureau conducted a careful investigation in which TMI was a full and

active participant prior to concluding TMI failed to satisfy the initial milestone. TMI was


       ‘‘ Application for Review at 20.

       } See Bureau Order at § 15.

         Service Rules for MSS in the 2 GHz Band, 15 F.C.C.R. 16127, 16150, 16177—78 (2000)
("2 GHz MSS Order‘);, TMI Authorization Order, 16 F.C.C.R. at 13816.

       * Spanish International Communications Corp., 2 F.C.C.R. 3336 (1987).

                                             8


afforded ample opportunity to submit new factual information that existed at the time of the

milestone deadline (but was unknown by the Commission) to augment the record in the

milestone proceeding."‘ Specifically, following receipt of a letter from the Carriers in August

2000 questioning TMI‘s compliance with the initial milestone,"" Commission Staff met with

TMI and raised questions concerning the relationship between TMI and TerreStar."" TMI

indicated in response that it presently "only has an indirect [minority] interest in TerreStar

through its ownership interest in" the parent company of TerreStar."* On October 4, 2002, the

Commission sent a letter to Counsel for TMI explicitly requesting additional information as part

of its review of whether TMI entered into a non—contingent satellite manufacturing contract. The

letter stated:

                 Specifically, we note that TMI is not a party to the TerreStar/Loral
                 contract, and that the TMI/TerreStar agreement does not appear to
                 bind TMI in any way to pay for satellite construction under the
                 TerreStar/Loral contract. Please indicate whether there are any
                 agreements or other arrangements by which TMI is legally
                 obligated to pursue the construction of proposed system, or is in




        *‘ Cf EchoStar Satellite Corporation, DA 02—3085 (IB rel. Nov. 8, 2002) ("EchoStar").
       * Letter from Kathryn A. Zachem and L. Andrew Tollin, Wilkinson Barker Knauer,
LLP, Counsel for AT&T Wireless Services, Inc., Cingular Wireless LLC and Verizon Wireless
to Marlene H. Dortch, Secretary, FCC, in IB Docket No. 01—185 et al., at 4—5 (Aug. 15, 2002)
(noting that "there is a serious question whether TMI . . . has entered into a non—contingent
contract, as it is relying not upon its own contract with a manufacturer, but rather upon a contract
between a proposed investor, TerreStar Networks Inc., and Loral") (footnote omitted).

        * See Letter from Gregory C. Staple, Vinson & Elkins, Counsel for TMI, to Marlene H.
Dortch, Secretary, FCC, re: File No. 189—SAT—LOI—97 et al. (Aug. 27, 2002) ("August 27TMI
Letter"). Apparently there was also at least one later meeting between TMI and the Commission
Staff, although there had been no notice of that meeting in the record of Docket No. 01—185,
notwithstanding the fact that TMI apparently addressed that proceeding in the meeting. See
Application for Review, Exh. 2 at «[ 4.

        ** August 27"" TMI Letter at 2.


                any way liable in the event the satellite system is not
                implemented.""

The letter also advised TMI to provide all "potentially relevant information," as the failure to do

so "may result in an adverse inference concerning milestone compliance."""

       TMI purported to answer the Commission‘s inquiry in a letter dated October 15, 2002.

That letter, however, dodged the Commission‘s request to identify any agreements or other

arrangements that would bind TMI, so presumably there is no such obligation. Instead, TMI

merely claimed that TerreStar has rights to a satellite and explained that the contract was

undertaken by TerreStar because TMI expects to assign its FCC authorization to TerreStar in the

near future."‘ The Carriers subsequently filed a more detailed challenge to the TMI milestone

compliance demonstration on December 11, 2002."°

       Rather than respond directly to those concerns aboutits initial milestone compliance,

TMI now asserts that it sought to "cure" the milestone compliance concerns by filing the

assignment application."" TMI cannot cure milestone noncompliance after—the—fact, and has not



      * Letter from Thomas S. Tycz, Chief, Satellite Division, FCC to Gregory C. Staple,
Vinson & Elkins, Counsel for TMI, re: File No. 189—SA¥AT—LOI—97 et al., at 1 (Oct. 4, 2002).
The Commission also asked TMI to explain the discrepancy between the orbital location in the
FCC authorization and the orbital location specified in the TerreStar/Loral contract and the
Canadian authorization. Id.

       °8 Id. at 2.

       *‘ In that response, TMI also asserts that TMI has an "indirect interest" in performance of
the Loral contract. See October 15¢" Letter. As noted above, however, the TerreStar/Loral
contract explicitly disclaims any interest of TMI in the contract. See TerreStar/Loral Contractat
§ 37.15.

       * Letter from Kathryn A. Zachem and L. Andrew Tollin, Wilkinson Barker Knauer,
LLP, Counsel for AT&T Wireless Services, Inc., Cingular Wireless LLC and Verizon Wireless
to Marlene H. Dortch, Secretary, FCC, re: File No. 189—SAT—LOI—97 et al. (Dec. 11, 2002).

       * See Application for Review at n.25; Opposition to Petition to Deny, File No. SAT—
ASG—20021211—00238, at 14—16 (Feb. 6, 2003) ("February 6°" Opposition"). In the assignment
application itself, however, TMI explained that the timing of the assignment was driven initially
                                            10


submitted any new evidence that existed prior to the milestone deadline to demonstrate

compliance,"" even after multiple opportunities to do so. TMI‘s decision to rely on purported

statements by staff that it could cure its milestone defect by filing the assignment application was

made at its own risk. Even had such informal staff advice been provided,"‘ it is not binding.""

Indeed, TMI‘s decision to enter into a non—compliant arrangement rather than an assignable

contract‘* indicates that TMI knowingly sought to avoid exposing itself to any liability so as

preserve its option to walk away from its 2 GHz MSS proposal.

       B.      There Is No Validity to TMI‘s Claim It Lacked Adequate Notice

       There is no validity to TMI‘s claim that it did not have adequate notice of the standards

the Bureau would apply in evaluating the initial contract milestone, and the consequences for

non—compliance. The TMZ Authorization Order was clear on its face: "TMI must . . . Enter Non—

contingent Satellite Manufacturing Contract" by July 17, 2002."" In addition, TMI (and the other



by the need to await Canadian licensing, and then by a desire to await the outcome of the
Commission‘s ATC proceeding. See Application of TMI Communications and Company,
Limited Partnership, File No. SAT—ASG—20021211—00238, Exh. 2 at 3—4 (filed Dec. 11, 2002).

       "° Cf EchoStar, DA 02—3085 at 4 5. The February 6" Opposition was not filed in the
milestone proceeding, and in any event offered only legal argument and not any new facts. See
February 6°" Opposition at 3 (acknowledging that "[t}he key facts are not in dispute").

       *‘ The Carriers are skeptical of TMI‘s characterizations of what the Staff suggested or
encouraged, although the Carriers were not invited to attend the meeting.

        * The Commission has specifically held that "parties who rely on staff advice or
interpretations do so at their own risk." Hinton Telephone Company, 10 F.C.C.R. 11625, 11637
(1995); see Malkan FM Associates v. FCC, 935 F.2d 1313, 1319 (D.C. Cir. 1991) (citing
Schweiker v. Hansen, 450 U.S. 785, 788—89 (1981)); P&R Temmer v. FCC, 743 F.2d 918, 931
(D.C. Cir. 1984).

        * TMI clearly could have done so, as Loral was willing to accept such a term and
subsequent assignment. See TerreStar/Loral Contract at Section 37.1.2 (providing TerreStar with
rights to assign or transfer the contract); see also infra note 39.

       * TMI Authorization Order, 16 F.C.C.R. at 13812.

                                             11


2 GHz MSS licensees) were all on notice that the Commission would be applying a "strict

enforcement" standard to 2 GHz MSS milestone compliance. In adopting the 2 GHz MSS

service rules, the Commission concluded that it would "impose and strictly enforce milestone

requirements" instead of financial qualifications."" The Commission emphasized that strict

milestone enforcement would be "especially important" in lieu of "financial qualifications as an

entry criterion, * and specifically anticipated that spectrum would be "returned to the

Commission as a result of missed milestones."""‘ In fact, the TMI Authorization Order expressly

stated that it "shall become NULL and VOID with no further action required on the

Commission‘s part" if any of the milestones were not met."*

       TMI‘s claim that ambiguity as to the standards for the initial milestone was created by

precedent rings hollow. First, TMI ignores relevant precedent. In a milestone case involving the

absence of a contract because of a pending assignment application, the Commission indicated

that the licensee could have entered into a contract with the manufacturer and provided for

assignment of that contract in the event that the satellite license was subsequently assigned.""

       Moreover, the two satellite decisions now relied on by TMI did not involve an initial

contract milestone and are otherwise readily distinguishable. The VZ7T4 decision cited by TMI (i)

       * 2 GHz MSS Order, 15 F.C.C.R. at 16150 (emphasis added).

        3 Establishment ofPolicies and Service Rules for the Mobile Satellite Service in the 2
GHz Band, IB Docket No. 99—81, Notice ofProposed Rulemaking, 14 F.C.C.R. 4843, 4881
(1999).

       * 2 GHz MSS Order, 15 F.C.C.R. at 16150.

       8 TMI Authorization Order, 16 F.C.C.R. at 13816.

       * See Columbia Communications Corporation, 15 F.C.C.R. 16496, 16500 (IB 2000); see
also Motorola, Inc. and Teledesic, Inc., 17 F.C.C.R. 16543, 16550 (IB 2002)
("Motorola/Teledesic") ("Motorola could have satisfied the construction—commencement
requirement by entering into a construction contract providing for a shift of payment obligations
to Teledesic upon consummation of the proposed license assignment.").

                                             12


addressed a construction and launch milestone for a replacement satellite; (11) was not decided

under a "strict enforcement" standard; (ii1) concerned a direct contract between VITA and the

satellite manufacturer (FAI);*° and (iv) relied in part on the humanitarian nature of VITA‘s

proposed offerings."‘ The other satellite decision cited by TMI — USSB — did not involve

milestones at all, let alone the current strictly enforced 2 GHz MSS milestones, but rather

addressed compliance with the then—flexible DBS due diligence standards." USSB stands only

for the proposition that under the unique circumstances present in that case in 1992, the sharing

arrangement at issue therein satisfied the initial due diligence DBS requirement — not, as TMI



       * Lolunteers in Technical Assistance, Order, 12 F.C.C.R. 3094, 3100 (IB 1997)
("VITA") ("The agreement provides that FAI will build the satellite . . . .").

         * VITA, 12 F.C.C.R. at 3105—06 ("VITA has struggled for years to launch and operate a
Little LEO satellite system to further its humanitarian mission of providing essential educational,
health, environmental, disaster relief and technical communication services in developing
countries. Its non—profit status, coupled with the unfortunate loss of its first satellite in a launch
failure, has presented VITA with peculiar roadblocks to the initiation of its planned services.
VITA is, however, now prepared to move forward expeditiously with the provision of its service.
Consequently, we find that these are sufficient public interest reasons to justify the grant of
VITA‘s replacement satellite.").

        42 Cf. United States Broadcasting Company, Inc., 7 F.C.C.R. 7247 (MMB 1992)
("USSB"). While the due diligence requirements for DBS are somewhat analogous to the
milestones for MSS and fixed satellite services insofar as they represent benchmarks for
measuring system progress, the rigidity with which the DBS requirements have been enforced
has varied over time. At the time of the USSB decision and earlier, the Commussion took a
flexible approach to enforcement during the infancy of DBS. See Advanced Communications
Corp., 11 F.C.C.R. 3399, 3409—10 (1995) ("ACC""); see also id. at 3442 (Separate Statement of
Commissioner Rachelle Chong). When it later became clear that flexible enforcement was
leading to delays in construction and operation, the Commission called for stricter enforcement.
Id. at 3404—05, 3409; see also Policies and Rules for the Direct Broadcast Service, 17 F.C.C.R.
11331, 11353—54 n.166 (2002) ("The Commission may in a future proceeding consider the issue
of whether to continue to apply the traditional DBS "totality of the circumstances" test in
determining whether licensees have met their due diligence requirement. . . . Alternatively, the
Commission could decide to hold DBS licensees to the strict milestone requirements applicable
to FSS licenses."). By contrast, in the case of 2 GHz MSS, the Commission has stated since
before licensing that it will strictly enforce the milestones, particularly given the absence of
financial qualifications.

                                              13


suggests, that the absence of privity as a general matter does not undercut the initial contract

milestone."" Notably, the case arose after USSB had already been found to have satisfied the

initial due diligence requirement when it signed a contract for the construction of three

satellites."*

        Likewise, TMI‘s attempt to rely on broadcast or CMRS cases to create ambiguity as to

the applicable standard for review of 2 GHz MSS initial milestone compliance is unavailing.

The fact that in a broadcast decision different subsidiaries of News Corp. would hold the license

and run the operations hardly creates supporting precedent for TML.*" That case did not involve

the "strict enforcement" of an initial contract milestone, and there is a significant difference

between the "not wholly owned" subsidiary there and the non—controlling minority ownership

interest in this case. Nor do the various terrestrial CMRS business arrangements discussed by

TMI provide any support for its claim that the satellite contract between TerreStar and the

satellite manufacturer should suffice, notwithstanding the absence of a contractual obligation (or

controlling ownership in TerreStar). Those cases obviously do not involve satellite milestones,

let alone the "strict enforcement" of an initial contract milestone. In the terrestrial context, there

is also not the same concern of spectrum warehousing, because the terrestrial CMRS licenses

were usually acquired at an auction.

        Given the clear requirement that TMI enter into a non—contingent satellite manufacturing

contract and notice that the requirement would be strictly enforced, the knowledge that failure to

meet the milestone would render its authorization null and void, and the absence of any


        * See Application for Review at 12.

        * See USSB, 7 F.C.C.R. at 7249.
       * Application for Review at 15 (citing Applications of UTV ofSan Francisco, Inc., 16
F.C.C.R. 14975 (2001)).

                                              14


precedent suggesting that a contract entered into by a non—controlled affiliate would suffice, the

burden was on TMI to approach the Commuission in advance of the deadline to seek formal

guidance as to whether the contemplated arrangement would satisfy the milestone."" TMI never

took this basic step. The Commission can hardly be faulted for failure to anticipate all of the

potential ways in which licensees might attempt to skirt the strict enforcement of the milestone

compliance and address each of these in the 2 GHz MSS rulemaking.*"" By structuring the

arrangements as it did at the last minute, TMI assured its fate and cannot now complain that it

had no notice and was denied due process when the FCC correctly found that the absence of a

commitment by TMI undercutits initial contract milestone compliance. As the FCC has

previously instructed:

               At no point did Morning Star request a clarification, extension or
               waiver of its construction contract. . . . [WJhen satellite licensees
               do not pursue procedural avenues available to them to address
               concerns surrounding their authorizations, but rather wait until
               their authorizations are null and void due to their failure to act,
               their inaction ensures the result that the milestone concept is
               designed to plreven‘[.4L8

       C.      The Hearing Provision of Section 312 Is Inapplicable and In Any
               Event Has Been Satisfied

       TMI also claims in a footnote that it was entitled to a hearing under Section 312 before

the Bureau could "cancel" its license, without indicating what type of hearing (evidentiary or




        * See Morning Star, 16 F.C.C.R. at 11554 (2001); see also Motorola/Teledesic, 17
F.C.C.R. at 16550 ("Not even having taken the basic step of apprising us of the alleged difficulty
prior to expiration of the time allowed for compliance, the Applicants must accept the
consequences of their failure to satisfy the milestone requirement within that time—period.").

       *‘ Cf, Application for Review at 11 (criticizing the 2 GHz MSS Order for being silent on
how a licensee may enter into a satellite manufacturing contract).

       * Morning Star, 16 F.C.C.R. at 11554.
                                             15


otherwise) it was entitled to."" As a threshold point, TMI‘s argument that the "summary

cancellation" of its authorization violates Section 312‘s hearing provisions is a question upon

which the Bureau has been afforded no opportunity to pass. This argument, therefore, cannot be

raised before the Commission for the first time.""

        Notwithstanding this procedural error, Section 312 is inapplicable to this case. Section

312 applies to license revocation, but that is not what happened to TMI‘s authorization. The

Bureau Order held that TMI‘s 2 GHz MSS authorization "is null and void by its own terms" for

failure "to satisfy the initial implementation milestone set forth in its Letter of Intent ("LOT")

authorization.""‘ TMI‘s authorization was therefore not revoked."" Rather, the non—contingent

contract milestone was a condition on its authorization, which was valid only as long as the

condition was satisfied. Its authorization was rendered null and void by operation of law and

automatically cancelled when TMI failed to satisfy the license condition.""



       * Application for Review at n.59.

       5 See 47 C.F.R. § 1.115(c) & note; see also Duncan, FCC 03—52 at "| 7.

       *‘ Bureau Order at [ 24.

       * See, eg., Glendale Electronics, Inc., 17 F.C.C.R. 22189, 22194 (CWD/WTB 2002);
Revision ofPart 21 ofthe Commission‘s Rules, 2 F.C.C.R. 5713, 5718 (1987). The NextWave
D.C. Circuit decision is inapposite. There, it was undisputed that the case involved revocation of
licenses under Section 525 of the Bankruptcy Code. See NextWave Personal Communications,
Inc. v. FCC, 254 F.3d 130, 149 (D.C. Cir. 2001), affd 123 S. Ct. 832 (2003); see also, e.g.,
United States v. Verdugo—Urquidez, 494 U.S. 259, 272 (1990) (judicial decisions do not serve as
precedent for points that were not raised and analyzed). In fact, the Court expressly ruled that it
was unclear whether the FCC‘s automatic cancellation policy even applied under the facts of that
case. 254 F.3d at 142. Finally, the discussion in NextWave concerning the "effect" of license
cancellation occurred in the context of determining whether jurisdiction existed under 47 U.S.C.
§ 402(a) or (b), see 254 F.3d at 140, and not whether Section 312(c) hearing rights had been
triggered.

       * See, eg., Richard Duncan d/b/a Anderson Communications, 16 F.C.C.R. 4312, 4312—
13 (2001), affd in part, Morris Communications, Inc. v. FCC, No. 01—1123 (D.C. Cir. Apr. 17,
2002), on remand, FCC 03—52, at «[ 6 (rel. Mar. 12, 2003).

                                              16


       Moreover, under the D.C. Circuit‘s Termmer precedent, TMI has no hearing rights

because its authorization was never perfected.""* Temmer makes clear that an applicant who

accepts a license that is conditioned on future performance accedes to such condition(s), which

renders the applicant‘s rights contingent."" Only after satisfaction of the condition(s) do the

contingent rights vest and the hearing protections of the Act come into play. In other words,

where an entity fails to satisfy a requirement on which its authorization is conditioned, its rights

under the license remain unperfected and it is not entitled to a hearing prior to cancellation for

failure to meet that condition."" TMI‘s failure to satisfy the initial milestone upon which its

license was conditioned meant that its rights under the authorization, including the right to a

hearing, never vested. The FCC was fully empowered to cancel the license for failure to satisfy

the condition.

       In any event, all Section 312 requires is notice and opportunity to be heard. TMI

received both. No purpose would be served in holding an evidentiary hearing because it is not

disputable that TMI failed to enter into a non—contingent satellite manufacturing contract, and

thus failed to satisfy the condition that was a prerequisite to holding its license."‘ Where there




       * P & R Temmer v. FCC, 743 F.2d 918 (D.C. Cir. 1984) ("Temmer‘).

       * See id. at 928.
        ° See id. Although Temmer arose in the context of Section 316 hearing rights, the case
has been applied in the context of Section 312. See Peninsula Communications, Inc., 17
F.C.C.R. 2838, 4 (2002) (citing Temmer, 743 F.2d at 928); Revision ofPart 21 ofthe
Commission‘s Rules, 2 F.C.C.R. at 5718 (citing Temmer; Music Broadcasting Co. v. FCC, 217
F.2d 339, 342 (D.C. Cir. 1954)). The term revocation is loosely used in Temmer in all
probability because failure to meet the condition did not result in automatic cancellation. See
743 F.2d at 925—26. Nevertheless, the Court recognized no hearing rights were triggered.

       *" See Bureau Order at "| 9 ("TMI did not enterinto a satellite manufacturing agreement"
and therefore "failed to comply with the plain terms ofits authorization"); Application for
Review at 24 (arguing that the Commussion should have approved assignment of the TMI
                                            17


are no material questions of fact to be resolved, only questions of law,"" the FCC is not required

to hold a purposeless evidentiary hearing."" Through the Bureau‘s October 4, 2002 letter and

meetings with staff, TMI received notice that its compliance with the initial milestone was in

question, and was given multiple opportunities to respond to the questions raised."" TMI is

entitled to nothing more."




authorization to TerreStar to "cure the defect," particularly "in light of the technical nature of the
[milestone] violation").

       * TMI has previously admitted that "[t}he key facts are not in dispute." February 6
Opposition at 3. Thus, there is no factual question as to what TMI did. There is only a pure
question of law as to whether what it did satisfied the initial milestone

         * See, e.g., U.S. v. Storer Broadcasting Co., 351 U.S. 192, 2002—05 (1956); Alabama
Power Company v. FCC, 311 F.3d 1357, 1372 (1 1°" Cir. 2002) ("APCo must therefore identify a
material question of fact that warrants a hearing. But its dispute is only over . . . a legal issue
that hardly warrants an evidentiary hearing since no material facts are disputed."); RKO General,
Inc. v. FCC, 670 F.2d 215, 231 (D.C. Cir. 1981) ("RKO") (where the Commission needs only to
"draw legal conclusions from ‘facts already known,""it is "not required to . . . reopen the
proceeding for an evidentiary hearing that would have served no purpose") (quoting Lakewood
Broadcasting Service, Inc. v. FCC, 478 F.2d 919, 924 (D.C. Cir. 1973)); Network Project v.
FCC, 511 F.2d 786, 796 (D.C. Cir. 1975) (a hearing is not necessary where the Commission‘s
decision is based on "inferences and conclusions drawn from undisputed facts"); Cifizens for
Allegan County, Inc. v. Fed. Power Comm‘n, 414 F.2d 1125, 1128 & n.5 (D.C. Cir. 1969) ("The
right of opportunity for hearing does not require a procedure that will be empty sound and show,
signifying nothing."); Anti—Defamation League ofB‘nai B‘rith v. FCC, 403 F.2d 169, 171 (D.C.
Cir. 1968) ("inferences to be drawn from facts already known and the legal conclusions to be
derived from those facts" may be made by the Commission without an evidentiary hearing);
TelePrompTer Cable Systems, Inc., 52 F.C.C.2d 1263, 1264 & n.2 (1975) ("[E]ven if Section
312 were applicable, it is difficult to see what there would be to hear, given our view of the case.
.. . It seems to us beyond question that ‘once evidentiary facts are undisputed, a hearing serves
no purpose."") (quoting Gellhorn & Robinson, Summary Judgment in Administrative
Adjudication, 84 Harv. L. Rev. 612, 630 (1971)), remanded on other grounds, 543 F.2d 1379
(D.C. Cir. 1976).

       * See supra Sections ILA and ILB.

        61 Cf. RKO, 670 F.2d at 235—36 (right to a hearing satisfied as long as the party has
"actual notice of the conduct said to be at issue" and has been given the opportunity to speak on
its own behalf).

                                              18


III.      THEBUREAU ORDER DOES NOT VIOLATE INTERNATIONAL
          COMITY

          TMI also claims that the Bureau erred in seeking to enforce the initial contract milestone

because it was duplicative of Canadian regulatory requirements, citing the national comity

policies articulated in DISCO I7."" TMI‘s argument is both procedurally and substantively

flawed.

          As an initial matter, TMI‘s argument that the Commission cannot independently evaluate

milestone compliance is an untimely attack on the milestone conditions in its license. Rather

than challenge the imposition of the milestone conditions in a timely petition for reconsideration

of its licensing order, TMI now asserts that the Commission cannot independently enforce the

deadlines in its authorization." As the Court of Appeals indicated in the Capital Telephone

decision,"" the Commission‘s Rules logically require the licensee to accept the privileges along

with the obligations, or to follow the procedures to seek reconsideration of the conditions. Here,

TMI accepted the 2 GHz MSS authorization, despite the fact that the Commission imposed

milestone deadlines that would result in the automatic cancellation of the license if the deadlines




        * Application for Review at 12—14 (citing Amendment ofthe Commission‘s Regulatory
Policies to allow Non—U.S. Licensed Space Stations to Provide Domestic and International
Satellite Service in the United States, Report and Order, 12 F.C.C.R. 24094 (1997) (CDISCO
IP)).

        * A conditioned license becomes final if the licensee fails to timely challenge the
conditions on its license. See 47 U.S.C. §§ 402(b), 405(a); 47 C.F.R. §§ 1.110, 25.156(b); Plaut
v. Spendthrift Farm, Inc., 514 U.S. 224, 225—27 (1995); see also Morning Star, 16 F.C.C.R. at
11553 ("Failure to challenge the conditions imposed is tantamount to accepting its license as
conditioned.").

          * Capital Telephone Company, Inc. v. FCC, 498 F.2d 734 (D.C. Cir. 1974); see also
Temmer, 743 F.2d 918.

                                              19


were not met. Its belated attempt to challenge the Commission‘s ability to enforce that condition

is therefore an impermissible collateral attack on a final decision that must be rej ected."

        Even putting aside the fatal procedural infirmity in TMI‘s challenge, the argument fails

because DISCO II does not immunize a foreign—licensed satellite system from enforcement of the

Commission‘s requirements. In adopting the WTO non—discrimination obligations into its

satellite licensing rules in the DISCO Z7 decision, the Commission made clear that foreign—

licensed satellite systems would be treated the same as U.S.—licensed satellite systems — they

would not be disadvantaged, nor would they be exempted from the various qualification

standards and operating requirements."" Indeed, the Commission indicated in DISCO Z7 thatit

retained authority to enforce license conditions, including milestones, against foreign—licensed

carriers."" In sum, the Commission is not bound by the fact that Industry Canada has not notified

TMI that it has failed to comply with the Canadian satellite construction requirements.

IV.     THE BUREAU DID NOT ERR BY FAILING TO GRANT A WAIVER

        TMI also asserts that the Bureau should have granted TMI a waiver of the milestone."

Yet, this request was not made until February 6, 2003 — the day before the Bureau Order was

adopted and more than six months after the milestone deadline — and was submitted in the



       * See e.g., MCI Telecommunications Corp. v. Pacific Northwest Bell Telephone Co., 5
F.C.CR. 216, 227—28 n.38 (1990), recon. denied, 5 F.C.C.R. 3463 (1990), appeal dismissed sub
nom. Mountain States Tel. and Tel. Co. v. FCC, 951 F.2d 1259 (10th Cir. 1991) (per curiam).

       * E.g., DISCO II, 12 F.C.C.R. at 24100, 24168—69, 24174 n.359.
        *" Id. at 24183 ("We agree that it is paramount that all operators providing satellite
service in the United States comply with Commission rules and policies applicable to that
particular satellite service. In addition, we often attach specific conditions to licenses relating to
operating requirements, system implementation requirements, and technical parameters. Entities
violating the terms of their license are subject to administrative penalties, including monetary
forfeitures and license revocation.") (emphasis added).

       * Application for Review at 22—24.

                                              20


assignment proceeding not the milestone proceeding."" TMI makes this argument for the first

time in the milestone proceeding in its Application for Review, and the argument is one upon

which the Bureau has not been afforded an opportunity to pass. TMI‘s request is thus

procedurally improper, as the Commission has recently made clear:

               [We find the waiver request to be procedurally improper because
               Morris raised the argument for the first time in its Application for
               Review. Section 1.115(c) provides that no application for review
               will be granted if it relies on questions of fact or law upon which
               the designated authority, subject to Commission review, has been
               afforded no opportunity to pass. Morris could have requested from
               the Bureau a waiver of the construction requirement and an
               extension of the deadline on many occasions prior to the filing of
               its Application for Review, dating back to the period before its
               construction authority expired.""

       In any event, TMI fails to present any valid basis for granting such relief. TMI made no

attempt to satisfy (or acknowledge) the "high hurdle" to justify a waiver‘‘ — a hurdle that is even

higher here where waiver runs counter to the notion of strict milestone enforcement."" Rules

may be waived only for good cause upon a showing of special circumstances if the relief

requested would not undermine the policy objective of the rule and would otherwise serve the

public interest."" In this case, TMI failed to provide any reasonable explanation as to why it did


       * See February 6°" Opposition at 14.

       " Duncan, FCC 03—52 at "| 7 (citing 47 C.F.R. § 1.115(c)).
       " WAIT Radio v. FCC, 418 F.24 1153, 1157—59 (D.C. Cir. 1969); see also Columbia
Communications Corporation, 15 F.C.C.R. 16496, 16504 (IB 2000) (explaining that "[wle have
waived construction commencement milestones only in rare instances").

         See 2 GHz MSS Order, 15 F.C.C.R. at 16178—79; see also Temmer, 743 F.2d at 931—32
("Licensees who [meet the conditions of their authorizations] retain them; licensees who fail to
[do so] lose them. Under this regulatory structure, requests for waiver or extensions are
disfavored.").

         See 47 C.F.R. § 1.3; WAIT Radio, 418 F.2d at 1157—59; Northeast Cellular Telephone
Co. v. FCC, 897 F.2d 1164, 1166 (D.C. Cir. 1990); Dominion Video Satellite, Inc., 14 F.C.C.R.
$182, 8185 (IB 1999).
                                            21


not itself execute the satellite construction contract and provide for its assignability, much less

provide any special circumstances that compelled it to create the non—compliant arrangement

with TerreStar. The only logical explanation for the chosen arrangement is that TMI wanted to

avoid binding itself while maintaining its 2 GHz MSS authorization in case the right to use the

spectrum developed any significant independent value — precisely the type of speculation the

initial milestone is intended to preclude."* Moreover, grant of the requested relief would

undermine the policies underlying the "strict enforcement" of the 2 GHz MSS milestones.

Indeed, the strict enforcement of the 2 GHz MSS milestones substitutes for the financial

qualifications standard normally applied to satellite licensees,"" and TMI admits that it lacks

sufficient financial resources to construct and launch its satellite system."* Thus, TMI has failed

to demonstrate that waiver would be appropriate in this case.




        ‘* Indeed, TMI even acknowledges that it delayed the filing of the assignment application
by a desire to await the outcome of the Commission‘s ATC proceeding. See supra note 29.

        "> Under a traditional financial qualifications test, the Commission only issues a license to
an applicant that can demonstrate a present ability to finance the construction, launch and first
year‘s operations of the proposed satellite system.

        76 Request for Stay, re: File No. 189—SAT—LOI—97 et al. at 7 (Mar. 12, 2003) ("In order
for construction of TMI‘s satellite to remain on course and be completed, the company must
obtain additional investment and capital resources through a further round of fundraising").

                                             22


                                       CONCLUSION

       For the foregoing reasons, TMI‘s Application for Review should be denied and the

Bureau Order upheld.



                                                         Respectfully submitted,




                                                         L. Andrew Tollin
                                                          Craig E. Gilmore
                                                        ~ Wilkinson Barker Knauer, LLP
                                                         2300 N Street, NW, Suite 700
                                                         Washington, DC 20037
                                                         (202) 783—4141




riidonEeA Lnbcharks._                                   m~     ¢




Dougl¥s I. Brandon             John T. Scott, III          J. R. Carbonell
AT&T Wireless Services, Inc.   Charla M. Rath              Carol L. Tacker
1150 Connecticut Avenue, NW    Cellco Partnership          David G. Richards
Washington, DC 20036           d/b/a Verizon Wireless      Cingular Wireless LLC
(202) 223—9222                 1300 I Street, NW           5565 Glenridge Connector
                               Suite 400—W                 Suite 1700
                               Washington, DC 20005        Atlanta, GA 30342
                               (202) 589—3760              (404) 236—5543

March 27, 2003




                                          23


                                 CERTIFICATE OF SERVICE

      I, Paula Lewis, hereby certify that a copy of the foregoing "Opposition to Application for
Review" has been served this 27°" day of March, 2003, by hand delivery, on the following:

Gregory C. Staple                                    Barry Ohlson
R. Edward Price                                      Interim Legal Advisor
Vinson & Elkins L.LP.                                Office of Commissioner Jonathan S.
1455 Pennsylvania Avenue, NW                         Adelstein
Washington, DC 20004                                 Federal Communications Commission
                                                     445 — 12th Street, SW, Room 8—C302
Jonathan D. Blake                                    Washington, DC 20554
Gerard J. Waldron
Covington & Burling                                  Donald Abelson, Chief
1201 Pennsylvania Avenue, NW                         International Bureau
Washington, DC 20004                                 Federal Communications Commission
                                                     445 — 12th Street, SW, Room 6—C750
Bryan Tramont                                        Washington, DC 20554
Senior Legal Advisor
Office of Chairman Michael K. Powell                 Thomas J. Sugrue, Chief
Federal Communications Commission                    Wireless Telecommunications Bureau
445 — 12"" Street, SW, Room 8—B201                   Federal Communications Commission
Washington, DC 20554                                 445 — 12th Street, SW, Room 3—C252
                                                     Washington, DC 20554
Samuel L. Feder
Legal Advisor                                        Edmond J. Thomas, Chief
Office of Commissioner Kevin Martin                  Office of Engineering and Technology
Federal Communications Commission                    Federal Communications Commission
445 — 12th Street, SW, Room 8—A¢A204                 445 — 12th Street, SW, Room 7—C153
Washington, DC 20554                                 Washington, DC 20554

R. Paul Margie                                       Robert M. Pepper, Chief,
Legal Advisor                                        Policy Development
Office of Commissioner Michael Copps                 Office of Strategic Planning
Federal Communications Commission                      & Policy Analysis
445 — 12th Street, SW, Room 8—¢¥302                  Federal Communications Commission
Washington, DC 20554                                 445 — 12th Street, SW, Room 7—C347
                                                     Washington, DC 20554
Jennifer Manner
Legal Advisor                                        John A. Rogovin
Office of Commissioner Kathleen Abernathy            General Counsel
Federal Communications Commission                    Office of General Counsel
445 — 12th Street, SW, Room 8—B115                   Federal Communications Commission
Washington, DC 20554                                 445 — 12th Street, SW, Room 8—C758
                                                     Washington, DC 20554


David E. Horowitz                      Thomas S. Tycz
Attorney Advisor                       Chief, Satellite Division
Office of General Counsel              International Bureau
Federal Communications Commussion      Federal Communications Commission
445 — 12th Street, SW, Room 8—¢A636    445 — 12th Street, SW, Room 6—A665
Washington, DC 20554                   Washington, DC 20554

Neil A. Dellar                         Christopher Murphy
Office of General Counsel              Senior Legal Advisor
Federal Communications Commussion      International Bureau
445 — 12th Street, SW, Room 8—C818     Federal Communications Commission
Washington, DC 20554                   445 — 12"" Street, SW, Room 6—C:750
                                       Washington, DC 20554
Howard Griboff
Attorney Advisor, Satellite Division   William H. Bell
International Bureau                   International Bureau
Federal Communications Commission      Federal Communications Commission
445 — 12"" Street, SW, Room 6—C467     445 — 12th Street, SW, Room 6—B505
Washington, DC 20554                   Washington, DC 20554

Karl A. Kensinger                      Cheryl Williams
Special Advisor, Satellite Division    Administrative Management Specialist
International Bureau                   International Bureau
Federal Communications Commission      Federal Communications Commission
445 — 12th Street, SW, Room 6—A663     445 — 12th Street, SW, Room 6—A¢A721
Washington, DC 20554                   Washington, DC 20554

Alexandra Field                        James L. Ball
Senior Legal Advisor                   Chief, Policy Division
International Bureau                   International Bureau
Federal Communications Commission      Federal Communications Commission
445 — 12th Street, SW, Room 6—C407     445 — 12th Street, SW, Room 6—A¢A763
Washington, DC 20554                   Washington, DC 20554

Breck J. Blalock                       Thomas Sullivan
Deputy Chief , Policy Division         Assistant Bureau Chief
International Bureau                   Administrative and Management Office
Federal Communications Commussion      International Bureau
445 — 12th Street, SW, Room 6—A¢A764   Federal Communications Commission
Washington, DC 20554                   445 — 12th Street, SW, Room 6—C841
                                       Washington, DC 20554


Richard B. Engelman                   Kathleen O‘Brien Ham
Chief Engineer                        Deputy Bureau Chief
International Bureau                  Wireless Telecommunications Bureau
Federal Communications Commission     Federal Communications Commission
445 — 12th Street, SW, Room 6—¢A668   445 — 12th Street, SW, Room 3—C255
Washington, DC 20554                  Washington, DC 20554

David L. Furth                        Fern J. Jarmulnek
Senior Legal Advisor                  International Bureau
Wireless Telecommunications Bureau    Federal Communications Commission
Federal Communications Commission     445 12"" Street, SW
445 — 12th Street, SW, Room 3—C217    Washington, DC 20554
Washington, DC 20554
                                      Cassandra Thomas
John Branscome                        International Bureau
Attorney Advisor                      Federal Communications Commission
Commercial Wireless Division          445 12"" Street, SW
Wireless Telecommunications Bureau    Washington, DC 20554
Federal Communications Commission
445 — 12th Street, SW, Room 4—¢324
Washington, DC 20554




                                         Sftuain oc
Evan R. Kwerel
Senior Economist
Office of Strategic Planning
  & Policy Division                       Paula Lewis
Federal Communications Commussion
445 — 12" Street, SW, Room 7—C347
Washington, DC 20554



Document Created: 2019-04-08 17:03:52
Document Modified: 2019-04-08 17:03:52

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC