SpaceX Comments on O

COMMENT submitted by Space Exploration Technologies Corp.

Comments of Space Exploration Technologies Corp.

2016-08-15

This document pretains to SAT-LOI-20160428-00041 for Letter of Intent on a Satellite Space Stations filing.

IBFS_SATLOI2016042800041_1146264

                                    Before the
                   FEDERAL COMMUNICATIONS COMMISSION
                              Washington, D.C. 20554


____________________________________
                                    )
In the Matter of                    )
                                    )
WORLDVU SATELLITES LIMITED          )       Call Sign: S2963
                                    )
Petition for a Declaratory Ruling   )       File No. SAT-LOI-20160428-00041
Granting Access to the U.S. Market  )
For the OneWeb NGSO System          )
____________________________________)




          COMMENTS OF SPACE EXPLORATION TECHNOLOGIES CORP.




 William M. Wiltshire                   Tim Hughes
 Paul Caritj                            Senior Vice President and General Counsel
 HARRIS, WILTSHIRE & GRANNIS LLP
 1919 M Street, N.W.                    Patricia Cooper
 Suite 800                              Vice President, Satellite Government
 Washington, DC 20036                    Affairs
 202-730-1300 tel                       SPACE EXPLORATION TECHNOLOGIES CORP.
 202-730-1301 fax                       1030 15th Street, N.W.
                                        Suite 220E
 Counsel to SpaceX                      Washington, DC 20005
                                        202-649-2700 tel
                                        202-649-2701 fax

August 15, 2016


                                                 SUMMARY

        Space Exploration Technologies Corp. (“SpaceX”) hereby comments on the Petition for a

Declaratory Ruling filed by WorldVu Satellites Limited, d/b/a OneWeb (“OneWeb”), requesting

authority to provide Fixed-Satellite Service (“FSS”) in the United States using a proposed non-

geostationary satellite orbit (“NGSO”) constellation authorized by the United Kingdom.1 This is

likely to be only one of several NGSO systems seeking to serve the U.S. using Ku- and Ka-band

frequencies. Each of these NGSO/FSS systems will need to use the same limited bands of

spectrum, and each has the potential to add hundreds or thousands of new satellites to those already

in orbit. Consequently, both efficient spectrum sharing and sophisticated collision avoidance/end-

of-life disposal techniques will be critical to the success of all such constellations and their ability

to deliver advanced broadband services in the United States and around the world.

        New technologies are now available that allow satellites to narrow their beam widths and

shape their beam contours for greater capacity, throughput, and spectrum efficiency. These

capabilities, if effectively employed by NGSO constellations, can address some of the challenges

that stymied the NGSO/FSS broadband systems proposed in the past. Unfortunately, OneWeb has

chosen not to include many of these technologies in its proposed system. As a result, OneWeb’s

system would not only make inefficient use of the spectrum it seeks to use, but may also prevent

other NGSO/FSS systems from efficiently sharing the available spectrum. The Commission must

carefully consider these issues to determine whether granting market access under these

circumstances would serve the public interest.




1
    WorldVu Satellites Limited, Petition for a Declaratory Ruling Granting Access to the U.S. Market for the
    OneWeb System, IBFS File No. SAT-LOI-20160428-00041 (filed April 28, 2016) (“OneWeb Petition”).


        As is made clear in its filing, OneWeb has declined to make core design decisions that

leverage available adaptive technologies that allow for efficient spectrum usage. For example,

OneWeb’s proposed system would serve customers using ultra-wide downlink beams rather than

narrower spot beams that could have both increased capacity through greater frequency reuse and

provided more options for spectrum sharing. Further, because the beams from one satellite in the

proposed system generally do not overlap with beams from others, OneWeb cannot switch a

customer to an alternative satellite when necessary to avoid interference from and to other

NGSO/FSS systems. Such choices fail to make efficient use of spectrum, and result in a higher

likelihood of interference with and lower flexibility to share spectrum among all proposed

NGSO/FSS systems. Further, it appears that the OneWeb system, once launched, cannot be

expanded by adding satellites to expand capacity or upgraded to improve coexistence with other

NGSO systems. The end result would compromise the Commission’s dual goals of promoting

efficient usage of spectrum and maximizing broadband service to the public.

        Historically, when NGSO/FSS systems were not able to coordinate shared use of spectrum,

the Commission divided the available bands into segments, with each operator assigned a portion

of the spectrum. OneWeb has asked the Commission instead to apply a regime based on avoidance

of in-line interference events and coordination. However, this more efficient approach of in-line

avoidance will put a high premium on successful spectrum coordination among NGSO/FSS

systems, a goal made more difficult to achieve given the limited technology implemented in

OneWeb’s design.

        OneWeb states in its Petition that “it is likely that the constellation might not get completed

at all” if it is limited to operating with just a portion of the spectrum it seeks (even if a Commission



                                                   ii


decision to segment bands were applied only while operating over the United States).2 In essence,

by electing to design its proposed NGSO/FSS system with limited technical capabilities, OneWeb

signals that it may have made its own business model untenable. Further, OneWeb is requesting

that the Commission authorize its own system at the expense of other prospective NGSO/FSS

constellations. Because its system is not designed to coordinate readily with other NGSO/FSS

systems, such an authorization would sacrifice the benefits of a competitive NGSO environment

for broadband service diversity in the U.S.

        Separate from spectrum efficiency, OneWeb has not provided any information on its plans

for mitigating orbital debris and disposing of satellites at end-of-life. OneWeb seeks an exception

to the general requirement to provide such information because it will be subject to regulatory

oversight in the United Kingdom. But the Commission has made clear that this exception only

applies where the non-U.S. licensing authority has reviewed and affirmatively approved the

operator’s specific debris mitigation plan.3 OneWeb has provided no evidence that it has submitted

such a plan to the U.K., much less received approval of that plan. Given the size of OneWeb’s

proposed constellation, the issues of orbital debris and post-mission disposal are too important to

overall space safety for the Commission to defer to another country’s regulator. Rather, the

Commission should require OneWeb to submit this information, and give all interested parties an

opportunity to review and comment upon it, before taking any further action in this proceeding.




2
    See OneWeb Petition at 19.
3
    See, e.g., John K. Hane, Esq., 26 FCC Rcd. 7996 (IB 2011) (dismissing satellite application where operator
    failed to state whether the foreign regulator had “reviewed and affirmatively approved the specific debris
    mitigation plans” for the satellite).
                                                        iii


        The Commission’s has indicated that it intends to update its rules for NGSO systems, which

were put in place over a decade ago and were adopted based on satellite technology and system

designs proposed nearly a decade before that. The Commission has indicated that it will soon

commence a rulemaking proceeding to update those rules.4 That upcoming proceeding will

provide an opportunity to implement a regime better suited to an environment in which

constellations of hundreds or thousands of satellites employing sophisticated technologies must

share limited spectrum resources and safeguard the space environment for all who seek to make

productive use of it. At a minimum, the Commission should apply any eventual updated rules to

this application, consistent with precedent in prior NGSO/FSS processing rounds.




4
    See Matt Daneman, “Satellite/5G Sharing of 28 GHz Band Seen As Inevitable,” COMMUNICATIONS DAILY
    (Mar. 3, 2016).

                                                   iv


                                                       TABLE OF CONTENTS

                                                                                                                                                     Page




SUMMARY .................................................................................................................................... i
DISCUSSION ................................................................................................................................ 3
   A. AFTER SEVERAL FALSE STARTS, THE TIME FOR NGSO BROADBAND SYSTEMS HAS
      ARRIVED ........................................................................................................................................... 3
   B. ONEWEB IS LIKELY TO BE ONLY ONE OF SEVERAL NGSO SYSTEMS, AND MUST BE
      CAPABLE OF SHARING VALUABLE SPECTRUM RESOURCES EFFICIENTLY ................................. 4
      1.     Spectrum for NGSO Satellite Operations Is an Extremely Scarce and Valuable
             Resource ...................................................................................................................................... 6
      2.     OneWeb’s System Design Does Not Include Advanced Capabilities Necessary to
             Facilitate Efficient Spectrum Sharing ..................................................................................... 8
           a. Large satellite downlink beams limit frequency reuse ................................................. 8
           b. Beams that cannot be steered or shaped further limit operational flexibility ............. 12
           c. Poor design wastes valuable spectrum ....................................................................... 14
      3.     By Limiting Spectrum Sharing Options, OneWeb Will Increase the Likelihood
             of Band Segmentation—to the Detriment of all NGSO/FSS Operators and
             OneWeb Itself........................................................................................................................... 15
   C. THE COMMISSION SHOULD REQUIRE ONEWEB TO SUBMIT COMPLETE INFORMATION
      ON ORBITAL DEBRIS MITIGATION AND END-OF-LIFE DISPOSAL PLANS BEFORE
      ACTING ON THE PETITION ............................................................................................................. 17
CONCLUSION ........................................................................................................................... 22


                                            Before the
                  FEDERAL COMMUNICATIONS COMMISSION
                                    Washington, D.C. 20554

____________________________________
                                    )
In the Matter of                    )
                                    )
WORLDVU SATELLITES LIMITED          )                 Call Sign: S2963
                                    )
Petition for a Declaratory Ruling   )                 File No. SAT-LOI-20160428-00041
Granting Access to the U.S. Market  )
For the OneWeb NGSO System          )
____________________________________)


           COMMENTS OF SPACE EXPLORATION TECHNOLOGIES CORP.

        SpaceX hereby comments on the Petition for a Declaratory Ruling filed by OneWeb

requesting authority to provide FSS in the United States using a proposed NGSO constellation

authorized by the United Kingdom.5

        OneWeb’s proposed system is likely to be only one of several NGSO systems seeking to

serve the United States using Ku- and Ka-band frequencies. Each of these systems will need to

use the same limited bands of spectrum, and each has the potential to add hundreds or thousands

of new satellites to those already in orbit. Consequently, both efficient spectrum sharing and

sophisticated collision avoidance/end-of-life disposal techniques will be critical to the success of

all such constellations and their ability to provide advanced broadband services in the United States

and around the world.

        New technologies are now available that, if effectively employed by NGSO constellations,

can address the challenges that stymied the NGSO/FSS broadband systems proposed in the past.




5
    OneWeb Petition.


Unfortunately, however, OneWeb has chosen not to include many of these technologies in its

proposed system. As a result, OneWeb’s system would not only make inefficient use of the

spectrum it seeks to use, but may also prevent other NGSO systems from efficiently sharing the

available spectrum. The Commission must carefully consider these issues to determine whether

granting market access under these circumstances would serve the public interest.

        In addition, the record in this proceeding does not include any information on OneWeb’s

orbital debris mitigation plans, or any indication that another licensing authority has assessed and

approved such plans. The Commission must require OneWeb to submit this information, and give

all interested parties an opportunity to review and comment upon it, before taking any further

action in this proceeding.

        The Commission’s rules for NGSO systems were emplaced more than a decade ago, and

were adopted based on satellite technology and system designs proposed nearly a decade before

that. The Commission has announced that it will soon commence a rulemaking proceeding to

update those rules.6 That upcoming proceeding will provide an opportunity to implement a regime

better suited to an environment in which constellations of hundreds or thousands of satellites

employing sophisticated technologies must share limited spectrum resources and safeguard the

space environment for all who seek to make productive use of it. Any action in this proceeding

should explicitly incorporate the outcome of the rulemaking, consistent with Commission practice




6
    See Matt Daneman, “Satellite/5G Sharing of 28 GHz Band Seen As Inevitable,” COMMUNICATIONS DAILY
    (Mar. 3, 2016).

                                                   2


in prior NGSO/FSS processing rounds.7 This will ensure that the Commission’s rules do not

inadvertently saddle modern NGSO/FSS systems with an outdated regulatory framework that may

no longer be tailored to best serve the public interest.

                                                  DISCUSSION

A. AFTER SEVERAL FALSE STARTS, THE TIME FOR NGSO BROADBAND SYSTEMS HAS
   ARRIVED

        Since the early 1990s, the concept of using a constellation of NGSO/FSS satellites to

provide affordable, ubiquitous, low-latency communications connectivity to all areas of the world

has been a tantalizing possibility. Systems such as those proposed by Teledesic8 and SkyBridge9

had promised to bring connectivity to users in previously underserved or unserved areas. Using

Ka- and Ku-band spectrum and satellite constellations that were considered to be large at the time,

the proposed NGSO systems aspired to create a truly connected world. However, these first-

generation proposals never came to fruition, as they could not overcome a combination of technical

and financial challenges.




7
    See, e.g., Teledesic Corp., 12 FCC Rcd. 3154, ¶ 36 (IB 1997) (“Teledesic Authorization Order”) (conditioning
    Ka-band NGSO/FSS authorization on compliance with service rules to be adopted in a then-pending
    rulemaking); Amendment of the Commission’s Space Station Licensing Rules and Policies, 18 FCC Rcd. 10760,
    ¶ 275 (2003) (“Space Station Licensing Revision Order”) (stating that newly-adopted rules would be applied to
    then-pending applications in NGSO/FSS processing round).
8
    See Teledesic Authorization Order, supra (authorizing launch and operation of Ka-band NGSO/FSS
    constellation of 840 satellites); Teledesic LLC, 14 FCC Rcd. 2261 (IB 1999) (reducing constellation to 288
    satellites). Teledesic later sought to reduce its constellation to 30 satellites (see Public Notice, Rep. No. SAT-
    00101 (Feb. 14, 2002)), but surrendered its authorization in 2003 while that application was still pending.
9
    See SkyBridge L.L.C., 20 FCC Rcd. 12389 (Int’l Bur. 2005) (authorizing launch and operation of a Ku-band
    NGSO/FSS constellation of 80 satellites). SkyBridge declined to accept this authorization, which was issued
    more than eight years after it filed its initial application in 1997.

                                                           3


         Today, a new generation of technology, coupled with near-insatiable demand for

broadband, as well as innovation in satellite, ground systems, and launch technologies, has spurred

a host of newly proposed NGSO/FSS systems to provide global broadband connectivity. For

example, phased array antennas and adaptive beam-forming strategies allow satellites to target

narrow coverage areas more precisely while enabling Earth stations to track satellites moving

through the sky and then seamlessly transition to the next one appearing over the horizon. More

powerful computing and software capabilities enable operators to allocate resources in real time,

so that capacity can be placed where it is most needed and energy can be directed away from areas

where it might cause interference to other spectrum users. This on-orbit flexibility not only

facilitates spectrum sharing among satellite systems (both GSO and NGSO), but also gives a

system operator the ability to modify its service as necessary to meet rapidly changing customer

demands. In addition, increased satellite launch capacity, coupled with a faster cadence of launch

activity at lower costs than when earlier NGSO systems were conceived, makes the deployment

and replenishment of certain systems more feasible.

B. ONEWEB IS LIKELY TO BE ONLY ONE OF SEVERAL NGSO SYSTEMS, AND MUST BE
   CAPABLE OF SHARING VALUABLE SPECTRUM RESOURCES EFFICIENTLY

         Although OneWeb’s Petition precipitated a processing round for those proposing NGSO-

like operations in the Ku- and Ka-bands,10 it is not the only current-generation operator to apply

for the right to provide broadband NGSO/FSS service in the U.S. using this spectrum. O3b is

already authorized to provide such service—and is actually doing so—using a medium Earth orbit




10
     See Public Notice, “OneWeb Petition Accepted for Filing,” DA 16-804 (rel. July 15, 2016).

                                                        4


(“MEO”) constellation of twelve Ka-band satellites.11 Moreover, in the past twenty-four months

alone, administrations around the world have submitted to the ITU requests for coordination for

more than twenty-five NGSO systems operating in the Ku- and/or Ka-bands.

         Given this wave of interest in NGSO/FSS constellations, the Commission must anticipate

that several operators may apply to participate in the upcoming NGSO/FSS processing round.

Competition among broadband satellite NGSO/FSS systems will drive innovation in space

systems and ground equipment technology and operations, resulting in better broadband services

at lower cost for consumers.12 The ability to share available spectrum in an efficient manner

among NGSO system applicants will be a crucial prerequisite to optimizing broadband speeds and

increasing broadband availability for customers in the U.S. and around the world. In addition,

large NGSO/FSS constellations will add hundreds or thousands of satellites in orbit, placing an

even higher premium on effective orbital debris mitigation plans, space awareness capabilities,

and end-of-life disposal procedures.

         OneWeb’s Petition must be evaluated in the larger context of the public interest in

maximizing the productive use of valuable public resources by multiple systems, as well as the

Commission’s other rules and policies. Unfortunately, as discussed below, OneWeb’s chosen

system design is inconsistent with efficient spectrum use and spectrum sharing, and its Petition




11
     See Grant Stamp, IBFS File Nos. SAT-LOI-20141029-00118 and SAT-AMD-20150115-00004 (Jan. 22, 2015).
     O3b has also filed a petition to increase the number of satellites in its system authorized to access the U.S.
     market to a total of 20. See IBFS File No. SAT-MOD-20160624-00060.
12
     See, e.g., Connecting America: The National Broadband Plan, at 36, § 4.1 (2010) (“Competition is crucial for
     promoting consumer welfare and spurring innovation and investment in broadband access networks.
     Competition provides consumers the benefits of choice, better service and lower prices.”), available at
     https://transition fcc.gov/national-broadband-plan/national-broadband-plan.pdf.

                                                         5


does not allow the Commission or other interested parties to evaluate the physical risk its system

presents to other systems in space.

     1. Spectrum for NGSO Satellite Operations Is an Extremely Scarce and Valuable
        Resource

         OneWeb proposes to use spectrum in the Ku- and Ka-bands that has been allocated

internationally for FSS operations, including some portions that have been specifically designated

for use by NGSO systems. This resource is finite, and its usefulness should be maximized.

         Commission policy has long recognized that “[m]echanisms to ensure spectrum efficiency

are a high regulatory priority.”13 The Commission has found that, “[b]ecause the radio spectrum

is a limited resource, as a general principle, all Commission licensees should use spectrum in the

most efficient manner possible. This is particularly true where different services share the same

radio spectrum resource and inefficient use by one service could foreclose or severely limit use by

another service.”14 Applying this policy, the Commission consistently pays special attention to

spectral efficiency when considering new rules, license applications, and other regulatory

decisions. For example, in 2003, while noting that “new satellites are capable of generating

multiple narrow-beam spot beams” and that “such space stations reuse frequencies in spatially

independent beams rather than by using orthogonally polarized signals within a single beam,” the




13
     A Re-Examination of Tech. Regulations, 99 F.C.C.2d 903, ¶ 27 (1984).
14
     FWCC Request for Declaratory Ruling on Partial-Band Licensing of Earth Stations, 15 FCC Rcd. 23127, ¶ 26
     (2000). See also Spectrum Policy Task Force Seeks Public Comment on Issues Related to Commission's
     Spectrum Policies, 17 FCC Rcd. 10560, ¶ 16 (2002) (“Due to the ever increasing spectrum demand, increased
     spectral efficiency will be needed to accommodate future growth. To this end, it is important that spectrum
     policies create positive incentives to make ‘efficient’ use of the spectrum resource and to continue the
     development of spectrally efficient technologies.”).

                                                        6


Commission revised its frequency reuse rules to account for such beams in order to “encourage

deployment of new, technologically innovative spot-beam satellites.”15

         This approach is a necessary response to the simple fact that spectrum is a finite and highly

valuable resource, but it is also compelled by the Communications Act. As the Commission has

observed, considering an application “without regard to the efficiency of the applicant's proposed

use of the spectrum, has the potential to produce anomalous results that would seem to contravene

the original statutory mandate of section 307(b) ‘to provide a fair, efficient, and equitable

distribution of radio service.’”16 Similarly, the Commission has held that the public interest, the

lodestar of all Commission decision-making, is best served “by making efficient use of finite

spectrum and orbital resources.”17

         In the context of NGSO processing rounds, the Commission has recognized that spectrum

sharing policies should ensure that all applicants have equal access to spectrum, avoid any

spectrum warehousing by non-implemented NGSO/FSS systems at the expense of operational

systems, and incorporate sufficient flexibility to promote and accommodate spectrum coordination

among operating systems.18 Given the advent of new space-based and ground technologies,

spectrum sharing is most efficiently managed through the use of highly intelligent and flexible




15
     Space Station Licensing Revision Order, ¶ 262.
16
     Applications of Faye & Richard Tuck, Inc., et al., 3 FCC Rcd. 5374, ¶ 4 (1988).
17
     Amendment of Part 25 of the Commission's Rules to Establish Rules & Policies Pertaining to the Second
     Processing Round of the Non-Voice, Non-Geostationary Mobile Satellite Serv., 13 FCC Rcd. 9111, ¶ 136
     (1997).
18
     Establishment of Policies and Service Rules for the Non-Geostationary Satellite Orbit, Fixed Satellite Service in
     the Ku-Band, 17 FCC Rcd. 7841, ¶¶ 9, 27 (2002) (“Ku-band NGSO Sharing Order”).

                                                          7


satellites, as this expands the range of potential sharing strategies available to the operators

involved.

   2. OneWeb’s System Design Does Not Include Advanced Capabilities Necessary to
      Facilitate Efficient Spectrum Sharing

       OneWeb has made specific design choices that limit the spectral efficiency and flexibility

of its system. Its system lacks currently available technology that could have enabled more

effective frequency re-use and therefore provide more capacity to more customers, as well as create

more options for coordinating with other NGSO systems. The decision not to invest in such

advanced technology not only limits OneWeb’s ability to deliver on the full potential of

NGSO/FSS broadband service, but also imposes harmful and unnecessary burdens on other

NGSO/FSS systems.       There are several examples of technologies now available, but not

incorporated by OneWeb, that would constrain both spectral efficiency and operational flexibility.

       a. Large satellite downlink beams limit frequency reuse

       The ability to reuse a frequency as many times as possible across a given service area is

critical to achieving spectral efficiency. With a very limited amount of spectrum allocated for use

by all FSS systems and numerous current-generation NGSO systems proposing to share that

spectrum, spectral efficiency will depend on the ability to reuse downlink spectrum by packing

more beams into the same service area.

       In the simple case illustrated in Figure 1, satellite systems reuse spectrum by alternating

the frequencies used for downlink beams so that no two adjacent beams are using the same

frequencies, with each color indicating a beam using a different block of spectrum. As with

terrestrial systems, this strategy of dividing and reusing the frequencies not only increases

spectrum efficiency within a given service area, it also yields a commensurate increase in system

                                                8


capacity, allowing more customers to be served, faster throughput speeds, or both. Analogous to

the generational improvements in terrestrial cellular technology, the more an NGSO/FSS system

operator can narrow the size of its beams and develop more sophisticated reuse patterns, the greater

the spectral efficiency and corresponding enhancement of service capability.

         NGSO systems have an inherent advantage over

traditional GSO satellites in these spectral reuse dynamics

because they are tens of thousands of miles closer to the Earth

than GSO satellites,19 and their beams have less distance over

which they would spread before they reach the Earth. Thus, one

would expect that a low-Earth orbiting NGSO system operating

at an altitude of only 1,200 km, such as that proposed by OneWeb,                 Figure 1. Sample 4x Frequency Reuse
                                                                                  Pattern
would use quite small downlink beams that could be densely

packed to maximize capacity over a given service area. That is not the case. While each OneWeb

satellite has 16 downlink beams serving customers,20 they are large beams that fail to optimize the

capacity of OneWeb’s proposed system. Rather than tightly-packed narrow beams, each OneWeb

beam covers approximately 70 km by 1,140 km,21 for a total area of approximately 80,000 km2 or




19
     GSO satellites operate at an altitude of approximately 36,000 km (or 22,350 miles). OneWeb proposes to
     operate at an altitude of just 1,200 km (or 745 miles).
20
     See OneWeb Petition, Technical Appendix at 7.
21
     See id. at 12 (Figure A.3-1 shows downlink beams projected onto Earth covering approximately three degrees
     by 50 degrees, corresponding to a spot size of approximately 70 km by 1140 km for a satellite at an altitude of
     1,200 km).

                                                          9


roughly the size of South Carolina.22 This footprint is two or more times the size of the beams

used by GSO broadband satellites operated by ViaSat and EchoStar, which are located over 20,000

miles higher in space.23

         Such wide beam design significantly constrains the service capability of the proposed

OneWeb system. Using information from the OneWeb Petition and reasonable estimates for

operating parameters, link budget calculations indicate an approximate total throughput for each

OneWeb downlink beam of just 422 Mbps.24 Applying a moderate estimate of average usage per

customer of 1 Mbps,25 at this throughput level, each beam would support service to just 422 active

users in an area the size of South Carolina. In that state alone, over 850,000 people (or 18% of the




22
     See U.S. Census Bureau, “Land and Water Area of States and Other Entities: 2008” (showing South Carolina
     has a land area of 77,881 km2), available at
     https://view.officeapps.live.com/op/view.aspx?src=http%3A%2F%2Fwww2.census.gov%2Flibrary%2Fpublica
     tions%2F2011%2Fcompendia%2Fstatab%2F131ed%2Ftables%2F12s0358.xls.
23
     See Letter from John P. Janka to Marlene H. Dortch, GN Docket No. 14-177 et al., Attachment 1, Table 2 (Apr.
     21, 2016) (showing beam areas of 31,000 km2 for ViaSat’s second and third generation satellites and 35640 km2
     for EchoStar’s Jupiter 97 satellite).
24
     See Exhibit 1 attached hereto. While not all of the parameters used in this exhibit may precisely conform to
     OneWeb’s intended operations, they represent a reasonable approximation of the throughput of a Ku-band
     downlink beam.
25
     The necessary capacity per user depends on a number of factors including peak utilization per user, and
     appropriate margins for spare capacity, which can vary depending on system and user characteristics, including
     connection speed. But 1 Mbps is likely a conservative figure. See, e.g., White Paper, “Defining Broadband
     Speeds: Deriving Required Capacity in Access Networks,” ADTRAN (Jan. 4, 2010) at 18-19 and Table 6
     (projecting per household capacity requirement of 2.4 Mbps in 2015), available at
     www ntia.doc.gov/files/ntia/broadbandgrants/comments/rfi2/WP Defining Broadband Speeds Attach%20to%
     20RFI%20Letter%20Final.doc; Report, “Forecast of Residential Fixed Broadband and Subscription Video
     Requirements,” ACG Research (Dec. 4, 2014) at 12 (estimating per household capacity requirements of 2.5
     Mbps in 2014), available at http://acgcc.com/wp-content/uploads/2014/12/Forecast-of-Residential-Fixed-
     Broadband-Requirements-2014.pdf.

                                                         10


population) lack access to adequate fixed broadband service.26 Extending this analysis nationwide,

OneWeb’s proposed system would be able to support fewer than 47,000 active users across the 8

million square kilometers contained in the contiguous United States.27 Over time, as users demand

even greater broadband capacity, the number of U.S. consumers that OneWeb could serve would

diminish as well. An NGSO system with such limited capacity would barely make a dent in

serving the nearly 34 million Americans that represent the Digital Divide.28

         Designing and constructing a satellite with a large number of narrow up- and downlink

beams may be more challenging or expensive than building one with a much smaller number of

much larger beams, but that investment is necessary to maximize the broadband service that can

be provided using a very limited amount of FSS spectrum. Just as OneWeb’s choice to employ a

lower-capacity beam configuration will limit its ability to serve substantial numbers of customers,

it also will constrain its ability to share spectrum with the additional NGSO/FSS systems expected

to share the same spectrum. Operators with more beams available maximize their flexibility in

determining where to provide service, aiding spectrum sharing among NGSO/FSS systems. For




26
     See Inquiry Concerning the Deployment of Advanced Telecommunications Capability to All Americans in a
     Reasonable and Timely Fashion, and Possible Steps to Accelerate Such Deployment Pursuant to Section 706 of
     the Telecommunications Act of 1996, as Amended by the Broadband Data Improvement Act, 31 FCC Rcd. 699,
     Appendix D (2016) (“2016 Broadband Deployment Report”).
27
     See United States Census Bureau, State Area Measurements and Internal Point Coordinates (2012),
     https://www.census.gov/geo/reference/state-area.html. Assuming five percent overlap of adjacent beams at the
     Eastern and Western edges (i.e., a reduction of the beam size by a total of ten percent), the calculation would be
     the area of CONUS (8,000,000 km2) divided by the area of each OneWeb downlink beam after reduction to
     account for slight overlapping (0.9 times 80,000 km2) multiplied by 422 users per beam, for a total of 46,889
     active users on average. For purposes of this calculation, we did not attempt to offset the number of users
     supported in a beam in the areas of overlap, though that would tend to reduce the total.
28
     See 2016 Broadband Deployment Report, ¶ 4 and Appendix D (finding that one in ten Americans lacks access
     to 25 Mbps/3 Mbps broadband, including more than 39 percent of Americans living in rural areas lacking
     access to advanced telecommunications capability).
                                                          11


example, two operators with smaller beams could coordinate their spectrum usage during times

when their satellites pass in close proximity to one another by having one utilize only the beams

oriented to the West and the other using only the beams oriented to the East. By comparison, a

system with one larger beam preempts the use of all frequencies used in that beam over its entire

footprint at all times. Accordingly, failing to use smaller beams is not only inefficient at the system

level, but imposes inefficiencies that extend to all other NGSO/FSS systems sharing the band.

         b. Beams that cannot be steered or shaped further limit operational flexibility

         Although OneWeb expects to use phased array technology for the antennas on its user

terminals,29 its spacecraft rely upon older “bent pipe” technology that does not permit formation

of its service beams. In addition, OneWeb has not included the ability to steer those beams over a

range of locations.30 Both are well-known, tested satellite technologies and were features of

NGSO/FSS systems proposed more than 20 years ago.31 As a result, the Ku-band downlink beams

remain essentially static. Indeed, it is this lack of ability to move or reshape individual beams that

necessitates OneWeb’s proposed “progressive pitch” maneuver, in which the entire satellite is

reoriented as it nears the equator in order to protect Ku-band GSO satellites from interference by




29
     See, e.g., OneWeb Petition, Technical Appendix at 10 (“user terminals will employ mechanically steerable
     parabolic reflector antennas, electronically steerable phased array antennas or other beam steering technology”).
30
     Notably, OneWeb included steering capability for the Ka-band downlink beams used to communicate with its
     gateway Earth stations, but for some reason chose not to do the same with respect to its Ku-band service links.
31
     Mark A. Sturza, Teledesic Corporation, The Teledesic Satellite System: Overview and Design Trades, at 7,
     http://www.3csysco.com/pubs/the%20teledesic%20satellite%20system%20-
     %20overview%20and%20design%20trades.pdf.

                                                         12


creating a more favorable angle with the geostationary arc and complying with the Commission’s

limits on equivalent power flux-density.32

         This lack of operational flexibility further limits the proposed system’s ability to share

spectrum with other NGSO/FSS constellations. The proposed system cannot, for example, reorient

its beams in a way that would allow geographic separation from the beam of another NGSO

system’s spacecraft as it passes nearby.                Moreover, the proposed OneWeb satellites lack

overlapping beams—or beams that can be steered so that they overlap—which are important in

avoiding potential interference during “in-line events” with other NGSO systems.33 A system

design that allows a customer to be served by more than one satellite at a time (a concept called

“satellite diversity”) enables the operator to determine which specific satellite to use based on

whether it would cause or receive interference from a satellite of another system. As explained by

the Commission, “[w]ith satellite diversity, NGSO FSS systems can avoid an in-line interference

event by selecting another visible satellite within their system constellation (performing a hand-

over process) whenever the current satellite approaches the in-line event with a satellite operating

in another NGSO FSS system constellation.”34 But it appears that OneWeb’s Ku-band downlink

beams from satellites in the same and adjacent orbital planes typically overlap only at the




32
     See OneWeb Petition, Technical Appendix at 30-32.
33
     An in-line event occurs when satellites from two different constellations physically align with an Earth station
     communicating with one of those systems within a certain minimal level of angular separation.
34
     Establishment of Policies and Service Rules for the Non-Geostationary Satellite Orbit, Fixed Satellite Service in
     the Ka-Band, 18 FCC Rcd. 14708, ¶ 44 (2003) (“Ka-band NGSO Sharing Order”).

                                                          13


outermost Eastern and Western edges ofthose beams."" This lack ofsatellite diversity significantly

limits the options available for avoiding potential interference to and from other NGSO/FSS

systems.

         c. Poor design wastes valuable spectrum

         OneWeb also has elected not to invest in advanced processing power and filtering

capabilities for its satellite system. In doing so, the OneWeb system leaves valuable FSS spectrum

underutilized. For example, its Ka—band downlink beams only utilize 125 MHz of spectrum, but

actually occupy 155 MHz "to allow for on—board frequency translation and associated filter

implementations."" As shown in the illustration below, this arrangement also leaves a total of 60




    |on|on|m(om|
MHz of spectrum at the upper edges of the bands unused.




   178                                                                86    iss                                       193
                                      Figure 2. OneWeb Ka—band Downlink Channels


In other words, in order to simplify and reduce the cost of its satellites, OneWeb‘s system will

Teave fallow approximately 20 percent ofthis valuable FSS downlink spectrum.




55— See OneWeb Petition, Technical Appendix at 15—16 (discussion and illustration of downlink beams). See also
    id., Annex 1, at Al—14 (discussingan EPFD model parameter setting that captures the "[rJare situation when
    operational satellites have overlapping service areas and overlapping frequencies"). The one exception is when
    satellites approach the equator, and the "progressive pitch" technique is used to reorient the entire satellite and
    create a slight overlap to allow an Earth station to communicate with a satellite less in line with the GSO are.
    See Letter from Kalpak S. Gude to MarleneH. Dortch, TBES File No. SAT—LOT—20160428—00041, OneWeb
    Response at 3—4 (June 24 2016). Even then, OneWeb apparently will tum off overlapping beams in order to
    comply with applicable EPFD limits. 1d.
5 See OneWeb Petition, Technical Appendix at 7 n.6.
                                                          14


     3. By Limiting Spectrum Sharing Options, OneWeb Will Increase the Likelihood of
        Band Segmentation—to the Detriment of all NGSO/FSS Operators and OneWeb
        Itself

         In the absence of coordination agreements among NGSO/FSS operators, the Commission

has applied two approaches to spectrum sharing in the Ku- and Ka-bands. One involves simply

splitting the spectrum among the eligible NGSO systems—an approach commonly referred to as

band segmentation.37          Alternatively, the Commission may apply an approach based upon

avoidance of in-line interference events, in which NGSO systems are allowed to use all authorized

spectrum except when their satellites and Earth stations align in a specified manner—at which

point they revert by default to band segmentation in the absence of a coordinated arrangement.38

         SpaceX agrees with OneWeb that the Commission should not reflexively impose the

automatic band segmentation approach upon the current generation of participants in the upcoming

NGSO processing round, and should instead proceed with a regime based on avoidance of in-line

interference events.39 Yet this more efficient approach will put a high premium on successful

spectrum coordination among NGSO/FSS systems, a goal made more difficult to achieve given

OneWeb’s proposed limited design. When the Commission adopted its current avoidance of in-

line interference approach, it anticipated that in-line events would not be a problem “90% or more




37
     See, e.g., 47 C.F.R. § 25.157(e) (establishing certain band segmentation procedures if there is not sufficient
     spectrum available to accommodate all qualified NGSO applicants).
38
     See, e.g., 47 C.F.R. § 25.261 (Ka-band spectrum); Ku-band NGSO Sharing Order, ¶¶ 52-55; Ka-band NGSO
     Sharing Order, ¶¶ 18-21.
39
     See OneWeb Petition at 17-19.

                                                          15


of the possible operating time”40 or at least a “majority of the time.”41 These analyses were made

in the context of first-generation NGSO/FSS systems with constellations of just tens of satellites

apiece.42 However, with numerous current-generation NGSO/FSS constellations each proposing

to deploy hundreds or even thousands of satellites, in-line events are likely to be the norm rather

than the exception. In-line interference is an even greater risk for a system designed like

OneWeb’s that uses static beams that generally cannot serve customers from more than one

satellite. Further, it appears that the OneWeb system, once launched, cannot be expanded by

adding satellites for increased capacity or upgraded to improve coexistence with other NGSO

systems. OneWeb’s system and technology design choices may cause all NGSO/FSS systems to

be relegated to the less-efficient band segmentation approach some or all of the time.

         Yet OneWeb’s own Petition makes clear that it does not have a business case to support its

system if it is granted access to only a segment of the spectrum it seeks.

         OneWeb cannot maintain a high-speed broadband service across the entire globe if
         it is limited (even if only for the United States) to operating its satellite constellation
         in just one-third (or less) of the full Ku-band spectrum that it needs for viable
         operations. . . . [W]ere such a segmentation requirement to be imposed on OneWeb,
         it is likely that the constellation might not get completed at all.43




40
     Ka-band NGSO Sharing Order, ¶ 19.
41
     Ku-band NGSO Sharing Order, ¶ 30.
42
     See, e.g., Establishment of Policies and Service Rules for the Non-Geostationary Satellite Orbit, Fixed Satellite
     Service in the Ku-Band, 16 FCC Rcd. 9680, Appendix D (2001) (discussing seven proposed Ku-band NGSO
     systems with from 13 to 80 satellites in the constellation); Establishment of Policies and Service Rules for the
     Non-Geostationary Satellite Orbit, Fixed Satellite Service in the Ka-Band, 17 FCC Rcd. 2807, Appendix D
     (2002) (discussing five proposed Ka-band NGSO systems with 15 to 96 satellites in the constellation).
43
     OneWeb Petition at 19 (emphasis added).

                                                          16


In essence, by electing to design its proposed NGSO system with limited technical capabilities,

OneWeb signals that it may have made its own business model untenable. More importantly, it

also would needlessly have made operation with additional NGSO/FSS systems more challenging,

further compromising efficient spectrum sharing for an entire class of proposed NGSO/FSS

systems. In effect, OneWeb is requesting that the Commission authorize its own limited proposed

system at the expense of other prospective NGSO/FSS constellations that do employ technologies

that are efficient and sacrifice the benefits of a competitive NGSO/FSS environment for broadband

service diversity in the U.S.

C. THE COMMISSION SHOULD REQUIRE ONEWEB TO SUBMIT COMPLETE INFORMATION ON
   ORBITAL DEBRIS MITIGATION AND END-OF-LIFE DISPOSAL PLANS BEFORE ACTING ON
   THE PETITION

         The OneWeb Petition raises orbital debris and space operational safety concerns. The

danger posed by orbital debris can be thought of “fundamentally as a long-term environmental

problem” as well as “potentially affecting U.S. security interests, especially in its ability to

interfere with consistent satellite support to U.S. military and intelligence organizations.”44 As the

Commission has found, “orbital debris poses a potential risk to the continued reliable use of these

orbital regimes for space-based services and operations, as well as to the continued safety of

persons and property in space and on the surface of the Earth.”45 One mishap or unforeseen

problem in space can have ramifications for the broader space environment lasting decades. Thus,

orbital debris mitigation and post-mission disposal are issues of great significance to the entire




44
     Congressional Research Service, “Threats to U.S. National Security Interests in Space: Orbital Debris
     Mitigation and Removal,” at 13 (Jan. 8, 2014), available at https://www fas.org/sgp/crs/natsec/R43353.pdf.
45
     Mitigation of Orbital Debris, 19 FCC Rcd 11567, ¶ 4 (2004) (“Orbital Debris Order”).

                                                        17


space sector, including the governmental and commercial satellite systems of all nations operating

at virtually all orbits, as well as satellite launch providers and the U.S. and international customers

who depend upon their services.

           When the Commission adopted orbital debris mitigation rules, it concluded that the public

interest is served by requiring those seeking access to the U.S. market “to submit the same

information concerning the orbital debris mitigation plans of the non-U.S-licensed space station

as that submitted by U.S.-licensed space stations.”46 It found that some consideration of this issue

is appropriate, “regardless of the licensing Administration, in order to ensure that the satellite

communications activity that we authorize does not involve substantial safety concerns or

activities that may be detrimental to space operations.”47 Accordingly, the Commission’s rules

generally require those seeking access to the U.S. market to provide a comprehensive description

of the design and operational strategies they intend to use to mitigate orbital debris, including post-

mission disposal plans for space stations at the end of life.48

           OneWeb has not submitted such information with its Petition. Instead, it argued that it is

subject to an exception to the general rule (codified in Section 25.114(d)(14)(v) of the

Commission’s rules) because its system “is subject to direct and effective regulatory oversight by

the United Kingdom’s regulatory authorities, including particularly the U.K. Space Agency, with




46
     Id., ¶ 93.
47
     Id.
48
     See 47 C.F.R. §§ 25.114(d)(14) (discussing required orbital debris showing), 25.137(b) (requiring non-U.S.
     systems to provide the legal and technical information called for under Section 25.114).

                                                        18


respect to orbital debris mitigation plans.”49 In support of this assertion, OneWeb cited the

Commission’s finding that the U.K. would provide such direct and effective regulatory oversight

with respect to the NGSO system operated by O3b.50

         When the Commission initially adopted this exception, it stated that a petitioner could

make the required showing of direct and effective regulatory oversight by submitting an English

language version of the debris mitigation rules or regulations of the national licensing authority

and indicating the current status of the national licensing authority’s review of its debris mitigation

plans.51 The OneWeb Petition includes neither of these items. In response to a request by the

International Bureau staff for any publicly available materials discussing the criteria applied by

the United Kingdom to assess the debris mitigation plans of NGSO satellite systems, OneWeb

provided a “Guidance for Applicants” document that outlines the license application and approval

process for the United Kingdom, including provisions applicable to orbital debris mitigation.52

While OneWeb anticipates that the U.K. will issue Space Activity Licenses for its system before

the initial launch of its satellites,53 there is no indication that OneWeb has filed any application for

such licenses or any related information on orbital debris mitigation.




49
     See OneWeb Petition at 16 (citing 47 C.F.R. § 25.114(d)(14)(v)).
50
     Id., n.50 (citing Petition for Declaratory Ruling of O3b Limited Granting Access to the U.S. Market for the O3b
     MEO Satellite System, IBFS File No. SAT-AMD-20150115-00004, Radio Station Authorization, at 3,
     Condition 15 (granted Jan. 22, 2015)).
51
     Orbital Debris Order, ¶ 95.
52
     See Letter from Kalpak S. Gude to Marlene H. Dortch, IBFS File No. SAT-LOI-20160428-00041, Response to
     Question 6 (June 24, 2016) (“OneWeb Supplemental Response”).
53
     See OneWeb Petition at 16, n.49.

                                                         19


         In applying the exception in Section 25.114(d)(14)(v), the Commission has made clear that

the mere prospect of regulatory review by another administration at some point in the future is not

sufficient. Thus, for example, the Commission dismissed as defective a petition by New Skies

Satellites, B.V. (“New Skies”) to serve the U.S. market using the SES-4 satellite, authorized by

the Netherlands, due to deficiencies in its orbital debris mitigation showing. In addition to failing

to provide the Netherlands’ debris mitigation guidelines, New Skies did not provide “the current

status of the Netherlands’ review of the specific debris mitigation plans for the SES-4 space

station.”54 The Commission advised that, in order to provide the information necessary to

determine whether granting market access would serve the public interest, “New Skies must state

whether the licensing administration for SES-4 has reviewed and affirmatively approved the

specific debris mitigation plans for the SES-4 space station set forth in New Skies’ application.”55

         By construing Section 25.114 in this way, the Commission ensures that the exception only

applies in cases where another licensing administration with a robust debris mitigation regime has

received complete information from the licensee, thoroughly evaluated it, and actually concluded

that the proposed plan will promote the safe use of space. Deferring to another regulator in such

circumstances may be considered a reasonable application of international comity.                               By

comparison, deferring where no regulator has yet received such information (much less approved

it) would be an abdication of the Commission’s responsibilities.




54
     John K. Hane, Esq., 26 FCC Rcd. 7996, 7997 (IB 2011).
55
     Id. (emphasis added). See also Carlos M. Nalda, 28 FCC Rcd. 1050, 1051 (IB 2013) (dismissing an application
     to modify a blanket license for communications with non-U.S. licensed satellites where the applicant failed to
     provide “an indication as to whether the licensing authority has reviewed and affirmatively approved specific
     debris mitigation plans for the spacecraft”).

                                                        20


         According to the information submitted by OneWeb, the U.K. regulator does not require

submission of any information on orbital debris mitigation and post-mission disposal until six

months before launch or operation.56 OneWeb has not indicated that it has provided the U.K.

authorities any such information to consider, or that its specific debris mitigation plans have been

reviewed and approved. It is asking the Commission to grant the Petition up to four years before

OneWeb may be required to submit any such information to the U.K. authorities.57 By contrast,

the Commission’s authorization to O3b cited by OneWeb was issued at a time when O3b’s system

was already in commercial operation58—i.e., after the U.K. had already fully considered O3b’s

application and issued licenses for its system.

         Given the scope of OneWeb’s proposed constellation—40 satellites in each of 18 orbital

planes—safe operation and disposal of these space objects will be crucial. Granting such a system

access to the U.S. market before any administration has received orbital debris information would

create a serious risk to all space-based systems, as there would be no assurance that the operator

had thoroughly evaluated strategies for minimizing or eliminating orbital debris and for safely and

efficiently disposing of spacecraft at the end of their useful lives. Such an outcome would not




56
     See OneWeb Supplemental Response, Attachment “Revised Guidance for Applicants—Outer Space Act 1986,”
     at 2 (“Applications should be submitted at least six months in advance of any plans for launch or operation.”).
57
     The Petition indicates that OneWeb plans to launch its entire constellation within six years of gaining access to
     the U.S. market, with principal launch activities performed over an 18 month period. See OneWeb Petition,
     Technical Appendix at 6. Under this schedule, OneWeb would not have to provide any information on orbital
     debris mitigation to the U.K. licensing authorities until up to four years after Commission action — with no
     requirement to share that information with the Commission or other interested parties.
58
     O3b launched its first four satellites in June 2013, and began providing service on a limited basis soon
     thereafter. See Press Release, “O3b Takes Control of First Satellites, as In-Orbit Testing Successfully
     Completed,” O3b Networks (July 30, 2013), available at http://www.o3bnetworks.com/o3b-takes-control-first-
     satellites-orbit-testing-successfully-completed/. O3b filed a Letter of Intent seeking U.S. market access for its
     NGSO system in October 2014. See IBFS File No. SAT-LOI-20141029-00118.

                                                          21


serve the public interest, and can easily be avoided by enforcing the Commission’s rules that

require submission and evaluation of this information before a U.S. authorization can be issued.59

                                                CONCLUSION

         The new generation of NGSO/FSS constellations holds incredible potential to bring

affordable, advanced broadband services to underserved and unserved areas of the United States

and around the world. Investment in advanced technologies that provide spectral efficiency and

operational flexibility are necessary for NGSO/FSS systems to successfully increase access to

reliable, high-speed broadband connectivity. Because OneWeb has chosen not to make that

investment in certain available technologies, its system would waste valuable spectrum and inhibit

effective spectrum sharing, creating obstacles for both its own operations and those of other

systems. In effect, OneWeb is requesting that the Commission authorize its own limited proposed

system at the potential expense of other prospective NGSO/FSS constellations and sacrifice the

benefits of a competitive NGSO/FSS environment for broadband service diversity in the U.S.

Further, OneWeb’s silence on its orbital debris mitigation and end-of-life disposal plans denies the

Commission and other interested parties crucial data that goes to the heart of safe space operations.

         The Commission must therefore assess whether granting market access to such a system

would serve the public interest. In particular, it must decide whether rewarding a system design

that fails to incorporate available technology to enhance spectrum capacity and make spectrum

sharing more feasible would achieve the long-recognized public interest goal of greater spectrum

efficiency. It must also consider whether any grant should be conditioned in a way that would




59
     In addition, because virtually all of the required information relates to considerations incorporated into the
     design and anticipated operation of the system, OneWeb should have little difficulty assembling and presenting
     it to the Commission for consideration.
                                                        22


offset the impact of OneWeb’s design choices. This should include making any authorization

subject to whatever rules are adopted in the upcoming rulemaking on NGSO/FSS issues. In

making this determination, the Commission should not allow OneWeb to impose an unfair and

disproportionate burden on other NGSO/FSS systems.

        Given that the Commission intends to initiate a rulemaking to update its rules for

NGSO/FSS systems in the near future, the issues raised here should be addressed first through rule

revisions that establish proper incentives to design systems that achieve their full potential for

broadband connectivity and spectrum efficiency. At a minimum, the Commission should apply

any eventual updated rules to this application, consistent with precedent in prior NGSO/FSS

processing rounds. It should also require OneWeb to submit complete information on orbital

debris mitigation plans and satellite disposal at end-of-life for consideration by the Commission

and all interested parties.

                                             Respectfully submitted,

                                             SPACE EXPLORATION TECHNOLOGIES CORP.


                                             By: /s/ Tim Hughes
 William M. Wiltshire                        Tim Hughes
 Paul Caritj                                 Senior Vice President and General
 HARRIS, WILTSHIRE & GRANNIS LLP             Counsel
 1919 M Street, N.W.
 Suite 800                                   Patricia Cooper
 Washington, DC 20036                         Vice President, Satellite Government
 202-730-1301 tel                             Affairs
 202-730-1301 fax                            SPACE EXPLORATION TECHNOLOGIES CORP.
                                             1030 15th Street, N.W.
 Counsel to SpaceX                           Suite 220E
                                             Washington, DC 20005
                                             202-649-2700 tel
                                             202-649-2701 fax

August 15, 2016
                                               23


Parameter                                 Value     Notes
Reference temperature [K]                  293
K [VK]                                   1.38E—23   Boltzmann
Frequency [GHz]                            11.7     Downlink: 10.7 — 12.7 GHz
EIRP [dBW]                                34.60.    Per OneWeb Tech Narrative
altitude [km]                             1200      Per OneWeb Tech Narrative
Space loss. user at nadir [dB]            175.39
distance to spot edge [Km]               1352.43    25° away from boresight (50° beamwidth)
Space loss user at spot edge [dB]         176.43
Clear sky attenuation [dB]                 0.30
Rx antenna directional error [dB]          0.10
Polarization loss [dB]                     0.30
Rain fade [dB]                             0.30
Margin for Adaptive Coding and
Modulation [dB]                            0.75     Margin to run ACM
Implementation loss, RF and modem [dB]     1.50
                                                    ~50cm "average" ES antenna (30—75cm,
ES Antenna Gain [dB] — estimated          33.00     per OneWeb Tech Narrative)
Symbol rate [Msym/sec]                     250
Necessary Bandwidth [MHz]                  250
Antenna temperature [K]                    60
ES Noise Figure of LNB [dB]                2.0
ES LNB noise temperature [K]              171.37
ES Receiver noise temperature[K]         231.37
ES Effective G/T [dB/K]                    9.36
C/N for ES @ spot edge [dB]                5.90
                                                    Based on using modcods that are 1dB
PHY rate in 250MHz @ spot edge                      worse than DVB—S2X codes. ideal EsNo,
[Mbps]                                     417      AWGN Lin Ch
C/N for ES @ spot center[dB]               9.94
PHY rate in 250MHz @ spot center
[Mbps]                                     639
                                                    Averaging between spot center and spot
Average PHY Rate [Mbps]                    528      edge
MAC efficiency [%]                        80%
Average Thru perbeam [Mbps]                422      TP throughput


                         ENGINEERING CERTIFICATION


The undersigned hereby certifies to the Federal Communications Commission as
follows:

 (i) I am the technically qualified person responsible for the engineering information
     contained in the foregoing Comments,

 (ii) I am familiar with Part 25 of the Commission's Rules, and

 (iii) I have either prepared or reviewed the engineering information contained in the
       foregoing Comments, and it is complete and accurate to the best of my knowledge
       and belief.


                                            Signed:


                                            /s/ Mihai Albulet
                                            Mihai Albulet, PhD
                                            Principal RF Engineer
                                            SPACE EXPLORATION TECHNOLOGIES CORP.


                                            August 15, 2016
                                            Date


                               CERTIFICATE OF SERVICE


       I hereby certify that, on this 15th day of August, 2016, a copy of the foregoing Comments
was served via First Class mail upon:


                             Jennifer D. Hindin
                             Colleen King
                             Wiley Rein LLP
                             1776 K Street, N.W.
                             Washington, DC 20006

                             Dara A. Panahy
                             Phillip L. Spector
                             Milbank, Tweed, Hadley & McCloy LLP
                             1850 K Street, N.W.
                             Suite 1100
                             Washington, DC 20036



                                                    /s/ Jill Warnock
                                                    Jill Warnock