                                   Federal Communications Commission                                  FCC 08-64


                                              Before the
                                   Federal Communications Commission
                                         Washington, D.C. 20554


In the Matter of                                         )
                                                         )
EchoStar Satellite Operating Corporation                 )
                                                         )
Application to Construct, Launch, and Operate a          )        File No. SAT-LOA-20030609-00113
Direct Broadcast Satellite at the 86.5° W.L.             )        Call Sign: S2454
Orbital Location                                         )
                                                         )
Spectrum Five, LLC                                       )
                                                         )
Petition for Declaratory Ruling to Serve                 )        File Nos. SAT-LOI-20050312-00062,
the U.S. Market Using Broadcast Satellite Service        )        SAT-LOI-20050312-00063
Spectrum from the 114.5° W.L. Orbital Location           )        Call Signs: S2667, S2668

                                MEMORANDUM OPINION AND ORDER

Adopted: February 21, 2008                                                     Released: February 25, 2008

By the Commission: Commissioners Copps and Adelstein, dissenting and issuing a joint statement.

I.      INTRODUCTION

        1. By this Order, we deny applications for review filed by DIRECTV Enterprises, LLC
(DIRECTV), EchoStar Satellite L.L.C. (EchoStar), and Telesat Canada (Telesat) seeking review and
reversal of two International Bureau licensing decisions. On November 29, 2006, the International
Bureau granted Spectrum Five, LLC’s (Spectrum Five) requests to provide Direct Broadcast Satellite
(DBS) service to U.S. consumers from two Netherlands-authorized satellites,1 and granted EchoStar
authority to construct a satellite to provide DBS service to U.S. consumers from the 86.5º W.L. orbital
location.2 For the reasons discussed below, we affirm the Bureau’s decision to grant the Spectrum Five
and EchoStar requests.

II.     BACKGROUND

        2. EchoStar filed applications in June 2003 to construct, launch, and operate DBS space stations
at the 86.5º W.L., 96.5º W.L., 114.5º W.L., and 123.5º W.L. orbital locations.3 EchoStar later withdrew

1
  Spectrum Five LLC, Petition for Declaratory Ruling to Serve the U.S. Market Using Broadcast Satellite Spectrum
from the 114.5º W.L. Orbital Location, Order and Authorization, 21 FCC Rcd 14023 (2006) (Spectrum Five Order).
2
 EchoStar Satellite L.L.C., Application to Construct, Launch, and Operate a Direct Broadcast Satellite at the 86.5°
W.L. Orbital Location, Order and Authorization, 21 FCC Rcd 14045 (2006) (EchoStar 86.5 WL Order).
3
 Application of EchoStar Satellite Corporation for Authority to Construct, Launch and Operate a Direct Broadcast
Satellite in the 12.2-12.7 GHz and 17.3-17.8 GHz Frequency Bands at the 86.5º W.L. Orbital Location, File No.
SAT-LOA-20030609-00113 (filed June 9, 2003); Application of EchoStar Satellite Corporation for Authority to
Construct, Launch and Operate a Direct Broadcast Satellite in the 12.2-12.7 GHz and 17.3-17.8 GHz Frequency
                                                                                                  (Continued....)


                                       Federal Communications Commission                              FCC 08-64


all applications except the one for the 86.5° W.L. orbital location.4 The Bureau placed that application on
Public Notice on April 15, 2005.5 Comments were filed by SES Americom, and Telesat and Bell
ExpressVu L.P. (Bell ExpressVu) filed oppositions. Telesat is the Canadian-licensed operator of DBS
satellites at 91° W.L. and 82° W.L.

       3. In March 2005, Spectrum Five filed two petitions for declaratory ruling seeking to provide
DBS service to U.S. consumers from two Netherlands-authorized satellites to be located at the 114.5º
W.L. orbital location. The petitions were placed on Public Notice on April 15, 2005.6 SES Americom,
EchoStar, and DIRECTV filed comments and oppositions. Spectrum Five filed a reply. SES Americom,
EchoStar, and DIRECTV filed responses to Spectrum Five’s reply.

         4. In June 2005, the United States Court of Appeals for the D.C. Circuit held, in Northpoint
Technology, Ltd. v. Federal Communications Commission, that Auction No. 52 for three DBS licenses
was unauthorized.7 In light of this holding, the Commission adopted a freeze on all applications for new
DBS authorizations to use the 12.2-12.7 GHz band and associated feeder links in the 17.3-17.8 GHz band,
pending Commission consideration of the appropriate processing rules for applications to provide DBS in
the United States. The DBS application freeze was limited to “applications for licenses for new space
stations or new requests for market access by foreign-licensed space stations.”8 In August 2006, the
Commission adopted a Notice of Proposed Rulemaking seeking comment on licensing procedures and
service rules for satellites providing DBS service.9

        5. On November 29, 2006, the Bureau granted Spectrum Five’s petitions, subject to certain
conditions.10 On the same date, the Bureau partially granted EchoStar’s application, subject to conditions,
authorizing EchoStar to construct the satellite, but not to launch or operate this satellite, pending
consideration of additional information regarding EchoStar’s end-of-life disposal plans for the satellite.11

(...continued from previous page)
Bands at the 96.5º W.L. Orbital Location, File No. SAT-LOA-20030605-00109 (filed June 5, 2003); Application of
EchoStar Satellite Corporation for Authority to Construct, Launch and Operate a Direct Broadcast Satellite in the
12.2-12.7 GHz and 17.3-17.8 GHz Frequency Bands at the 114.5º W.L. Orbital Location, File No. SAT-LOA-
20030604-00108 (filed June 4, 2003); and Application of EchoStar Satellite Corporation for Authority to Construct,
Launch and Operate a Direct Broadcast Satellite in the 12.2-12.7 GHz and 17.3-17.8 GHz Frequency Bands at the
123.5º W.L. Orbital Location, File No. SAT-LOA-20030606-00107 (filed June 6, 2003).
4
 See Satellite Policy Branch Information, Public Notice, Report No. SAT-00171 (rel. October 10, 2003) (Int’l Bur.
2003), Satellite Policy Branch Information, Public Notice, Report No. SAT-00283 (rel. April 8, 2005) (Int’l Bur.
2003).
5
 Policy Branch Information: Satellite Space Applications Accepted for Filing, Public Notice, Report No. SAT-
00284 (rel. April 15, 2005).
6
 Policy Branch Information: Satellite Space Applications Accepted for Filing, Public Notice, Report No. SAT-
00284 (rel. April 15, 2005).
7
    Northpoint Technology, Ltd. v. Federal Communications Commission, 412 F3d 145 (D.C. Cir. 2005).
8
 See Direct Broadcast Satellite Service Auction Nullified: Commission Sets Forth Refund Procedures for Auction
No. 52 Winning Bidders and Adopts a Freeze on All New DBS Service Applications, Public Notice, 20 FCC Rcd
20618 (2005) (DBS Freeze Notice).
9
 Amendment of the Commission’s Policies and Rules for Processing Applications in the Direct Broadcast Satellite
Service, Notice of Proposed Rulemaking, 21 FCC Rcd 9443 (2006) (DBS Notice).
10
     Spectrum Five Order, 21 FCC Rcd at 140442-44, paras. 43-47.
11
     EchoStar-86.5W Order, 21 FCC Rcd at 14056-57, para. 21.



                                                        2


                                            Federal Communications Commission                         FCC 08-64


The Bureau imposed a number of conditions on the Spectrum Five and EchoStar grants, including a
requirement that any operations of the proposed satellites in the United States would not impermissibly
interfere with other DBS satellites operating in the United States, and would be consistent with
International Telecommunication Union (ITU) Radio Regulations.12 The grants for both Spectrum Five
and EchoStar were also made subject to any rules adopted as a result of the DBS Notice.13

         6. In its application for review of the Spectrum Five grant, DIRECTV argues that the Bureau did
not have delegated authority to act on the new and novel questions presented by Spectrum Five’s
petitions. DIRECTV alleges that the Bureau’s action is inconsistent with specific Commission statements
in the DBS Notice concerning processing of “reduced spacing” proposals, i.e., those involving DBS space
stations operating at orbital locations that are less than nine degrees away from other DBS space
stations.14 Spectrum Five’s satellites would operate approximately four and one half degrees away from
adjacent DBS satellites. EchoStar’s application for review of the Spectrum Five grant challenges the
Bureau’s action on the same grounds as DIRECTV, and argues that by acting on Spectrum Five’s
requests, the Bureau impermissibly chose to proceed through adjudication, and thereby improperly pre-
judged issues raised in the DBS Notice.15 EchoStar further argues that the Bureau’s action violated
principles derived from the Supreme Court’s Ashbacker decision,16 by not providing an adequate
opportunity for the filing of proposals mutually exclusive with Spectrum Five’s petitions. EchoStar also
argues that the Bureau failed to evaluate Spectrum Five’s basic qualifications, and failed to adequately
evaluate the potential for interference that would result from Spectrum Five’s operations. Spectrum Five
filed a consolidated opposition to DIRECTV and EchoStar, and both then filed a reply to the opposition.17

        7. In its application for review of the EchoStar grant, Telesat argues that the Bureau did not
evaluate or account for the potential interference that EchoStar’s satellite would cause to Telesat’s
system, which operates using satellites located four and one half degrees on either side of EchoStar’s
proposed orbital location.18 Telesat also argued that the Bureau should not have granted EchoStar’s
application until coordination with existing DBS operators had been completed.19 Telesat also claims that
the Bureau decision wrongly afforded less interference protection to Canadian-licensed DBS satellites
authorized to serve the United States than is afforded to U.S.-licensed DBS satellites.20 EchoStar filed an



12
  Spectrum Five Order, 21 FCC Rcd at 14042-43 para. 43; EchoStar-86.5W Order, 21 FCC Rcd at 14059-60, para.
28. The frequencies and orbital locations involved are a part of a detailed plan for frequency use set forth in ITU
regulations. For a complete description of this plan, see DBS Notice, 21 FCC Rcd at 9444-46, paras. 3-6.
13
     Spectrum Five Order, 21 FCC Rcd at 14043, para. 44.; EchoStar-86.5W Order, 21 FCC Rcd at 14060, para. 29.
14
  DIRECTV Application for Review at 3-5 (filed Dec. 29, 2006), citing DBS Notice, 21 FCC Rcd at 9461, paras.
40-41.
15
     EchoStar Application for Review at 4 (filed Dec. 29, 2006).
16
  EchoStar Application for Review at 9; see Ashbacker Radio Corp. v. FCC, 326 U.S. 327 (1945). The Court held
in Ashbacker “that where two bona fide applications are mutually exclusive the grant of one without a hearing to
both deprives the loser of the opportunity which Congress chose to give him.” Ashbacker, 326 U.S. at 333.
17
  Spectrum Five Consolidated Opposition to Applications for Review (filed Jan. 16, 2007); DIRECTV Reply in
Support of Application for Review (filed Jan. 18, 2007); EchoStar Reply (filed Jan. 26, 2007).
18
     Telesat Application for Review at 6.
19
     Telesat Application for Review at 8.
20
     Telesat Application for Review at 11.


                                                           3


                                        Federal Communications Commission                         FCC 08-64


opposition to the Telesat application for review, asserting that Telesat’s interference concerns “are fact
specific” and can be resolved in the coordination process.21

III.       DISCUSSION

         8. We conclude that the Bureau properly acted within the scope of its delegated authority when it
granted Spectrum Five’s petitions for declaratory ruling, and EchoStar’s application. The Bureau
followed established procedures and its actions were consistent with Commission guidance, provided in
the DBS Notice, for processing of applications. The Bureau conditioned the grants so that Spectrum Five
and EchoStar may not operate in a manner that affects other DBS operators unless they first coordinate
with affected operators. This condition is fully consistent with our obligations under ITU regulations, and
is sufficient to provide all due interference protection to other DBS operations.

A.         Appropriateness of Action on Delegated Authority

         9. In the DBS Notice, we indicated that the pending reduced spacing DBS applications and
petitions could be processed prior to adoption of final DBS rules, according to principles of general
statutory authority and existing application filing requirements.22 Despite this, both EchoStar and
DIRECTV point to the section of the DBS Notice regarding resolution of impasses in operator
negotiations as support for their opposition to the Spectrum Five grant. This section described three
scenarios by which an applicant could take actions that would result in favorable action on an application:

                   i)       the applicant has negotiated an operating arrangement with the other potentially-
                            affected U.S. DBS service providers,

                   ii)      the applicant has demonstrated that the proposed DBS system would not affect
                            the systems of other U.S. DBS service providers as defined by the ITU in Annex
                            1 of Appendix 30 and 30A, and has not negotiated operating arrangements, or

                   iii)     the applicant has conducted interference analyses, the results of which the
                            applicant considers should be acceptable to other U.S. DBS service providers, but
                            one or more of the U.S. DBS service providers disagree.23

        10. We disagree with DIRECTV’s contention that this language precluded the Bureau from
following its normal practice of imposing conditions, as appropriate, in order to address interference
concerns. Moreover, the conditions adopted by the Bureau were consistent with the intent of this
language, because they provide that operations will not affect other systems except upon an agreed basis.
To the extent that the Spectrum Five petitions raised interference concerns, the Bureau addressed those
concerns with appropriate conditions on the grant.

        11. We also do not agree with DIRECTV that the Spectrum Five grant is novel because it
represents the first time the Commission has authorized U.S. market access from a foreign satellite that
had not yet completed coordination with affected U.S. systems.24 The Commission routinely grants

21
  EchoStar Opposition at 4 (filed Jan. 16, 2007). Telesat filed a reply to EchoStar’s Opposition on January 26,
2007.
22
     DBS Notice, 21 FCC Rcd at 9453-54, para. 21.
23
     DBS Notice, 21 FCC Rcd at 9461, para. 40.
24
     DIRECTV Application for Review at 8.



                                                       4


                                         Federal Communications Commission                         FCC 08-64


applications subject to conditions concerning the subsequent completion of coordination,25 including
applications involving access to the U.S. market by foreign-licensed satellites.26 Here, the Bureau
appropriately conditioned Spectrum Five’s access to the U.S. market such that it may operate only if it
does not exceed the ITU trigger for coordination (i.e., Spectrum Five may not “affect” U.S. DBS
operators). Thus, Spectrum Five is under no obligation to coordinate with U.S. operators, provided the
coordination trigger is not exceeded. However, if Spectrum Five were to exceed the ITU trigger, then, by
the terms of the authorization, Spectrum Five would not be permitted to operate until it successfully
coordinates with U.S. operators. To the extent that DIRECTV and Echostar believe that the ITU trigger
for coordination does not provide adequate protection to incumbent operations, that issue is a subject
under consideration in the DBS rulemaking proceeding, and the Spectrum Five and Echostar grants are
subject to any further development of protection criteria in that proceeding27

B.         Ashbacker Principles

        12. EchoStar’s reliance on the Supreme Court decision in Ashbacker, in its application for review
of the Spectrum Five grant, is misplaced. In Ashbacker, the Supreme Court held that Section 309 of the
Communications Act required the Commission to consider in a comparative hearing two mutually
exclusive applications, both of which had been accepted for filing, before granting one and denying the
other.28 That holding does not apply here. In Reuters v. FCC, the U.S. Court of Appeals for the D.C.
Circuit held that Ashbacker “applies not to prospective applicants, but only to parties whose applications
have been declared mutually exclusive.”29 In this case, Spectrum Five’s petitions sought access to the
U.S. market from the 114.5º W.L. orbital location. No other applications or petitions for use of the 114.5°
W.L. orbital location were pending at any time during the pendency of the Spectrum Five’s petitions.30
We agree with Spectrum Five that since no other proposals for use of the 114.5° W.L. orbital location
were on file, mutual exclusivity was not established and therefore no Ashbacker rights were implicated.31
The facts surrounding the Spectrum Five grant are similar to Bachow v. FCC,32 in which the D.C. Circuit

25
  See, e.g., DIRECTV Enterprises, LLC, Applications for Authority to Launch and Operate the DBS and Ka-band
Payloads on the DIRECTV 9S Satellite; Amendment to Change Orbital Location, Order and Authorization, 21 FCC
Rcd 8028 (2006) (requiring DIRECTV to coordinate Ka-band operations with Federal fixed-satellite service systems
and any future two-degree spacing compliant satellites). See also 47 C.F.R. § 25.111(a) (providing that the
“Commission may request from any party at any time additional information concerning any application. . . .”).
Compare IBFS File Nos. SAT-LOA-20051221-00267, SAT-AMD-20060120-00007, and SAT-MOD-20060329-
00031 (declining to authorize imminent operations above previously coordinated power levels in a case in which
coordination for operation at higher power levels was not complete).
26
   See, e.g., Telesat Canada, Petition for Declaratory Ruling For Inclusion of ANIK F1 on the Permitted Space
Station List, Order, 15 FCC Rcd 24828 (2000) (finding it not necessary to complete international coordination
before an FSS satellite system can be authorized to provide service in the United States).
27
     See EchoStar Application for Review at 16.
28
  Ashbacker v. FCC, 326 U.S. 327, 330-31 (1945) (Ashbacker). The Commission had granted one application and
relied on that grant as the basis for dismissal of the second.
29
     Reuters Limited v. FCC, 781 F.2d 946, 951 (D.C. Cir. 1986) (emphasis in original).
30
  As noted by Spectrum Five, the only other DBS application for the 114.5° W.L. orbital location was filed by
EchoStar in 2003, and withdrawn that same year (before Spectrum Five filed). See Spectrum Five Consolidated
Opposition at 8.
31
     Spectrum Five Consolidated Opposition at 8.
32
   Bachow Communications, Inc. v. Federal Communications Commission, 237 F.3d 683 (D.C. Cir. 2001) (Bachow
v. FCC).



                                                           5


                                          Federal Communications Commission                             FCC 08-64


held that the Commission properly granted applications that were filed consistent with Section 309’s
“ripeness period” (i.e., the applications had been on file for the requisite period of time before the
Commission could act) and were not mutually exclusive with any other pending applications, even though
it would still have been possible to file mutually exclusive applications had the Commission not imposed
a filing freeze (once the pending applications had ripened).33

         13. EchoStar’s reliance on the unpublished Hilding v. FCC opinion34 to establish that the
Spectrum Five Order violated Ashbacker is also misplaced.35 In that 1987 decision, the Ninth Circuit
U.S. Court of Appeals refused to set aside a Commission decision to establish a general filing window for
new FM channels. Hilding wanted the Commission to adopt his proposal to preclude all parties from
filing, except the party who initially requested that the FCC amend its rules to allot the FM channel to a
particular community. The Court stated that “Hilding’s self-serving proposal undermines the FCC’s
mandate to select the best qualified applicant pursuant to Ashbacker because it limits to one the number of
applicants.”36 Here, there was an approximately nine-month period during which competing applications
could have been filed for the 114.5° W.L. orbital location. Thus, in contrast to what Hilding had
proposed, there was no limit on the number of applicants. Further, we do not consider it a reasonable
reading of Ashbacker or the Hilding case to require the Commission to delay action on an application
until a competing application emerges. Indeed, the Bachow case squarely holds that such delay is not
required under the circumstances present here.

         14. The DBS freeze does not alter our analysis. The DBS Freeze Notice did not announce a halt
in the processing of previously filed applications. EchoStar effectively seeks this result by arguing that
“until the freeze is lifted at the completion of the DBS NPRM,” there is “no reasonable means by which to
determine if mutually exclusive applications would exist if th[e] freeze were lifted.”37 Ashbacker,
however, does not require the Commission to create opportunities for filing mutually exclusive
applications. As indicated above, the D.C. Circuit made this clear in Bachow,38 where the court upheld
the Commission’s use of a freeze imposed without notice and comment -- even though the freeze
foreclosed the filing of new applications that could potentially be mutually exclusive with pending
applications -- which resulted in the non-competitive processing of previously filed applications that were
ripe for agency action. Here, the Spectrum Five petitions were ripe for agency action on May 16, 2005,
following the expiration of a comment cycle established by the Bureau’s April 15, 2005, Public Notice,39
consistent with Section 25.154 of the Commission’s rules.40 The Spectrum Five petitions are therefore
analogous to the applications that the Commission granted in Bachow v. FCC. Like the Spectrum Five
petitions, the applications that the Commission granted in Bachow v. FCC were considered ripe for
agency action, and no other parties had filed mutually exclusive applications in conflict with them prior to
a freeze that cut off such opportunity.

33
     237 F.3d at 689.
34
     Eric R. Hilding v. Federal Communications Commission, No. 86-7226, slip op. (9th Cir. Dec. 7, 1987).
35
     EchoStar Application for Review at 8, n. 26 and EchoStar Reply at 3.
36
     Hilding v. FCC, No. 86-7226, slip op. at 5.
37
     Echostar Application for Review at 9.
38
     See Bachow v. FCC, 237 F.3d at 690.
39
  Policy Branch Information: Satellite Space Applications Accepted for Filing, Public Notice, Report No. SAT-
00284 (rel. April 15, 2005).
40
 47 C.F.R. § 25.154. This rule section ensures processing consistent with the requirements of Section 309(b) of the
Communications Act, 47 U.S.C. § 309(b).


                                                           6


                                        Federal Communications Commission                           FCC 08-64


C.         Relationship Between Rule Making and Adjudicatory Proceedings

        15. We conclude that the Bureau properly chose to take adjudicatory action concerning Spectrum
Five’s petitions for declaratory ruling. The Commission has a significant degree of discretion in deciding
whether to take action by rulemaking or adjudication.41 As the D.C. Circuit Court held in SBC
Communications, Inc. v. FCC, “[i]nherent in an agency’s ability to choose adjudication rather than
rulemaking is the option to make policy choices in small steps, and only as a case obliges it to.”42 Here,
the Bureau chose to address issues of particular applicability to an individual applicant.

         16. We disagree with EchoStar’s arguments that the Bureau’s action impermissibly prejudiced
the separate DBS rulemaking. We also disagree with EchoStar’s characterization of the Spectrum Five
grant as the adoption of first-come, first-served licensing for DBS.43 No other applications or petitions to
provide DBS in the U.S. from the 114.5° W.L. orbital location were filed during the approximately nine-
months between the time Spectrum Five’s petitions for declaratory ruling were filed and the date on
which the DBS application freeze went into effect.44 Had there been any such filings (thereby resulting in
mutual exclusivity), only then could the Bureau’s grant of the Spectrum Five petitions be fairly
characterized as de facto implementation of first-come, first-served processing. EchoStar also alleges that
the grant of Spectrum Five’s petitions irrevocably commits the Commission to adopting first-come, first-
served licensing, since any other licensing scheme would require that the Spectrum Five grant would have
to be canceled. 45 This argument is also unpersuasive. To the extent any further consideration of the
ruling is warranted in the public interest, including conditions on or modification of prior decisions, those
options remain available in a report and order in the DBS rulemaking proceeding. As the Commission
pointed out in the DBS Notice, requests such as Spectrum Five’s can be processed “on an ad hoc basis,
pursuant to our existing statutory authority.”46 The Spectrum Five petitions for declaratory ruling had
been on file for more than 20 months at the time of their grant, and any further delay in disposing of them
was unwarranted.

        17. EchoStar’s reliance on the Ford Motor Co. v. Federal Trade Commission case is also
misplaced.47 That case involved an FTC ruling concerning the proper methods for calculating the value
of, and assessing charges related to, repossessed automobiles. Among the issues was whether the FTC
properly interpreted state laws on the matter. The Ninth Circuit Court of Appeals found that an FTC
ruling on the matter, in an adjudication, would have general application, well beyond the scope of the
41
   See Securities and Exchange Commission v. Chenery Corp., 332 U.S. 194, 203 (1947) ("[T]he choice made
between proceeding by general rule or by individual, ad hoc litigation is one that lies primarily in the informed
discretion of the administrative agency.")
42
     SBC Communications, Inc. v. FCC, 138 F.3d 410, 421 (D.C. Cir. 1998).
43
     EchoStar Application for Review at 7.
44
  Spectrum Five’s petitions were on Public Notice on April 15, 2005, roughly eight months prior to the DBS Freeze
Notice. See Satellite Policy Branch Information: Applications Accepted for Filing, Public Notice, Report No. SAT-
00284 (rel. April 15, 1005); Direct Broadcast Satellite Service Auction Nullified: Commission Sets Forth Refund
Procedures for Auction No. 52 Winning Bidders and Adopts a Freeze on All New DBS Service Applications, Public
Notice, 20 FCC Rcd 20618 (rel. Dec. 21, 2005).
45
     EchoStar Application for Review at 7.
46
   DBS Notice, 21 FCC Rcd at 9453-54, para. 21. Furthermore, “[g]iven our ... application filing requirements and
rules regarding non-interference showings, we may process the existing DBS applications provided that they are
complete and consistent with the public interest, convenience, and necessity.” Id.
47
     EchoStar Application for Review at 8.



                                                         7


                                             Federal Communications Commission                    FCC 08-64


particular parties to the litigation. The Court said that if an “adjudication changes existing law, and has
widespread application,” then “the matter should be addressed by rulemaking.”48 By contrast, the grant of
Spectrum Five’s petition for declaratory ruling addressed the particular facts and circumstances raised by
Spectrum Five’s proposal, and does not change existing law.49

D.         Evaluation of Spectrum Five’s Qualifications

         18. We disagree with Echostar’s contention that the Bureau failed to adequately evaluate
Spectrum Five’s basic qualifications. In its application, Spectrum Five provided all information
concerning qualifications routinely required of applicants. The Bureau reviewed this evidence and found
Spectrum Five qualified. We affirm this determination. EchoStar has provided no specific allegations of
fact that would call into question Spectrum Five’s qualifications.50

E.         Evaluation of Interference Environment

         19. We disagree with EchoStar’s contention that the Bureau neglected to evaluate the potential
interference posed by Spectrum Five’s proposed operations.51 The Bureau’s recognition of the potential
interference prompted it to condition Spectrum Five’s access such that absent an agreement, Spectrum
Five’s operations may not exceed the ITU trigger for coordination (i.e., Spectrum Five may not “affect”
U.S. DBS operators).52 Furthermore, the Bureau conditioned Spectrum Five’s authorization to require
that within 30 days of completion of critical design review, Spectrum Five must provide all the technical
characteristics of its satellite modified as a result of the coordination process, regardless of whether
coordination is successful. Therefore, in the event that Spectrum Five is unable to negotiate operational
parameters in excess of the ITU coordination trigger and this leads Spectrum Five to change its proposed
space station operations, Spectrum Five must file a modification application that specifies the modified
operations and a technical analysis showing how the modified operations will not exceed the ITU trigger
for coordination. Thus, the Bureau ensured that any issues that may arise as a result of the coordination
process will be adequately reviewed prior to the commencement of operations.

         20. Similarly, we disagree with Telesat’s contention that the Bureau’s action on EchoStar’s
application was improperly “based upon the hypothetical operation of EchoStar’s satellite at unstated
power reductions and without any submission by EchoStar… as to how its satellite would—or could—
operate under such conditions.”53 The Bureau reviewed EchoStar’s application and found that it was
complete in that all information requirements were met. To the extent that the application raised
interference concerns, the Bureau addressed them with appropriate conditions on the grant. We find that
Telesat’s argument that EchoStar’s application was not substantially complete is unsupported.
Furthermore, and on our own motion, we add a condition to EchoStar’s authorization requiring that
within 30 days of completion of critical design review, EchoStar must provide all the technical
characteristics of its satellite modified as a result of the coordination process, regardless of whether
coordination is successful. Therefore, in the event that EchoStar is unable to negotiate operational

48
     Ford Motor Co. v. FTC, 673 F.2d 1008, 1010 (9th Cir. 1981).
49
 The Bureau did not have DBS-specific application processing rules at its disposal post-Northpoint (and thus no
DBS-specific rules to change), but it did have general statutory authority to act.
50
     EchoStar Application for Review at 10-13.
51
     See EchoStar Application for Review at 15-16.
52
     See also supra discussion in para. 9.
53
     Telesat Application for Review at 6.



                                                          8


                                        Federal Communications Commission                          FCC 08-64


parameters in excess of the ITU coordination trigger and this leads EchoStar to change its proposed space
station operations, EchoStar must file a modification application that specifies the modified operations
and a technical analysis showing how the modified operations will not exceed the ITU trigger for
coordination. This condition is consistent with the coordination condition in Spectrum Five’s
authorization.54

        21. We also reject Telesat’s contention that completion of international coordination was
necessary prior to grant of EchoStar’s application. Coordination with other administrations is not a
prerequisite to grant of U.S. DBS space station licenses to U.S. operators. Were the opposite true, any
administration raising an interference objection to U.S. operator proposals would be able to block
Commission licensing of DBS systems. As Telesat itself points out, our general policy in such
circumstances has been to grant DBS authorizations even though coordination with other administrations
remains pending. No agreement is necessary, however, if the new operation does not affect other
operators or ITU filings with date priority. We are satisfied that the Bureau’s condition that, in the
absence of agreement, EchoStar’s operations may not exceed the ITU trigger for coordination,
appropriately addresses Telesat’s concerns.55

F.         Equivalent Treatment of Foreign-Licensed Satellites

         22. Finally, we find no basis for Telesat’s claim that the Bureau provided Canadian DBS
satellites less interference protection than U.S.-licensed DBS satellites. In fact, the Bureau appropriately
conditioned EchoStar’s authorization in precisely the same way it conditioned the grant to Spectrum Five.
The relevant condition does not distinguish between affected operators based upon nationality.

IV.        CONCLUSION

         23. After reviewing the record, we affirm the Bureau’s decisions. We find no reason to reverse
the Bureau’s grant of Spectrum Five’s petitions for declaratory ruling the 114.5° W.L. orbital location, or
the Bureau’s decision to grant, in part, EchoStar’s application to launch and operate a DBS satellite at the
86.5º W.L. orbital location. Consequently, we deny the applications for review of the Spectrum Five
grant, filed by DIRECTV and EchoStar, and the application for review of the EchoStar grant, filed by
Telesat.

V.         ORDERING CLAUSES

      24. Accordingly, IT IS ORDERED that the applications for review filed on December 29, 2006
by DIRECTV Enterprises, LLC, EchoStar Satellite L.L.C., and Telesat Canada ARE DENIED.




54
     See Spectrum Five Order, 21 FCC Rcd at 14042-43, para. 43(c).
55
  We emphasize that the grant was made subject to the outcome of the rule making proceeding initiated by the DBS
Notice. To the extent Telesat maintains that ITU coordination triggers do not provide adequate protection, this
contention can be addressed in that proceeding.



                                                         9


                                 Federal Communications Commission                        FCC 08-64


     25. EchoStar’s authorization to construct the EchoStar-86.5W satellite, DA 06-2440, IS
MODIFIED at paragraph 28 to include this condition:

       h.     Within 30 days of completion of critical design review, EchoStar must supply updated
              service area information for each of its antenna beams. EchoStar must also provide all
              the technical characteristics of the satellites modified as a result of the coordination
              process.

        26. This Memorandum Opinion and Order is issued pursuant to Sections 4(i) and 5(c)(5) and
(6) of the Communications Act of 1934, as amended, 47 U.S.C. §§ 154(i) and 155(c)(5) and (6), and
Section 1.115 of the Commission’s rules, 47 C.F.R. § 1.115.



                                             FEDERAL COMMUNICATIONS COMMISSION



                                             Marlene H. Dortch
                                             Secretary




                                                10


                                    Federal Communications Commission                           FCC 08-64


                   DISSENTING JOINT STATEMENT OF
       COMMISSIONERS MICHAEL J. COPPS AND JONATHAN S. ADELSTEIN


Re: EchoStar Satellite Operating Corporation, Application to Construct, Launch, and Operate a
Direct Broadcast Satellite at the 86.5º W.L. Orbital Location; Spectrum Five, L.L.C., Petition for
Declaratory Ruling to Serve the U.S. Market Using Broadcast Satellite Service Spectrum from
the 114.5º W.L. Orbital Location

         We respectfully dissent to today’s decision, which affirms the Bureau’s grant of authorization for
two so-called ‘tweener satellites. As we have stated before, without prejudging the merits of these
applications, we do not believe the FCC has any business approving ‘tweener applications at the same
time that the agency is conducting a general rulemaking into the technical feasibility of operating such
satellites.




                                                    11


                               Federal Communications Commission                      FCC 08-64


               DISSENTING JOINT STATEMENT OF
   COMMISSIONERS MICHAEL J. COPPS AND JONATHAN S. ADELSTEIN


Re: EchoStar Satellite Operating Corporation, Application to Construct, Launch, and
Operate a Direct Broadcast Satellite at the 86.5º W.L. Orbital Location; Spectrum Five,
L.L.C., Petition for Declaratory Ruling to Serve the U.S. Market Using Broadcast
Satellite Service Spectrum from the 114.5º W.L. Orbital Location

        We respectfully dissent to today’s decision, which affirms the Bureau’s grant of
authorization for two so-called ‘tweener satellites. As we have stated before, without prejudging
the merits of these applications, we do not believe the FCC has any business approving ‘tweener
applications at the same time that the agency is conducting a general rulemaking into the
technical feasibility of operating such satellites.



Document Created: 2008-03-03 14:33:04
Document Modified: 2008-03-03 14:33:04

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC