Attachment da011638

This document pretains to SAT-LOI-19970926-00161 for Letter of Intent on a Satellite Space Stations filing.

IBFS_SATLOI1997092600161_219674

                                    Federal Communications Commission                                  DA 01-1638

                                               Before the
                                    Federal Communications Commission
                                          Washington, D.C. 20554


In the Matter of                                           )
                                                           )
TMI Communications and Company,                            )       File No.    189-SAT-LOI-97
Limited Partnership                                        )
                                                           )       IBFS Nos. SAT-LOI-19970926-00161
Letter of Intent to Provide                                )                 SAT-AMD-20001103-00158
Mobile-Satellite Service in the 2 GHz Bands                )


                                                     ORDER


         Adopted: July 17, 2001                                         Released: July 17, 2001

By the Chief, International Bureau:

                                           I.       INTRODUCTION

        1.     By this Order, we grant the request of TMI Communications and Company, Limited
Partnership (TMI) to use spectrum in the 2 GHz band to provide Mobile-Satellite Service (MSS).1 This
action is a significant step in assigning this spectrum for use by MSS providers and facilitates
implementation of TMI’s proposed system’s technology and service offerings in the marketplace.

                                            II.      BACKGROUND

        2.      TMI proposes to provide MSS from one non-U.S.-licensed space station in
geostationary-satellite orbit (GSO), using service links in the 2 GHz MSS band.2 Specifically, TMI plans
to operate CANSAT-M3, to be licensed by Industry Canada, from the 106.5° W.L. orbit location.3 TMI
proposes to use the 1990-2025 MHz and 2165-2200 MHz bands to serve customers in the United States.4
   1
         The term “2 GHz MSS Band” is used in this Order to refer to the 1990-2025 MHz (uplink) and 2165-2200
MHz (downlink) frequencies. These frequencies are allocated to the Mobile-Satellite Service (MSS) in the United
States. See Amendment of Section 2.106 of the Commission's Rules to Allocate Spectrum at 2 GHz for Use by the
Mobile-Satellite Service, ET Docket No. 95-18, First Report and Order and Further Notice of Proposed Rule
Making, 12 FCC Rcd 7388 (1997), aff’d on recon., Memorandum Opinion and Order and Third Notice of Proposed
Rule Making and Order, 13 FCC Rcd 23949 (1998), further proceedings, Second Report And Order and Second
Memorandum Opinion and Order, 15 FCC Rcd 12315 (2000) (2 GHz Allocation & Relocation Proceeding).
   2
         “Service links” are the radio links that transmit a user’s messages in both directions between a user’s earth
terminal and the system’s satellite(s).
   3
       Letter of Intent of TMI Communications and Company, Limited Partnership, File No. 189-SAT-LOI-97,
IBFS No. SAT-LOI-19970926-00161 (TMI LOI) at Attachment 2, Section 6.
   4
         Id. at Attachment 2, Section 5.

                                                          1


                                   Federal Communications Commission                                   DA 01-1638

Because TMI proposes to serve the United States using a Canadian gateway for feeder link operations,5
Industry Canada will authorize TMI’s feeder link frequencies.6
        3.      TMI submitted its 2 GHz MSS Letter of Intent (LOI) on September 26, 1997.7 On
March 19, 1998, we sought comment on TMI’s LOI and other 2 GHz MSS applications.8 The
Commission subsequently adopted service rules for 2 GHz MSS systems.9 TMI amended its LOI to
address the requirements adopted in the 2 GHz MSS Order.10

                                             III.     DISCUSSION

         4.     Under rules adopted in the Commission’s 2 GHz MSS Order, TMI must demonstrate that
its system meets certain technical requirements. We address these requirements first. We then turn to
TMI’s request for service links in the 2 GHz MSS band. Next we review TMI’s regulatory classification,
implementation milestones, and orbital debris mitigation strategy. Finally, we dispose of various parties’
arguments against granting TMI’s letter of intent.




   5
          “Feeder links” are the radio links that transmit a user’s messages in both directions between the system’s
satellite(s) and its gateway earth station(s), connecting the MSS network with the public switched telephone network.
   6
         See TMI LOI at Attachment 2, Section 6 & Table 1. TMI’s selected feeder link frequencies within the
10.7-10.95 GHz, 11.2-11.45 GHz, and 12.75-13.25 GHz bands are available for Canadian system use at 106.5°
W.L., in accordance with Appendix 30B of the International Telecommunication Union (ITU) Radio Regulations.
Id.
   7
         A satellite system being licensed by a foreign administration, and seeking to obtain spectrum for service to
the United States, may file an LOI requesting that the Commission “reserve” spectrum for that system. We consider
an LOI request in a space-station processing round in anticipation that future earth station applications will seek
authority to access the non-U.S.-licensed satellite system. See Amendment of the Commission’s Regulatory Policies
to Allow Non-U.S. Licensed Space Stations to Provide Domestic and International Satellite Service in the United
States, IB Docket No. 96-111, Report and Order, 12 FCC Rcd 24094, 24173-74 ¶ 185 (1997) (DISCO II Order)
(describing the procedures under which foreign-licensed satellite systems may provide service in the United States).
To the extent TMI will be providing MSS to customers in the United States, the Commission has found that granting
TMI access to the United States is consistent with the DISCO II framework. See SatCom Systems, Inc. and TMI
Communications and Company, L.P., Order and Authorization, 14 FCC Rcd 20798 (1999) (SatCom/TMI Order).
   8
         See Public Notice, Report No. SPB-119 (rel., March 19, 1998). In response to this Public Notice, 11
comments, 2 reply comments, and 3 responses were filed specifically addressing TMI’s LOI. A list of pleadings is
attached in Appendix A.
   9
        The Establishment of Policies and Service Rules for the Mobile Satellite Service in the 2 GHz Band, IB
Docket No. 99-81, Report and Order, 15 FCC Rcd 16127 (2000) (2 GHz MSS Order).
   10
        TMI Letter of Intent Amendment, File No. SAT-AMD-20001103-00158 (Conforming Amendment); see
Public Notice, Report No. SAT-00061 (rel. November 29, 2000) (2 GHz MSS Amendment PN). No petitions to
deny or other objections or comments were filed on TMI’s Conforming Amendment in response to this Public
Notice.

                                                         2


                                      Federal Communications Commission                     DA 01-1638

A.        Technical Qualifications

          1.        Frequency Agility

        5.      Under the Commission’s service rules and policies, 2 GHz MSS systems must be capable
of operating across at least seventy percent of the United States’ 2 GHz MSS allocation in the 1990-2025
MHz and 2165-2200 MHz bands.11 The Commission also requires that 2 GHz MSS systems be capable
of operating without fixed frequency translations between the uplink and downlink frequencies.12 TMI’s
proposed system meets these requirements.13

          2.        GSO Coverage Requirements

         6.     Under the Commission’s rules, GSO 2 GHz MSS systems must be capable of providing
continuous coverage throughout all 50 states, Puerto Rico and U.S. Virgin Islands, if technically
feasible.14 TMI’s proposed system meets these requirements.15

B.        Service-Link Spectrum

        7.      The 2 GHz MSS Order adopted a hybrid band arrangement that divided the 2 GHz MSS
uplink (1990-2025 MHz) and downlink (2165-2200 MHz) bands into segments of equal bandwidth based
on the number of systems seeking assignments.16 The Commission determined that providing
3.5 megahertz in each direction for the nine then-pending system proponents would be sufficient to
commence operations.17 The Commission provided that, in the event not all system proponents proceed
toward authorization, the remaining system proponents would receive more than 3.5 megahertz of
spectrum in each direction upon authorization.18 In addition, the Commission reserved one additional
spectrum segment in each direction for expansion of system(s) by operator(s) meeting certain criteria for
service to unserved areas.19 The following formula expresses the amount of spectrum available for each
system in each direction of transmission:
          35 megahertz ÷ (Number of System Proponents + One) = Size of Each Spectrum Segment20
There are currently eight 2 GHz MSS system proponents participating in this processing round.21 We
will not at this time, however, implement that portion of the Commission’s 2 GHz MSS Order that would

     11
          2 GHz MSS Order, 15 FCC Rcd at 16152 ¶ 52.
     12
          Id. at ¶ 53.
     13
          Conforming Amendment at 4; TMI LOI at Attachment 2, Section 8.
     14
          47 C.F.R. § 25.143(b)(2)(iv).
     15
          Conforming Amendment at 4; TMI LOI at Attachment 2, Section 5 & Figure 1.
     16
          2 GHz MSS Order, 15 FCC Rcd at 16138 ¶ 16.
     17
          Id. at 16139 ¶ 17.
     18
          Id.
     19
          Id. at 16146-47 ¶¶ 35-39.
     20
          Id. at 16138 ¶ 16.

                                                       3


                                    Federal Communications Commission                                    DA 01-1638

give each system proponent access to more than 3.5 megahertz of spectrum in each direction on a
primary basis. Subsequent to release of the 2 GHz MSS Order, the Commission has received new
proposals for use of the 2 GHz MSS bands.22 Delaying the designation of additional spectrum will give
the Commission the opportunity to consider these proposals. Therefore, in this Order, TMI will receive
access to a spectrum segment of 3.5 megahertz, in each direction of transmission, on a primary basis, i.e.,
a “Selected Assignment.”23 TMI will choose its Selected Assignment such that the band edge of the
assignment is an integer multiple of 3.88 megahertz from the band edge of the 2 GHz MSS band, which
will allow the Commission to address the proposals before it.
        8.       TMI must identify the specific frequencies of its Selected Assignment when its satellite
reaches its intended orbit, and notify the Commission in writing of its selection.24 Consistent with the
2 GHz MSS Order, TMI may also elect to operate outside its Selected Assignment on a secondary basis
with respect to other 2 GHz MSS operators, subject to certain conditions.25

C.        Regulatory Classification

         9.      TMI plans to operate its 2 GHz MSS operations in the United States as a non-common
carrier.26 Under the Communications Act, Commission Rules, and consistent with our 2 GHz MSS
Order, we treat TMI’s space station operations as non-common carrier.27 We will address the regulatory
classification of any Commission-licensed earth stations operating as part of TMI’s system, if any, in
connection with earth station licensing.28



     21
          See 2 GHz MSS Amendment PN, Report No. SAT-00061.
     22
         See Ex parte Letter of New ICO Global Communications (Holdings) Ltd., IB Docket No. 99-81 (dated
March 8, 2001) (ICO Ex Parte Letter); Petition for Rulemaking of the Cellular Telecommunications & Internet
Association (filed May 18, 2001) (CTIA Petition).
     23
         Systems must be implemented consistent with the plans for incumbent relocation adopted in the 2 GHz
Allocation & Relocation Proceeding, Second Report And Order and Second Memorandum Opinion and Order, 15
FCC Rcd 12315, including the phased plan for relocation in the 1990-2025 MHz band.
     24
         2 GHz MSS Order, 15 FCC Rcd at 16138 ¶ 16. A satellite’s intended orbit is the final orbit it will occupy
to provide commercial service. Id. n.75.
     25
         Id. at 16139-40 ¶ 19. The 1990-2025 MHz (Earth-to-space) and 2165-2200 MHz (space-to-Earth) bands
are immediately adjacent to the 2025-2110 MHz (Earth-to-space, space-to-space) and 2200-2290 MHz (space-to-
Earth, space-to-space) bands, respectively, where the Federal Government has extensive satellite network operations.
 To avoid the possibility of adjacent band interference, this potential interference situation needs to be considered by
both non-Government and Government satellite operators when implementing their respective satellite systems near
the band edges.
     26
          TMI LOI at 7.
     27
          47 U.S.C. §§ 153(44), 332(c)(5); 47 C.F.R. § 20.9(a)(10); 2 GHz MSS Order, 15 FCC Rcd at 16173 ¶ 95.
     28
        We also note that the Commission will address issues concerning protection for aeronautical
radionavigation in the 1559-1610 MHz band from the out-of-band emissions of 2 GHz MSS mobile earth terminals
(METs) in the pending Global Mobile Personal Communications by Satellite (GMPCS) rulemaking, and the 2 GHz
MSS METs will be subject to applicable rules and policies the Commission will adopt in that proceeding. 2 GHz
MSS Order, 15 FCC Rcd at 16196-97 ¶ 163 (citing Amendment of Parts 2 and 25 to Implement the Global Mobile

                                                           4


                                   Federal Communications Commission                                   DA 01-1638

D.        Implementation Milestones

        10.    The 2 GHz MSS Order adopted milestones for implementation that apply to 2 GHz MSS
systems.29 Consistent with the 2 GHz MSS Order, therefore, TMI must observe the following milestone
requirements:
                 Milestone                                                Deadline
                 Enter Non-contingent Satellite Manufacturing             12 months after authorization
                 Contract
                 Complete Critical Design Review (CDR)                    24 months after authorization
                 Begin Physical Construction of All Satellites            36 months after authorization
                 Complete Construction of One Satellite                   60 months after authorization
                 and Launch It Into Its Assigned Orbital Location
                 Certify Entire System Operational                        72 months after authorization

         11.      TMI must describe the status of system construction and operation in its annual reports,
and file a certification with the Commission within ten days following each of the milestones specified
above.30

E.        Orbital Debris Mitigation

        12.      Currently, the FCC addresses issues regarding orbital debris and satellite systems on a
case-by-case basis, under the general “public interest, convenience and necessity” standard in the
Communications Act.31 To facilitate our orbital debris analysis, under Section 25.143(b)(1) of our rules,
2 GHz MSS system proponents are required to “describe the design and operational strategies that they
will use, if any, to mitigate orbital debris.”32 This rule also requires 2 GHz MSS system proponents to
“submit a casualty risk assessment if planned post-mission disposal involves atmospheric re-entry of the
spacecraft.”33
        13.   In adopting this requirement, the Commission indicated that applicants may wish to
consult the National Aeronautics & Space Administration (NASA)/Department of Defense (DoD)
Guidelines on Debris Mitigation, as well as the International Telecommunication Union (ITU)

Personal Communications by Satellite (GMPCS) Memorandum of Understanding and Arrangements, IB Docket
No. 99-67, Notice of Proposed Rule Making, 14 FCC Rcd 5871 (1999)).
     29
          2 GHz MSS Order, 15 FCC Rcd at 16177-78 ¶ 106.
     30
         See 47 C.F.R. § 25.143(e)(1) (requiring satellite space-station operators to file annual reports with the
Commission every October 15); Id. § 25.143(e)(3) (requiring satellite space-station operators to file a certification
with the Commission within 10 days of a system implementation milestone).
     31
          47 U.S.C. § 303.
     32
         47 C.F.R. § 25.143(b)(1), as amended by the 2 GHz MSS Order, 15 FCC Rcd at 16205. The Commission
also stated that it intends to commence a rulemaking proceeding proposing to explore orbital debris mitigation
issues. 2 GHz MSS Order, 15 FCC Rcd at 16188 ¶ 138.
     33
          47 C.F.R. § 25.143(b)(1), as amended by the 2 GHz MSS Order, 15 FCC Rcd at 16205.

                                                         5


                                    Federal Communications Commission                                   DA 01-1638

Recommendation on disposal of geostationary satellites.34 The NASA/DoD Guidelines identify four
main objectives: 1) controlling debris released during normal operations; 2) minimizing debris generated
by accidental explosions; 3) selecting safe flight profiles and operational configurations; and 4) providing
for post-mission disposal of space structures.
         14.     Under the NASA/DoD Guidelines, these objectives are accomplished by a number of
means.35 The first objective – controlling debris released during normal operations – is addressed by
minimizing the amount of debris released in a planned manner during normal operations. The second
objective – minimizing debris generated by accidental explosions – is addressed by limiting the risk to
other space systems from accidental explosions both during mission operations and after completion of
mission operations. For mission operations, this is accomplished through analysis of credible failure
modes and development of methods to limit the probability they will occur. Post-mission, this is
accomplished through depletion of all sources of stored energy on board the spacecraft when they are no
longer required for mission operations or post-mission disposal. The third objective – selecting a safe
flight profile and operational configuration – is addressed through estimating and limiting the probability
of collision with large objects during orbital lifetime, and the probability of disabling collisions with
small debris during mission operations.
         15.      The fourth objective in the NASA/DoD Guidelines – providing for post-mission disposal
of space structures – is met by planning for disposal of a spacecraft at the end of mission life to minimize
impact on future space operations. This is accomplished through one of two options relevant here. The
first option is atmospheric reentry, i.e., leaving the structure in an orbit in which it will remain in orbit for
no longer than 25 years after mission completion. Under this option, it is also necessary to address the
casualty risk from any portions of the spacecraft that may survive atmospheric reentry. The second
option is maneuvering to a storage orbit. There are three suggested storage orbits. The first is between
low and middle Earth orbit, i.e., satellite perigee altitude above 2,000 kilometers and apogee altitude
below 19,700 kilometers. The second is between middle and geosynchronous Earth orbit, i.e., perigee
altitude above 20,700 kilometers and apogee altitude below 35,300 kilometers. The third is above
geosynchronous Earth orbit, i.e., perigee altitude above 36,100 kilometers (or approximately 300
kilometers above geosynchronous altitude). In addition to the NASA/DoD guidelines, and as the
Commission observed in the 2 GHz MSS Order,36 the ITU has developed a recommendation concerning
operations in the GSO.37
        16.     Each of the 2 GHz MSS systems submitted a narrative statement concerning orbital
debris mitigation. We note that, to the extent that the statements address debris mitigation issues
involving launch vehicle operations, we have neither reviewed nor concluded the plans disclosed are

   34
         See 2 GHz MSS Order, 15 FCC Rcd at 16118 ¶ 138.
   35
        See The Establishment of Policies and Service Rules for the Mobile Satellite Service in the 2 GHz Band, IB
Docket No. 99-81, 14 FCC Rcd 4843, 4901-03 (1999) (Appendix C).
   36
         2 GHz MSS Order, 15 FCC Rcd at 16118 ¶ 138.
   37
          Recommendation ITU-R S.1003. The recommendation suggests, in pertinent part, that a geostationary
satellite at the end of its life should be transferred before complete exhaustion of its propellant, to a
“supersynchronous graveyard orbit that does not intersect the GSO,” with GSO defined as the mean earth radius of
42,164 kilometers plus or minus 300 kilometers. The recommendation also notes that what constitutes “an effective
graveyard orbit” requires further studies. In this regard, we note that orbital perturbations due to solar and lunar
gravitation, solar pressure, or other sources, may, over time, result in an inactive satellite’s orbit intersecting the
GSO, as defined by the ITU recommendation, even if the initial disposal altitude does not intersect the GSO.

                                                          6


                                   Federal Communications Commission                                 DA 01-1638

appropriate.38 We also note that, to the extent debris mitigation plans for MSS systems change, the
system proponents should evaluate those changes to determine whether disclosure and/or prior approval
is required.39
        17.      In its Conforming Amendment, TMI addressed orbital debris mitigation issues for
operations, including debris release and collision with uncontrolled objects.40 However, TMI did not
address limiting the risk to other space systems from accidental explosions during mission operations.
Given the importance of this issue in mitigating debris generation, we require TMI to submit a further
statement indicating its intent in this respect. Also, although TMI stated its strategy for minimizing the
possibility of collision with “uncontrolled” objects, TMI did not discuss controlled objects. We expect
TMI and other 2 GHz MSS systems to develop appropriate operational plans and procedures to minimize
the possibility of collision with large, known objects.41
          18.     TMI also addressed end-of-mission orbital debris mitigation issues. It stated that “the
satellite orbit will be raised by a minimum of 100 km on all sides . . . .”42 It is unclear what this statement
means, but if it is intended to define a disposal strategy in which the satellite’s perigee altitude would be
raised to 100 kilometers above the nominal geostationary orbit, the strategy is not consistent with the ITU
recommendation on disposal of spacecraft in geostationary orbit.43 Therefore, we require TMI to
supplement its narrative statement by providing greater specificity regarding the storage orbit parameters
selected for disposal of its satellite. TMI also did not address the depletion of stored energy sources
after system disposal. We require a further statement from TMI stating its intent in this regard. Each of
the three required supplements to TMI’s orbital debris narrative statement are to be submitted no later
than six months prior to the CDR milestone.44

F.        Other Issues

       19.     AT&T Wireless Services, Inc., Cingular Wireless LLC, Sprint PCS, and Verizon
Wireless (Wireless Carriers) in a recent joint letter requested the Commission to defer grant of the
pending 2 GHz MSS applications until (1) public comment is sought and received on the implications of
New ICO Global Communications (Holdings) Ltd.’s (ICO’s) March 8, 2001 ex parte letter proposing
amendment of the 2 GHz MSS service rules to permit licensees to incorporate an “ancillary terrestrial
component” into their 2 GHz MSS networks; and (2) the Commission considers a petition for rule
     38
        The United States licensing authority for commercial launches is the Federal Aviation Administration. See
14 C.F.R. § 400 et seq.
     39
        See 47 C.F.R. §§ 1.65, 25.117(a). See also 2 GHz MSS Order, 15 FCC Rcd at 16179 ¶ 108 (system
modifications requiring prior FCC approval should be identified well in advance of the CDR milestone).
     40
          Conforming Amendment at 4-5.
     41
         See, e.g., Amendment to Pending Application of Iridium LLC, SAT-AMD-20001103-00156 (November 3,
2000) at Exhibit 1, p.2.
     42
          Conforming Amendment at 5.
     43
         See Recommendation ITU-R S.1003. See also Disposal of satellites in geosynchronous orbit, Report by the
Secretariat, United Nations Committee on Peaceful Uses of Outer Space, UN Document A/AC.105/734 (17
December 1999), at p.4 and Table 3.
     44
          In addition, we would not anticipate issuing an authorization for handset operations in the United States
until this issue has been resolved.

                                                        7


                                       Federal Communications Commission                               DA 01-1638

making submitted by the Cellular Telecommunications & Internet Association (CTIA) requesting that the
2 GHz MSS bands be reallocated for other uses, such as terrestrial wireless services.45 For the reasons
set forth in the ICO Order issued contemporaneously with this Order, we deny the Wireless Carriers’
request to defer action on the 2 GHz MSS applications.46
         20.      The Boeing Company (Boeing) and Mobile Communications Holdings, Inc. (MCHI)
filed Petitions to Deny TMI’s LOI, on the ground that TMI seeks to use globally allocated MSS spectrum
exclusively for regional-only operations.47 The Commission’s 2 GHz MSS Order addressed this concern,
stating that all 2 GHz MSS applicants will be permitted to operate anywhere in the 2 GHz MSS bands, as
the most equitable mechanism for assigning the available spectrum in light of the incumbent relocation
process.48
         21.     MCHI further argues that TMI has failed to establish its qualifications to provide satellite
services in the United States from a non-U.S.-licensed satellite because, inter alia, TMI has not
demonstrated that it holds a Canadian license to provide 2 GHz MSS service, nor that it is “well along in
the licensing process.”49 Under the Commission’s rules established in the DISCO II proceeding, we may
designate spectrum for a foreign entrant if it has submitted “proof that it is pursuing a license from a
foreign administration.”50 One of the indicia we use to determine whether a foreign entrant may be
considered contemporaneously with U.S. satellite systems in a processing round is if the foreign entrant’s
system “has been submitted for coordination to the International Telecommunication Union.”51 Industry
Canada has submitted a 2 GHz MSS filing for Advance Publication of Information to the ITU,52 and “is
currently in the process of coordinating the associated space station internationally.”53 In addition, TMI
has begun the process of getting a license to operate a 2 GHz MSS system in Canada.54 We believe that
these facts are sufficient to allow us to designate spectrum to TMI in this Order today. However, we
caution TMI that delay in approval of its request for a Canadian license will not toll the milestones

   45
          Letter to Michael K. Powell, Chairman, Federal Communications Commission from Douglas Brandon,
AT&T Wireless Services, Inc., Brian F. Fontes, Cingular Wireless, LLC, Luisa L. Lancetti, Sprint Corporation, and
John T. Scott, III, Verizon Wireless, IB Docket No. 99-81 (dated June 13, 2001) (citing the ICO Ex Parte Letter and
CTIA Petition). Accord Ex parte Letter of CTIA, IB Docket No. 99-81 (dated July 12, 2001). But see Ex parte
Letter of Globalstar, L.P., IB Docket No. 99-81 (dated July 2, 2001) (objecting to the Wireless Carriers’ request); Ex
parte Letter of Celsat America, Inc., IB Docket No. 99-81 (dated June 25, 2001) (same).
   46
       See ICO Services Limited, Letter of Intent to Provide Mobile-Satellite Service in the 2 GHz Bands, Order,
DA 01-1635, at ¶¶ 29-31 (Int’l Bur./OET, rel. July 17, 2001).
   47
        Petition to Deny or Hold in Abeyance of The Boeing Company at 5-7; Petitions to Deny and Comments of
Mobile Communications Holdings, Inc. at 19-20. See also Consolidated Comments and Petition to Deny of Iridium
LLC at 9-10; Consolidated Reply of Iridium LLC at 9-10.
   48
         2 GHz MSS Order, 15 FCC Rcd at 16137-38 ¶ 15.
   49
         Petitions to Deny and Comments of Mobile Communications Holdings, Inc. at 17-19.
   50
         DISCO II Order, 12 FCC Rcd at 24178 ¶ 196.
   51
         47 C.F.R. § 25.137(c)(iii).
   52
         TMI LOI at Attachment 3.
   53
       See Letter of Chantal Beaumier, Director, Space and International Regulatory Activities, Industry Canada,
to Thomas S. Tycz, Chief, Satellite and Radiocommunication Division, FCC (May 18, 2001) at 2.
   54
         Id.

                                                          8


                                Federal Communications Commission                            DA 01-1638

imposed herein. Furthermore, no U.S.-based earth stations shall be authorized to operate with TMI’s 2
GHz MSS system until TMI has received its Canadian license.55 Finally, prior to handling 2 GHz MSS
communications originating or terminating from mobile terminals in the United States via its Canadian
gateway, TMI may need to address law enforcement and national security concerns.56
      22.    Therefore, for the reasons set forth above, we deny Boeing’s and MCHI’s Petitions to
Deny TMI’s LOI.

                                    IV.     ORDERING CLAUSES

        23.      Accordingly, IT IS ORDERED that the Letter of Intent, File No. 189-SAT-LOI-97; IBFS
Nos. SAT-LOI-19970926-00161 and SAT-AMD-20001103-00158 IS GRANTED, TMI Communications
and Company, Limited Partnership IS RESERVED radio-frequency spectrum to operate its proposed
mobile-satellite system to provide service in the United States in the 1990-2025 MHz and 2165-2200
MHz frequency bands, in accordance with the technical specifications set forth in its Letter of Intent, as
amended, and the conditions set forth in the preceding paragraphs and consistent with our rules, unless
specifically waived herein, and subject to the following conditions:
            a. TMI Communications and Company, Limited Partnership must choose a Selected
               Assignment in the 1990-2025 MHz and 2165-2200 MHz frequency bands upon launch of
               its satellite into its authorized geostationary satellite orbit and commencement of
               operations by that satellite;
            b. The Selected Assignment shall give TMI Communications and Company, Limited
               Partnership access to 3.5 megahertz in each direction of transmission on a primary basis;
            c. The Selected Assignment shall be chosen such that the band edge of the assignment is an
               integer multiple of 3.88 megahertz from the band edge of the 2 GHz MSS band; and
            d. Operations in frequencies in these bands outside the Selected Assignment shall be on a
               secondary basis with respect to operations of other 2 GHz MSS systems.
         24.      IT IS FURTHER ORDERED that this Order shall become NULL and VOID with no
further action required on the Commission’s part in the event the space station is not constructed,
launched and placed into operation in accordance with the technical parameters and terms and conditions
of the authorization by the following dates:
            Milestone                                                        Deadline
            Enter Non-contingent Satellite Manufacturing Contract          July 17, 2002
            Complete Critical Design Review                                July 17, 2003
            Begin Physical Construction of All Satellites                  July 17, 2004
            Complete Construction of One Satellite and Launch It           July 17, 2006
            Into Its Assigned Orbital Location
            Certify Entire System Operational                              July 17, 2007

  55
        DISCO II Order, 12 FCC Rcd at 24177 ¶¶ 195-196.
  56
        See, e.g., 2 GHz MSS Order, 15 FCC Rcd at 16169 ¶ 86; SatCom/TMI Order, 14 FCC Rcd at 20823-24
¶¶ 55-58, 20829-45 Appendix A.

                                                    9


                                Federal Communications Commission                             DA 01-1638

          25.    IT IS FURTHER ORDERED that the Petition to Deny or Hold in Abeyance of The
Boeing Company (filed May 4, 1998), and the Petition to Deny of Mobile Communications Holdings,
Inc. (filed May 4, 1998) ARE DENIED.
         26.     IT IS FURTHER ORDERED that no earth stations shall be authorized to operate with
the TMI Communications and Company, Limited Partnership 2 GHz MSS system until TMI
Communications and Company, Limited Partnership has received a 2 GHz Mobile-Satellite Service
license from Industry Canada and has certified to the Commission that the Canadian licensing process for
the TMI satellite network has been completed;
       27.    IT IS FURTHER ORDERED that this Order is subject to change by summary order of
the Commission on 30 days’ notice and does not confer any permanent right to use the spectrum.
        28.    IT IS FURTHER ORDERED that TMI Communications and Company, Limited
Partnership may decline this ruling as conditioned within 30 days of the date of the release of this Order.
Failure to respond within this period will constitute formal acceptance of the authorization as
conditioned.
        29.      This Order is issued pursuant to Section 0.261 of the Commission’s rules on delegations
of authority, 47 C.F.R. § 0.261, is effective upon release.

                                                 FEDERAL COMMUNICATIONS COMMISSION




                                                 Donald Abelson
                                                 Chief, International Bureau




                                                    10


                               Federal Communications Commission                       DA 01-1638

                                           APPENDIX A

              LIST OF PLEADINGS ADDRESSING TMI’S LETTER OF INTENT


Filed May 4, 1998

Petition to Deny of Hold in Abeyance of The Boeing Company
Comments of Celsat America, Inc.
Comments of Constellation Communications, Inc.
Consolidated Comments of ICO Services Limited
Consolidated Comments and Petition to Deny of Iridium LLC
Petitions to Deny and Comments of Mobile Communications Holdings, Inc. at 17-20
Comments of Bell Atlantic
Consolidated Petition to Deny, Petition to Defer, and Comments of GE American Communications, Inc.
Comments of Hughes Communications Galaxy, Inc.
Comments of the Fixed Point-to-Point Communications Section, Wireless Telecommunications
         Division, Telecommunications Industry Association (limited to feeder link issues)
Comments of the Wireless Cable Association International, Inc.


Filed June 3, 1998

Consolidated Reply Comments of Mobile Communications Holdings, Inc.
Comments and Opposition to Petitions to Deny or to Hold in Abeyance of TMI Communications and
       Company, Limited Partnership


Filed June 18, 1998

Consolidated Reply of The Boeing Company at 17-21
Consolidated Reply of Iridium LLC at 9-10
Response of the Wireless Communications Association International, Inc.




                                                  11



Document Created: 2001-07-19 15:59:57
Document Modified: 2001-07-19 15:59:57

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC