                                      BEFORE THE
                                                                      COPY
           fedveral Communications Commidgsto
                                                                              gECEIVED
                                 WASHINGTON, D.C. 20@909\\13                     APR 1 9 1995
                                                                      1   FEDERALCOMMUNICATIONS COMMISSION
                                                      ‘apR 2 4 1995              OFFiCEOfSEcRETARY
                                                                and
In the Matter of the Application of               dimg:}:fi:g   gons Division
                                                Ra International BureaU

FINAL ANALYSIS COMMUNICATION               )
SERVICES, INC.                             )       File Nos.       5—SAT—P/LA—95
                                           )                      76 SAT—AMEND—95
For Authority to Construct, Launch         )
and Operate a Non—Voice, Non—              )
Geostationary Low Earth Orbit              )
Mobile Satellite System                    )

To:    Chief, International Department




                 CONSOLIDATED REPLY TO COMMENTS AND
                    OPPOSITION TO MOTION TO DISMISS


       Final Analysis Communication Services, Inc. ("Final Analysis"), by its attorneys,

hereby submits its "Consolidated Reply" to the "Comments" pertaining to Final Analysis‘

February 24, 1995 Amendment filed by STARSYS Global Positioning, Inc. ("STARSYS")

and Orbital Communications Corporation ("ORBCOMM"); and its "Opposition" to the

Motion to Dismiss filed by Leo Dne USA Corporation ("Leo One"). As demonstrated

below, the February 24, 1995 Amendment decreases overall frequency use and removes

existing conflicts; accordingly, the Commission‘s rules do not require that the
Amendment be considered a "new application."


                                                    DISCUSSION

1.        Overview



          Final Analysis filed an Amendment to its November 16, 1994 Application on

February 24, 1995. in pertinent part, the Amendment made slight adjustments to the

proposed frequency plan in the 137—138 MHz band, and repositioned the center frequency

of the dedicated ground station link in the 148—150 MHz band. These changes were
required to reduce potential conflicts with Meteorological Satellites ("MetSats") and

ORBCOMM, and to ensure a clear channel for Final Analysis‘ ground station. In the

course of this revision, Final Analysis also reduced its overall proposed use of spectrum by

employing narrower, 15 KHz channels in the 137—138 MHz band, and reducing the data

bit transfer rate. In addition, Final Analysis deleted an entire 50 KHz channel in the 400

MHz band.



          The net effect of these changes was to reduce the overall frequency use profile of

the application, and make it easier to coexist with both existing and proposed users,
limiting the potential for harmful interference.‘




! Although Final Analysis has used every effort in good faith to avoid, eliminate or reduce potential frequency
conflicts with other pending applicants, the Commission has pointed out that its principal interest is in
determining whether the pending applications can coexist with systems that are a/recdy /icensed. Thus, issues
raised by unlicensed applicants such as STARSYS, or Leo One concerning whether Final Analysis® proposed
system is compatible are at best premature. The applications were not designed to be compatible with each
other. As stated by the Chief of the Sateilite and Radiocommunication Division of the International Bureau in a
November 2, 1994 Letter to Albert Catalano of Catalano & Jarvis, P.C.:

             . {wle see no particular benefit to be gained from analyzing, at this point, the technical
          interplay among applications that were not designed to be compatible with each other. Our
          focus in analyzing the second round applications will be whether these systems will be
          designed, in accordance with our rules, to co—exist with previously—licensed systems.

November 2. 1994 Letter of Thomas S. Tycz, Chief, Satellite and Radiocommunications Division,
International Bureau, to Albert J. Catalano, Catalano & Jarvis, P.C. at 2 § 2 (emphasis supplied). A photocopy
of this letter is attached as "Exhibit 2" hereto.
                                                         br


       Final Analysis‘ Amendment also proposed to change some aspects of its satellite

placement in its constellation, to take advantage of launch efficiencies. However, the table

supplied in the Amendment contains inadvertent clerical errors, creating the false

impression that new orbital locations were being proposed. This error is corrected by

Errata filed with the Commission concurrently herewith.



       The Commission‘s rules state that an amendment will be deemed to be a "major

amendment" (in pertinent part) if the amendment ". . . changes the proposed frequencies

or orbital locations to be used." 47 C.F.R. § 25.116(b)(1).        However, the filing of an

amendment, even if it is deemed to be a "major amendment" under the Commission‘s
Rules, will not be considered to be a newly—filed application if


       (1)     The amendment resolves frequency conflicts with authorized
               stations or other pending applications but does not create new or
               increased frequency conflicts;



       (3)     The amendment corrects typographical, transcription, or similar
               clerical errors which are clearly demonstrated to be mistakes by
               reference to other parts of the application, and whose discovery
               does not create new or increased frequency conflicts; or

       (4)     The amendment does not create new or increased frequency
               conflicts, and is demonstrably necessitated by events which the
               applicant could not have reasonably foreseen at the time of filing.


47 C.F.R. § 25.116(c)(1) et seq.

       Final Analysis‘ February 24, 1995 Amendment is clearly within one or more of the

exceptions set forth in Section 25.116(c) of the Commission‘s Rules.       For example, the

changes in the 137—138 MHz band are required due to unforeseen developments in the

planned use by MetSats, as recently revealed by Government representatives in connection

with industry preparations for WRC—95. As noted in the Amendment, these channels in


the 137—138 MHz band will nor be vacated in the near future by the MetSats as was

previously assumed by all. In addition, these and other changes by Final Analysis have the

overall effect of greatly reducing potential conflicts, and do not create new or increased

conflicts.



        Accordingly, Final Analysis‘ February 24, 1995 Amendment is not a "newly—filed"

application under the Commission‘s Rules.


I.      Comments of STARSYS


        STARSYS asserts, without any detailed justification or technical support that the

proposed changes set forth in Final Analysis‘ February 24, 1995 Amendment would
increase, rather than decrease, interference to STARSYS‘ system, because "the newly

specified channels are now congregated closer to the STARSYS center frequency at 137.5

MHz than in the original application." STARSYS Comments at 2.        STARSYS concludes

that "{t}ransmissions on any one of these channels within a STARSYS ground station main

beam would cause interference to the STARSYS system." STARSYS Comments at 2—3.

Undercutting its own rhetorical position, however, STARSYS remarks in a parenthetical

that "Final Analysis has eliminated a channel with the identical center frequency."
STARSYS Comments at 2.



        STARSYS‘ unsupported assertion that the revised frequency plan proposed by

Final Analysis would increase interference to its system is entirely false and should be

disregarded. In fact, it is unquestionable that the changes proposed by Final Analysis

would decrease the potential for interference to STARSYS. Final Analysis has reduced its

overall frequency use by 140 KHz, and has reduced the width of its channels in the 137—

138 MHz band by 40 percent, from 25 KHz to 15 KHz. Moreover, Final Analysis‘ signals
are to be cross—polarized with STARSYS‘, significantly reducing the potential for any


conflicts. An«. as STARSYS itself has pointed out, Final Analysis eliminated entirely a

channel with the center frequency of 137.5 MHz! Finally, Final Analysis has eliminated an

entire 50 KHz channel in the 400 MHz band to resolve a potential conflict with

STARSYS. There is no question but that STARSYS‘ overall position vis d vis Final Analysis

would be greatly improved with the acceptance of the February 24, 1995 Amendment.



       Although Final Analysis scarcely expected an outpouring of gratitude from the

other competing applicants, any reasonable and objective technical assessment of what has

been proposed by Final Analysis would conclude that STARSYS, as well as the other

applicants affected, should be jumping for joy. Final Analysis has determined to reduce its

overall spectrum requirements in favor of more peaceful coexistence with existing users

and applicants —— the amended application leaves more room for the other applicants,

including STARSYS,      to ply their trade. It is the height of cynicism for STARSYS to

attempt to leverage this relatively beneficial action on Final Analysis‘ part into a rhetorical
weapon using the Commission‘s procedural rules.



        From the outset of this proceeding, STARSYS has been asserting that the second

round applicants are not allowed to use techniques such as cross—polarization to attempt to

coexist with first round applicants. STARSYS‘ position appears to be that this technique

just does not work, or at least it does not work unless lawyers have haggled over it for

months at great expense. But this is not a legal matter: it is simply a matter of physics.

The fact is that cross—polarization not only works as a technique, but it is a solution to
conflicts that has been accepted by the Commission in its licensing of ORBCOMM. To

claim, as STARSYS does, that the rules of physics are suspended only for the second

round applicants is not only disingenuous, but inconsistent with its own previous positions
                                              Un


before the Commission. In particular, the Frequency Sharing Plan was designed to leave

room for the entry of future applicants."



         STARSYS also claims that Final Analysis‘ shrinking of the proposed channels in the

137—138 MHz band from 25 KHz to 15 KHz results in an increase in the power flux

density from —137.2 dBW/m2/4 KHz to —130.8 dBW/m2/4 KHz. STARSYS Comments

at 4. This change, however, as STARSYS itself points out, is still substantially below the

—125 dBW/m2/4 KHz threshold established by the ITU at WARC—92. See International

Footnote 599A. This slight increase in power flux density has no effect whatsoever on the

interference picture (nor does STARSYS even assert that it does). STARSYS does assert,

however, that Final Analysis‘ changes "appear to result" in an excessive power flux density.

STARSYS Comments at 4. This, however, is only an unfounded assertion, and there is no

indication that any qualified engineer made such an assessment. Accordingly, it is not

entitled to credence.



         Finally, STARSYS complains that Final Analysis‘ repositioning of its 50 KHz

dedicated ground station uplink channel "would be likely to cause interference to

STARSYS‘ uplinks on adjacent frequencies when a Final Analysis satellite and a STARSYS

7            20.                       2.   ~            .   .    ~                                  .
"The Commission‘s Rules make provision for the coordination of frequency usage betrween new applicants and
existing licensees or permittees. See 47 C.F.R. § 25.142(b)(3):

         Applicants for authority to establish non—voice, non—geostationary mobile—satellite service
         systems are encouraged to coordinate their proposed frequency usage with existing
         permittees and licensees in the non—voice, non—geostationary mobile—satellite service whose
         facilities could be affected by the new proposal in terms of frequency interference or
         restricted system capacity. All affected applicants, permittees, and licensees shall, at the
         direction of the Commission, cooperate fully and make every reasonable effort to resoive
         technical problems and conflicts that may inhibit effective and efficient use of the radio
         spectrum ...

STARSYS can rest assured that, when it obtains its license or permit, Final Analysis will make every good faith
effort to resoive technical problems in cooperation with the Commission‘s instructions. Until STARSYS
obtains such authorization, however, this coordination effort is neither required nor feasible.


satellite are both within the filed of view of a Final Analysis ground station." STARSYS

Comments at 4. Again, however, STARSYS overlooks the fact that Final Analysis‘ channel

is cross—polarized with that of STARSYS.                In addition, Final Analysis is employing a

modulation technique that diminishes the side lobes of its transmissions. Accordingly,

there is no basis for assuming that interference is increased.             Moreover, any marginal

interference issues can be addressed by the installation of adequate filtering at Final

Analysis‘ ground station.?


IL.         mments       of    BCOMM


        ORBCOMM begins its comments by reiterating the assertions concerning Final

Analysis‘ financial qualifications it previously made in its February 24, 1995 submission.

ORBCOMM Comments at 2—3. However, these issues have been addressed by Final
Analysis at length in its April 10, 1995 "Consolidated Opposition to Petitions to Deny

and Consolidated Reply to Comments." As demonstrated therein, Final Analysis is well—
qualified to perform on its financial and technical commitments in accordance with the

requirements of the Commission‘s Rules.



        ORBCOMM then notes that Final Analysis does, in fact, reduce potential

interference to ORBCOMM‘s system.                  ORBCOMM Comments at 3.                   However,

ORBCOMM renews its complaints as to the adequacy of information concerning Final

Analysis‘ > "STARS" technology. This, also, has been addressed in the above—mentioned

April 10, 1995 filing, however.




3Indeed, STARSYS itseif recognizes that such filtering would take care of the problem.    See STARSYS
Comments at 4. This is a coordination issue that is best addressed at the point that STARSYS obtains its
authorization for operation from the Commission.
                                                   N1


          Finally, ORBCOMM asserts that the proposed Amendment "does not eliminate

conflicts in the 137—138 MHz band with ORBCOMM‘s proposed modification."
ORBCOMM Comments at 3. However, it has always been Final Analysis‘ position that

ORBCOMM has no business filing that modification for consideration at this point. As

noted by Final Analysis in its Petition to Deny ORBCOMM‘s modification, the

modification is nothing less than a blatant anti—competitive spectrum grab specifically

designed to bar new applicants from the scarce remaining spectrum.4t                              In addition,

ORBCOMM‘s modification is effectively a rejection of the license terms proffered to it

by the Commission. Accordingly, that modification request is not entitled to protection

by second round applicants, and should itself be soundly rejected by the Commission."


III.     of

         Leo One seeks the dismissal of Final Analysis‘ Amendment based on the

assumption that it increases interference and changes the orbital locations to be used. As

noted above, however, with respect to STARSYS‘ comments, the power flux density

variation is related to slimming down the channel widths in the 137—138 MHz band,

reducing overall frequency use. And, to be sure, the power flux density is still well under


*As pointed out previously by Final Analysis, the ORBCOMM modification was carefully designed to shore up
the last remaining spectrum "gaps" left after the first round applicants specified their systems. The modification
eats up an additional 90 KHz of spectrum, none of which is necessary to the viability of ORBCOMM‘s system,
but all of which is absolutely crucial to the viability of the second round applicants‘ systems. Accordingly, and
especially in view of the many representations made by ORBCOMM and other first round applicants that there
would be "room" for additional applicants, basic fairness and the public interest require the rejection of
ORBCOMM‘s modification.

2ORBCOMM contends in a footnote that Final Analysis‘ Amendment creates new conflicts with Leo One, E—
Sat and GE Americom by proposing to move into the Transit Band. Comments of ORBCOMM at 4 n.8. But
this is not accurate: first of all, E—Sat empioys CDMA, and it would appear that an FDMA system such as Final
Analysis‘ can coexist peacefully with such a use. In addition, Final Analysis does not consider Leo One to occupy
any Transit Band frequencies, since Leo One attempted to move into the band in an "Errata" filing which is
clearly a major amendment. Leo One‘s failure to pay the required fee for an amendment to its application
requires the rejection of the Errata. Accordingly, Leo One is not entitled to protection for its proposed use in
that band. Finally, Final Analysis intends to negotiate an engineering solution with GE Americom on the
proposed use of the Transit Band that will be acceptable to both parties.


the —125 dbW/m2/4 KHz threshold set by the Rules. As a matter of fact, the power flux

density is still well below that proposed by Leo One in its application. In sum, the

potential for interference is not increased by this change.



          In addition, Leo One‘s allegation that the "orbital locations" of Final Analysis‘

satellites has been changed is erroneous.                  In fact, the apparent change in the "mean

anomalies" of the satellites in the Amendment was the result of an inadvertent clerical

error that has been corrected in "Errata" filed by Final Analysis concurrently herewith.

Moreover, as Leo One should be well aware, the Commission has already ruled that the

"orbital locations" issue is inapposite to the NVNG MSS® Thus, no further discussion of
this issue is necessary.


          Finally, Final Analysis continues to be amazed at the alacrity with which Leo One

attempts to attack other applicants for supposed flaws which are most conspicuous in its

own filings. As can be seen from even the most cursory review of Leo One‘s September 1,

1994 Application and November 16, 1994 Amendment, Leo One‘s own frequency plan, as

amended, has conflicts that are much more serious than the fictitious interference

problems it alleges with respect to Final Analysis. A few of the many glaring frequency
conflicts in Leo One‘s amended application are set forth in a table attached as "Exhibit 3"

hereto.




6In its licensing order pertaining to ORBCOMM, Orbital Communications Corporation, FCC 94—268
(released October 27, 1994), the Commission categorically rejected the argument of dbX that ORBCOMM
had filed a new application by changing its orbital locations in an amendment filed after the filing cuc—off date:

          Further, any discussion of orbit locations is inapposite here, as LEO systems operate in orbital
          planes, and are not assigned to specific —— and scarce —— geostationary orbital slot.

At a maximum, Leo One‘s attempt to exhume this moribund argument after it was soundly interred by the
Commission shows lack of good faith; at a minimum, it is an utter waste of time for all concerned.


                                    CONCLUSION


       In view of the foregoing, Final Analysis respectfully requests that the Commission

reject the comments filed by STARSYS and ORBCOMM, and the Motion to Dismiss

filed by Leo One.

                                             Respectfully submitted,

                                            FINAL ANALYSIS COMMUNICATION
                                            SERVICES, INC.



                                            n, tu1t? Cff_
                                                    Albert J. Catalano




                                                    Ronald J. Jarvis


                                            Its Attorneys

                                            CATALANO & JARVIS, P.C.
                                            1101 30th Street, N.W., Ste 300
                                            Washington, D.C. 20007
                                            Telephone: (202) 338—3500
Dated: April 19, 1995                       Facsimile: (202) 333—3585




                                            10


Exhibit 1:   Declaration of Burton J. Levin, Ph.D.


                      Declaration of Burton J. Levin, Ph.D.


        I, Burton J. Levin, Ph.D., hereby declare under penalty of pegjury as
follows:

        1.     I am the technically qualified person responsible for the preparation
               of the technical information contained in the foregoing
               "Consolidated Reply to Comments and Opposition to Motion to
               Deny" (the "Consolidated Reply") of Final Analysis Communication
               Services, Inc.

               The technical information contained in the Consolidated Reply is
       bJ




               true and correct to the best of my knowledge and belief.




Dated: April 19, 1995
                                                   i
                                                   54              »


                                            ~/s   [ 1

                                          Buxx&fi J. Levin, Ph.D.


Exhibit 2:   November 2, 1994 Letter from Chief, Satellite and
             Radiocommunication Division, FCC to Albert J.
             Catalano