LETTER submitted by DIRECTV Enterprises, LLC

Milestone and Bond Requirements

2016-03-02

This document pretains to SAT-AMD-20130716-00094 for Amended Filing on a Satellite Space Stations filing.

IBFS_SATAMD2013071600094_1128956

                                                                                                       Jennifer D. Hindin
1776 K STREET NW         March 2, 2016                                                                 202.719.4975
WASHINGTON, DC 20006                                                                                   jhindin@wileyrein.com
PHONE     202.719.7000

                         VIA ELECTRONIC FILING
www.wileyrein.com

                         Marlene H. Dortch
                         Office of the Secretary
                         Federal Communications Commission
                         445 12th Street, SW
                         Washington, DC 20554

                                 Re:         Milestone and Bond Requirements for DIRECTV KU-45W, File
                                             Nos. SAT-LOA-20130205-00016 and SAT-AMD-20130716-00094,
                                             Call Sign S2893
                         Dear Ms. Dortch:

                         DIRECTV Enterprises, LLC (“DIRECTV”), by counsel, hereby notifies the Federal
                         Communications Commission (“FCC” or “Commission”) that DIRECTV intends to
                         replace its current milestone schedule and bond obligation with a single, final
                         milestone and escalating bond requirement for the DIRECTV KU-45W license (call
                         sign S2893) consistent with recently adopted, but not yet effective, changes to
                         Sections 25.164 and 25.165 of the FCC’s rules. 1 To the extent necessary,
                         DIRECTV seeks waiver of the requirement to comply with existing, interim
                         milestone requirements.

                         On March 4, 2015, DIRECTV received FCC authorization to construct, launch, and
                         operate DIRECTV KU-45W, a geostationary orbit Ku-band satellite. 2 Pursuant to
                         the terms of this authorization, DIRECTV is to submit a copy of its construction
                         contract demonstrating compliance with the first interim milestone on or before
                         March 4, 2016. 3 By its Second Report and Order, 4 the Commission eliminated all
                         interim milestones and adopted an escalating bond structure for geo-stationary
                         satellite system authorizations. 5 DIRECTV’s current milestones will become
                         obsolete as soon as the new Part 25 rules take effect and DIRECTV files the notice



                         1
                                 47 C.F.R. §§ 25.164, 25.165.
                         2
                                 Application for Authorization to Launch and Operate DIRECTV KU-45W, Order and
                         Authorization, 30 FCC Rcd. 1790, Call Sign S2893, IBFS File Nos. SAT-LOA-20130205-00016 and
                         SAT-AMD-20130716-00094 (2015) (“DIRECTV KU-45W Authorization”).
                         3
                                 DIRECTV KU-45W Authorization, ¶ 23.
                         4
                                 Comprehensive Review of Licensing and Operating Rules for Satellite Services, Second
                         Report and Order, FCC 15-167 (Dec. 17, 2015) (“Part 25 Second Report and Order”).
                         5
                                 Id. ¶ 59.


Ms. Dortch
March 2, 2016
Page 2


contemplated by the FCC’s Second Report and Order to assume the new single,
final milestone obligation and related escalating bond. 6

Because DIRECTV will comply with the recently adopted, but not yet effective,
new rules, it does not plan to file a construction contract on March 4, 2016. To the
extent necessary, DIRECTV seeks waiver of this interim milestone requirement set
forth in Section 25.164 and recently eliminated by the Commission. As explained
by the FCC in a recent grant waiving another recently eliminated rule, “[t]he same
public interest rationales for elimination of the rule justify a waiver of the rule in
this instance.” 7

Please contact the undersigned with any questions.

Respectfully submitted,

/s/ Jennifer D. Hindin

Jennifer D. Hindin
Counsel for DIRECTV Enterprises, LLC




6
         The FCC contemplated that existing licensees with outstanding interim milestone
requirements may wish to proceed under the new bond and milestone rules and instructed such
licensees to submit a letter and new or modified bond to the agency. Part 25 Second Report and
Order, ¶ 86.
7
         Intelsat License LLC, Application for Authority to Launch and Operate Intelsat 33e, a
Replacement Satellite With New Frequencies, File No. SAT-LOA-20150327-00016 at ¶ 6 (Feb. 25,
2016). In the Second Report and Order, the FCC found that “eliminating the interim milestone
requirements will significantly reduce administrative burdens on both licensees and the Commission
associated with verifiably demonstrating, and evaluating, compliance with the milestones, saving
considerable time and cost. . . Further, it will remove any need for submission of confidential
contract or design materials to the Commission to prove that the milestones have been completed.”
Part 25 Second Report and Order, ¶ 59.