ZVAMS000026

FCC ID

Equipment: Bluetooth Module

TCL Technoly Electronics (Huizhou) Co., Ltd. MS000026

Section 37, Zhongkai High-tech development Zone, Huizhou, N/A 516006 China

Application
Frequency Range
Final Action Date
Granted
ioQtmQ87bcvSZ6BL3gOSPw==
2402.0-2480.0
2019-05-13
APPROVED
File NameDocument TypeDateDirect
RF Exposure reportRF Exposure Info 2019-05-13 00:00:00 pdf
Internal photosInternal Photos 2019-05-13 00:00:00 pdf
Label and locationID Label/Location Info 2019-05-13 00:00:00 pdf
External photosExternal Photos 2019-05-13 00:00:00 pdf
Modular approval letterCover Letter(s) 2019-05-13 00:00:00 pdf
STC LetterCover Letter(s) 2019-05-13 00:00:00 pdf
RF Test set-up photoTest Setup Photos 2019-05-13 00:00:00 pdf
LTC LetterCover Letter(s) 2019-05-13 00:00:00 pdf
RF Test ReportTest Report 2019-05-13 00:00:00 pdf
Authorization LetterCover Letter(s) 2019-05-13 00:00:00 pdf
SchematicsSchematics 2019-05-13 00:00:00 N/A
User ManualUsers Manual 2019-11-10 00:00:00 N/A
Block DiagramBlock Diagram 2019-05-13 00:00:00 N/A
operational DescriptionOperational Description 2019-05-13 00:00:00 N/A

Application Details:

EquipmentBluetooth Module
FRN0020517298
Grantee CodeZVA
Product CodeMS000026
Applicant BusinessTCL Technoly Electronics (Huizhou) Co., Ltd.
Business AddressSection 37, Zhongkai High-tech development Zone , Huizhou,N/A China 516006
TCB ScopeA4: UNII devices & low power transmitters using spread spectrum techniques
TCB Email[email protected]
ApplicantWeirun Peng – Approbation Engineer
Applicant Phone
Applicant Fax86-752-2625162
Applicant Email[email protected]
Applicant MailStop
Test FirmBureau Veritas Shenzhen Co., Ltd. Dongguan Branch
Test Firm ContactAlec Hu
Test Firm Phone
Test Firm Fax
Test Firm Email[email protected]
Certified ByWeirun Peng –
Comment [ioQtmQ87bcvSZ6BL3gOSPw==]: RF output power is conducted. Limited Modular approval. Co-location of this module with other transmitters that operate simultaneously are required to be evaluated using the FCC multi-transmitter procedures. The host integrator must follow the integration instructions provided by the module manufacturer and ensure that the composite-system end product complies with the FCC requirements by a technical assessment or evaluation to the FCC rules and to KDB Publication 996369. The module antenna(s) must be installed to meet the RF exposure compliance separation distance of 20cm and any additional testing and authorization process as required. The module grantee is responsible for providing the documentation to the system integrator on restrictions of use, for continuing compliance of the module. The host integrator installing this module into their product must ensure that the final composite product complies with the FCC requirements by a technical assessment or evaluation to the FCC rules, including the transmitter operation and should refer to guidance in KDB 996369.

© 2019 FCC.report
This site is not affiliated with or endorsed by the FCC