                             5 Installing the casings
  1                                                                                           4

                                                                        3




                                        2
                                                                                          Side fixing plates for
                                                                                          Earthquake Zone 4


   Note:
                                                                            1. Align the holes of the first casing
   The casings are pre-installed      In pole and wall installations,
                                                                               bottom with the fixing studs
    with back covers.                  the maximum modules per
                                                                               on the plinth
   In Earthquake Zone 4, the          plinth is two.
                                                                            2. Push the casing back until it stops.
   maximum number of modules          In pole and wall installations,
                                                                            3. Attach the casing to the plinth with
   for stack installations is five.    maintenance straps must be
                                                                               M5 X 8 mm screws (6150279).
   In Earthquake Zone 4, install       installed in the casings.
                                                                               Tighten to 3.5-4.2 Nm
   side fixing plates on the casings. M5  X 8 screws should be                 (2.58-3.10 ft-Ib)
   In Earthquake Zone 2, the          secured with thread locking           4. Install the remaining casings as
   maximum allowed height for         compound in pole and wall                required by the configuration
   a stack is 22U.                    installations


Check list
      Back covers are properly installed.
      Fixing screws are tightened.
      Optional: In pole and wall installations, maintenance straps are installed in the front covers.
                             9
                                      Installing the modules
Module installation principle
                                                3                           4
        1


  2



 1. Slide the RF module and the System Module into the casings.
 2. Attach the module(s) to the casing with M5 X 25 mm screws. Tighten to 3.5-4.2 Nm (2.58-3.10 ft-Ib).
 3. Install the transmission sub-module to the System Module. Tighten to 2.7-3.3 Nm (1.99-2.43 ft-Ib).
 4. Install the cable entries on both casings with M5 X 10 mm screws (6150240). Torque 3.5 to 4.2 Nm.
 Note: In pole and wall installations, install the maintenance strap for back covers.

Check list
   Module back covers and cable entries are installed.
   Screws are tightened to the specified torque value.
Note: In pole and wall installations, screws are secured with thread locking compound.


   Installation examples


                                                         Antenna                           Antenna




                                                                                    Pole




                                                  Wall
                                                                                           Ground
                                                         Ground


                    Stack                  Wall                              Pole




                             7 Grounding the modules
 Grounding principle
      Cable Entry                                 1. Connect the grounding cable to the module
                                                     front panel.
                                                  2. Route the grounding cable through the cable entry.
                                                  3. Connect the other end of the cable to the plinth.
                                                  4. Repeat steps 1-3 with all the modules.
                                                     Tighten to 3.5-4.2 Nm (2.58-3.10 ft-Ib).




Check list
   Modules are grounded.
   Grounding connections are tightened to the correct torque values.


                                      8 Cabling
Cable routing and cable ties

                        Cable entry                 Cable clamp       Caution: Incorrect cables
                                                                      and seals may not provide
                                                                      secured environmental
                                                                      protection.Use only tested
                                                                      IP65 class cables with seals
                                                                      provided by Nokia Siemens
                                                                      Networks.
                                                                      1. Route the cables through
                                                                         cable entries.
                                                                      2. Fix to cable tie points with
                                                                         cable ties.


                               Cabling (continued)
External power cables
Connecting external power feed to system module

                                                      1. Install the cable clamp on the side of the
                                                         casing.

            1                                         2. Remove the black rubber boots, nuts,
                                      2
                                                        washers and cable lugs from the terminals.

                                                      3. Strip about 2 cm (.8 in) of insulation from
                                                         the (+) and (-) DC cables.

                                                      4. Insert the stripped end of each cable into
      3 Strip off about 2 cm                  4
                                                         a cable lug and crimp.
                           2
                          cm                          5. Pull each cable through a rubber boot.
         Cable
          ends                                        6a.Connect the (-) crimped wire to the
                                                         (-) connector pole, insert washer, and
                                                         tighten the nut. Connect the (+) crimped
                                 6a                      wire to the (+) connector pole, insert
                                                         washer, and tighten the nut.

                                                      6b.Torque the M10 nuts (max 14 Nm).
  5
                                                      7. Pull the black rubber boots over the lugs.

      6b                         7                    8. Route the cable through the external
                                          8
                                                  9      cable entry.

                                                      9. Route the power cables through the
                                                        cable clamp, attach and tighten the cable
                                                        clamp screws with a T10 TORX
                                                        screwdriver.

Internal power cables
                                                      1. Remove the connector seal on the
                                                         module to uncover the connector.

                                                      2. Connect the cable to the System
                                                        Module.

                                                      3. Push the connector seal firmly
                                                         in place.

                                                      4. Connect the other end of the internal
                                                         power cable to the RF Module.
                                                         Push the cable connector seal
                                                         firmly in place.


Antenna cabling                                          1. Remove seals from the antenna
                                                            connectors. Store the connector
             1                   2                          seals for later use.

                                                         2. Connect the cable to the antenna
                                                            connectors.

                                                         3. Route the antenna cables through
                                                            the cable entry.
                                         3
                                                         4. Tighten the connector with a torque
                                                            wrench set to 25 Nm.

                                                         5. Repeat the previous steps for all
                                                            antenna cables required for your
                                                            configuration.


                                                         1. Remove the connector seal(s)
                                                            from the connector.
Transmission cables
                                                         2. Route the cable through the cable
                                                            entry.

                                                         3. Pull back the connector seal
                                                            covering the cable (Flexbus
                                                            connector excluded).

                                                         4. Connect the cable to the
                                                            appropriate connector.

                                                         5. Push the cable connector seal
   2                   4                     5              firmly in place.

                                                         6. Repeat the previous steps for all
                                3                           cables.

                                                         7. Make sure the that all the
                                                            connector seals are properly
                                                            installed.
 Optical cabling


                                                 4        7
                                                                            8




                 1                   2

   Caution: Overbending optical fiber cables
   damages the cables and can detach or
   damage the connectors. Do not bend        Left side
   optical fiber cables to a radius smaller
   than the minimum radius of 70 mm (3 inches).