tune up procedure

FCC ID: TV7R11E5HAM

Parts List/Tune Up Info

Download: PDF
FCCID_4159697

Tune-up Procedure


Each unit is tested during production for functionality against the pass/fail criteria. The unit is then
given pass/fail status based on the measured parameters. The pass/fail threshold is determined
by engineering during product development. Compliant samples continue through production
and non-compliant units are removed.




Rogers Labs, Inc.               Mikrotikls SIA              S/N: 8EDC0800A953/814/r2
4405 W. 259th Terrace           Model: R11e-5HacD                  FCC ID: TV7R11E5HAM
Louisburg, KS 66053             Test #: 181029                     IC: 7442A-R11E5HAM
Phone/Fax: (913) 837-3214       Test to: 47CFR, 15.407, RSS-247 Date: January 22, 2019
Revision 1                      File: TunPro R11e5HacD               Page 1 of 1



Document Created: 2019-01-22 08:51:53
Document Modified: 2019-01-22 08:51:53

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC