Test Report

FCC ID: SAJSKB13EAP

Test Report

Download: PDF
FCCID_456733

                              FCC PART 18

      MEASUREMENT AND TEST REPORT
                                        FOR

      Toshiba Lighting & Technology Corporatin
    2-13, MINAMISHINAGAWA 2-CHOME. SHINAGAWA-KU.TOKYO 1408660



                             FCC ID: SAJSKB13EAP


                                      2004-06-22


  This Report Concerns:                    Equipment Ty p e :
      Original Report                      Self - ballasted lamp



      Test Engineer:     Jerry Wang/

    Report Number:       R0406153

          Test Date:     2004-06-15



       Reviewed By:     Ling Zhang/


      Prepared By:      Bay Area Compliance Laboratory Corporation
                        230 Commercial Street
                        Sunnyvale, CA 94085
                        Tel: (408) 732-9162
                        Fax: (408) 732-9164



Note: The test report is specially limited to the use of the above client company and the
      product model. It may not be duplicated without prior written consent of Bay Area
      Compliance Laboratory Corporation. This report must not be used by the client to
      claim product certification, approval, or endorsement by NVLAP, NIST or any agency of
      the U.S. Government


Toshiba Lighting & Technology Corporation                                                                                                       FCC ID: SAJSKB13EAP

TABLE OF CONTENTS
1 - GENERAL INFORMATION................................................................................................................................................. 3
   1.1 P RODUCT DESCRIPTION FOR EQUIPMENT UNDER TEST (EUT) ........................................................................................3
   1.2 OBJECTIVE ................................................................................................................................................................................3
   1.3 RELATED SUBMITTAL(S)/GRANT (S) .....................................................................................................................................3
   1.4 TEST METHODOLOGY..............................................................................................................................................................3
   1.5 TEST FACILITY .........................................................................................................................................................................3
2 - SYSTEM TEST CONFIGURATION.................................................................................................................................. 4
   2.1 JUSTIFICATION..........................................................................................................................................................................4
   2.2 EUT EXERCISE PROGRAM......................................................................................................................................................4
   2.3 S CHEMATICS/BLOCK DIAGRAM.............................................................................................................................................4
   2.4 EQUIPMENT M ODIFICATIONS.................................................................................................................................................4
   2.5 LOCAL SUPPORT EQUIPMENT.................................................................................................................................................4
   2.6 INTERFACE PORTS AND CABLING..........................................................................................................................................4
   2.7 CONFIGURATION OF TEST SYSTEM .......................................................................................................................................5
   2.8 TEST SETUP BLOCK DIAGRAM...............................................................................................................................................5
3 - CONDUCTED EMISSIO NS TEST DATA........................................................................................................................ 6
   3.1 M EASUREMENT UNCERTAINTY .............................................................................................................................................6
   3.2 EUT SETUP ...............................................................................................................................................................................6
   3.3 EMI RECEIVER SETUP ............................................................................................................................................................6
   3.4 EQUIPMENT LIST AND DETAILS.............................................................................................................................................6
   3.5 TEST PROCEDURE ....................................................................................................................................................................6
   3.6 SUMMARY OF TEST RESULTS.................................................................................................................................................7
   3.7 CONDUCTED EMISSIONS TEST DATA....................................................................................................................................7




Report #R0406153                                                               Page 2 of 9                                                  FCC Part 18 ID Test Report


Toshiba Lighting & Technology Corporation                                       FCC ID: SAJSKB13EAP


1 - GENERAL INFORMATION
1.1 Product Description for Equipment Under Test (EUT)
The Toshiba Lighting & Technology Corporation’s product, Model: SKB 13EAP or the "EUT" as referred
to in this report is a Self-ballasted lamp, which measures 4”L x 2.5”W x 2.5”H.

*The test data gathered are from production sample, serial number:TL06153, provided by the
manufacturer.

1.2 Objective
This Following test report is prepared on behalf of Toshiba Lighting & Technology Corporation in
accordance with Part 2, Subpart J, and Part 18, Subparts A and B of the Federal Communication
Commissions rules.

The objective is to determine compliance with FCC Part 18 limit requirements for Industrial, Scientific,
and Medical Equipment.


1.3 Related Submittal(s)/Grant(s)
No Related Submittals.

1.4 Test Methodology
All measurements contained in this report were conducted in accordance with MP-5, FCC Methods of
Measurements of Radio Noise Emissions from Industrial, Scientific, and Medical Equipment. All radiated
and conducted emission measurements were performed at Bay Area Compliance Laboratory Corp.
(BACL).

1.5 Test Facility

The Open Area Test site used by BACL to collect radiated and conducted emission measurement data is
located in the back parking lot of the building at 230 Commercial Street, Sunnyvale, California, USA.

Test site at BACL has been fully described in reports submitted to the Federal Communication
Commission (FCC) and Voluntary Control Council for Interference (VCCI). The details of these reports
has been found to be in compliance with the requirements of Section 2.948 of the FCC Rules and Article 8
of the VCCI regulations. The facility also complies with the test methods and procedures set forth ANSI
C63.4-2001.

The Federal Communications Commission and Voluntary Control Council for Interference has the reports
on file and is listed under FCC file 31040/SIT 1300F2 and VCCI Registration No.: C-1298 and R-1234.
The test site has been approved by the FCC and VCCI for public use and is listed in the FCC Public
Access Link (PAL) database.

Additionally, BACL is a National Institute of Standards and Technology (NIST) accredited laboratory,
under the National Voluntary Laboratory Accredited Program (Lab Code 200167-0).



Report #R0406153                            Page 3 of 9                       FCC Part 18 ID Test Report


Toshiba Lighting & Technology Corporation                                        FCC ID: SAJSKB13EAP


2 - SYSTEM TEST CONFIGURATION
2.1 Justification
The EUT is configured for testing according to MP-5.

2.2 EUT Exercise Program
The sequence used is as follows:
The EUT was switched on after being connected to the mains power supply.

2.3 Schematics/Block Diagram
The EUT’s block diagram is presented in Appendix D.

2.4 Equipment Modifications
The EUT samples provided were reported by the manufacturer to be unmodified production samples.

2.5 Local Support Equipment

        Manufacturer            Description               Model       Serial Number            FCC ID
         QUEEN PUO            Power Cord Cable            E89949          E183417                  None



2.6 Interface Ports and Cabling

            Cable Description               Length (M)             From/Port                  To
        None-Shielded Power Cord Cable            1.6              AC Output          WALL Light /EUT




Report #R0406153                            Page 4 of 9                        FCC Part 18 ID Test Report


 Toshiba Lighting & Technology Corporation                                          FCC ID: SAJSKB13EAP

 2.7 Configuration of Test System




 2.8 Test Setup Block Diagram

                                                                          LISN1
Power cables were draped along the test table and
                                                                            1
bundled up to 0.8m

               LISN2




                                                    EUT
    1.0Meter




                 Non-Conducting Table
                80cm above Ground Plane




                                                    1.5 Meter




 Report #R0406153                                           Page 5 of 9           FCC Part 18 ID Test Report


Toshiba Lighting & Technology Corporation                                        FCC ID: SAJSKB13EAP

3 - CONDUCTED EMISSIONS TEST DATA
3.1 Measurement Uncertainty
All measurements involve certain levels of uncertainties. The factors contributing to uncertainties are
spectrum analyzer, amplifier, and calibration procedures, LISN etc.
Based on NIS 81, The Treatment of Uncertainty in EMI Measurements, the best estimate of the uncertainty
of any conducted emissions measurement at BACL is +2.4 dB.

3.2 EUT Setup
The measurement is performed in the shield room, using the same setup per FCC MP -5 measurement
procedure. The specification used was the FCC Part Subpart C 18 limits.
The EUT was placed on the center of the back edge on the test table.
The power cord extension of the EUT was connected with 120 VAC/60 Hz power source.

3.3 EMI Receiver Setup
The spectrum analyzer was set to investigate the spectrum from 450 kHz to 30MHz.

3.4 Equipment List and Details

                                                                             Serial
     Manufacturer                Description               Model                               Cal Date
                                                                            Number
     Rohde & Schwarz        Artificial-Mains Network       ESH2-Z5         871884/039          2004-03-28
     Rohde & Schwarz           EMI Test Receiver           ESCS30            100176            2004-05-06
           Fluke              Calibrated Voltmeter            189            18485-38          2003-07-18


3.5 Test Procedure
During the conducted emissions test, the power cord of the power cord extension was connected to the
mains outlet of the LISN-1.
The six highest emissions were maximized to ensure the EUT is in compliance in all possible installation
configurations.
All data was recorded in the peak detection mode. Quasi-peak readings were only performed when an
emission was found to be marginal (within -4 dB of the specification limits). Quasi-peak readings are
distinguished with a "Qp".
The EUT was tested under the normal modes during the final qualification test to represent the worst case
results.




Report #R0406153                            Page 6 of 9                        FCC Part 18 ID Test Report


Toshiba Lighting & Technology Corporation                                       FCC ID: SAJSKB13EAP

3.6 Summary of Test Results
According to the data in section 3.7, the EUT, was found to be in compliance with the FCC 18 Conducted
margin for industry, scientific and medical devices, and with the worst margin reading of:

    -20.9 dB at 0.54 MHz at the Neutral mode, 0.45-30MHz
     Environmental Conditions

      Temperature:           30°C
      Relative Humidity:     64%
      ATM Pressure:          1019mbar



3.7 Conducted Emissions Test Data
        3.7.1 Conducted Test, 0.45-30MHz.

                 LINE CONDUCTED EMISSIONS                                     FCC PART 18
      Frequency Amplitude    Detector        Phase                           Limit   Margin
        MHz       dBµV     Qp/Ave/Peak    Line/Neutral                       dBµV      dB
          0.54             35.1             Peak            Neutral            48           -20.9
          0.46             31.6             Peak             Line              48           -25.1
          0.72             30.8             Peak            Neutral            48           -25.2
          0.79             30.1             Peak            Neutral            48           -25.9
          0.60             29.5             Peak             Line              48           -26.5
          0.84             28.8             Peak             Line              48           -27.2


       3.7.2 Plot of Conducted Emissions Test Data

The plot(s) of conducted emission test is presented in the following page as reference.




Report #R0406153                              Page 7 of 9                     FCC Part 18 ID Test Report


Bay Anea Compliance Laboratory Corp                 18. wun o« cce
FCC 18

               Ses
               +
          *mnge.  0 ravcen)
              Mewintioa‘———i        —— necsiver sectings
  atare           We          w    x ceaitoe wefine Hivce mee
asoe               in         #         m      aven iseil o
  w               m          w8         m       m demeon aey
  &              ann        adte        m       m iMMk &2




                    ‘\MMM'WJ v.m}\vw\y
                                       |
                                       |
                                       |_


Toshiba Lighting & Technology Corporation                   FCC ID: SAJSKB13EAP




Report #R0406153                            Page 9 of 9   FCC Part 18 ID Test Report



Document Created: 2019-09-14 22:53:05
Document Modified: 2019-09-14 22:53:05

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC