Installation Guide

FCC ID: O2J-235AS

Users Manual

Download: PDF
FCCID_1551062

 SYN-UG-007 Rev 1


   AirSynergy
    Equipment
Installation Guide


                              AirSynergy Equipment Installation Guide



Copyright
© Copyright by Airspan Networks Inc., 2011. All rights reserved worldwide.

The information contained within this document is proprietary and is subject to all relevant copyright,
patent and other laws protecting intellectual property, as well as any specific agreements protecting
Airspan Networks Inc. rights in the aforesaid information. Neither this document nor the information
contained herein may be published, reproduced or disclosed to third parties, in whole or in part,
without the express, prior, written permission of Airspan Networks Inc. In addition, any use of this
document or the information contained herein for the purposes other than those for which it is
disclosed is strictly forbidden.

Airspan Networks Inc. reserves the right, without prior notice or liability, to make changes in
equipment design or specifications.

Information supplied by Airspan Networks Inc. is believed to be accurate and reliable. However, no
responsibility is assumed by Airspan Networks Inc. for the use thereof nor for the rights of third parties
which may be effected in any way by the use of thereof.

Any representation(s) in this document concerning performance of Airspan Networks Inc. product(s)
are for informational purposes only and are not warranties of future performance, either expressed or
implied. Airspan Networks Inc. standard limited warranty, stated in its sales contract or order
confirmation form, is the only warranty offered by Airspan Networks Inc. in relation thereto.

This document may contain flaws, omissions or typesetting errors; no warranty is granted nor liability
assumed in relation thereto unless specifically undertaken in Airspan Networks Inc. sales contract or
order confirmation. Information contained herein is periodically updated and changes will be
incorporated into subsequent editions. If you have encountered an error, please notify Airspan
Networks Inc. All specifications are subject to change without prior notice.

Product performance figures quoted within this document are indicative and for information purposes
only.

UK WEE Registration number: WEE/AB0207WZ




Page 2                             Commercial in Confidence                           SYN-UG-007 Rev 1


                                            AirSynergy Equipment Installation Guide



Table of Contents
Copyright ................................................................................................................................................. 2

Table of Contents .................................................................................................................................... 3

Summary of Figures ................................................................................................................................ 5

Summary of Tables ................................................................................................................................. 6

1      About This Guide ............................................................................................................................ 7

    1.1        Purpose ................................................................................................................................... 7

    1.2        Intended Audience .................................................................................................................. 7

    1.3        Conventions ............................................................................................................................ 7

    1.4        Organisation of this Guide ....................................................................................................... 8

2      Introduction...................................................................................................................................... 9

    2.1        General Overview ................................................................................................................... 9

       2.1.1          Sector Antenna arrangement .......................................................................................... 9

3      Get Started .................................................................................................................................... 10

    3.1        Workflow of Installation ......................................................................................................... 10

    3.2        Installation Checklist ............................................................................................................. 11

4      Verify Prerequisites ....................................................................................................................... 12

    4.1        Verify Site Requirements ...................................................................................................... 12

    4.2        Verify Safety Requirements .................................................................................................. 12

       4.2.1          Warn of Hazardous Voltages ........................................................................................ 12

       4.2.2          Adhere to European Directive 1999/519/EC ................................................................. 12

    4.3        Verify Installation Requirements ........................................................................................... 13

       4.3.1          Verify the Tools ............................................................................................................. 13

       4.3.2          Verify the Parts and Kits ................................................................................................ 13

       4.3.3 .............................................................................................................................................. 14

       4.3.4          Verify Components ........................................................................................................ 15

5      Install the AirSynergy mounting plate .......................................................................................... 16

    5.1        Mount the AirSynergy Universal Mounting Plate .................................................................. 16

6      Fit Front sector antenna to AirSynergy ........................................................................................ 18

Page 3                                             Commercial in Confidence                                                     SYN-UG-007 Rev 1


                                           AirSynergy Equipment Installation Guide


    6.1       Mount Front antenna to the AirSynergy unit ......................................................................... 18

    6.2       Secure AirSynergy and Antenna to pole mount plate ........................................................... 20

    6.3       Install GPS Antenna .............................................................................................................. 23

    6.4       Install GPS antenna for AirSynergy ...................................................................................... 23

      6.4.1           Mount the GPS Antenna ............................................................................................... 23

    6.5       Connect PoE cable to the AirSynergy ................................................................................... 23

7     Connect to Power System ............................................................................................................. 24

    7.1       Connect PSU Output to PoE injector .................................................................................... 24

    7.2       Run cables from the PoE injector to the AirSynergy ............................................................. 24

8     Appendix A .................................................................................................................................... 25

    8.1       Review Job Sheet ................................................................................................................. 25

9     Appendix C – Glossary of Terms .................................................................................................. 27

10         Appendix D – Checklist ............................................................................................................. 28

11         Appendix E ................................................................................................................................ 29

    11.1      Revision History .................................................................................................................... 29




Page 4                                            Commercial in Confidence                                                  SYN-UG-007 Rev 1


                                      AirSynergy Equipment Installation Guide



Summary of Figures
Figure 1 – Typical AirSynergy with sun shield mounted on street pole ................................................. 9

Figure 2 – Workflow of AirSynergy Installation ..................................................................................... 10

Figure 3 – AirSynergy connectorised unit with sunshield ..................................................................... 15

Figure 4 – AirSynergy unit with front sector antenna fitted ................................................................... 15

Figure 5 – AirSynergy mounting plate and fixings ............................................................................... 16

Figure 6 – Feed clamp bands through the quick release locking mechanisms .................................... 16

Figure 7 – AirSynergy mounting plate installed (large diameter concrete pole) ................................... 17

Figure 9 – AirSynergy front mount antenna and front mount plate ....................................................... 18

Figure 10 – Connecting the antenna RF cables .................................................................................. 18

Figure 11 – AirSynergy Front mount antenna connections – applying self amalgamating tape .......... 19

Figure 14 – Lift AirSynergy to top of pole-mount plate ........................................................................ 20

Figure 15 – AirSynergy downtilt adjustment ......................................................................................... 21

Figure 16 – Tighten flange nuts (4 poitions) once the required mounting angle is set ......................... 22

Figure 19 – AirSynergy attach earth cable to pole ............................................................................... 22

Figure 22 – AirSynergy power supply module and connection to the PoE injector .............................. 24




Page 5                                      Commercial in Confidence                                         SYN-UG-007 Rev 1


                                        AirSynergy Equipment Installation Guide



Summary of Tables
Table 1 - AirSynergy installation tools ................................................................................................... 13

Table 2 – AirSynergy installation parts and kits .................................................................................... 13




Page 6                                        Commercial in Confidence                                             SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide



1 About This Guide
This section discusses the purpose, intended audience, conventions, referenced documentation and
organisation for this guide.

1.1 Purpose
This guide provides the workflow and step-by-step procedures for Installation of the AirSynergy
equipment. These procedures include:

        Verify Prerequisites
        Install the AirSynergy Radio equipment
        Install the PSU equipment
        Connect and manage cables


1.2 Intended Audience
This guide is intended for persons who are responsible for installing the AirSynergy equipment.
These persons should have a working knowledge of the equipment.

1.3 Conventions
This document uses the following informational conventions.

         Icon     Description



                  Checkpoint: Marks a point in the workflow where there may be an exit or branch
                  to some other procedure. At each Checkpoint the reason for an exit or branch is
                  given along with specific directions to locate the entry point in the other
                  procedure.


                  Reference: Gives a resource in the workflow that may be needed to complete a
                  procedure along with specific directions to use the resource.


                  Caution: Describes a possible risk and how to lessen or avoid the risk.



                  Advice: Provides a recommendation based on best practice.


                  Note: Provides useful information.




Page 7                           Commercial in Confidence                         SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide



1.4 Organisation of this Guide
This guide is organised into the following Sections:

        About this Guide
        Introduction
        Get Started
        Verify Prerequisites
        Install the AirSynergy Radio equipment
        Install the PSU equipment
        Connect and manage cables
        Appendixes




Page 8                            Commercial in Confidence             SYN-UG-007 Rev 1


                               AirSynergy Equipment Installation Guide



2 Introduction
This section provides a descriptive overview of the product.

2.1 General Overview
AirSynergy equipment comes in a range of frequency variants that can be mounted with different
antenna options




      Figure 1 – Typical AirSynergy with sun shield mounted on street pole
2.1.1 Sector Antenna arrangement
A typical sector installation will have a cross- polar sector antenna fitted directly to the front of the
AirSynergy main unit. (This is fitted instead of the sun-shield).




      Figure 2 – AirSynergy with front sector antenna fitted



Page 9                              Commercial in Confidence                             SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide




3 Get Started
3.1 Workflow of Installation
The workflow required to install the AirSynergy equipment is shown in the following diagram:




      Figure 2 – Workflow of AirSynergy Installation




Page 10                          Commercial in Confidence                         SYN-UG-007 Rev 1


                              AirSynergy Equipment Installation Guide



3.2    Installation Checklist
Plan the installation of the AirSynergy Unit by using the Installation Checklist in Appendix A.




Page 11                           Commercial in Confidence                           SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide



4 Verify Prerequisites
4.1 Verify Site Requirements
To set up the AirSynergy for connection to Netspan, a PC will be required.

4.2 Verify Safety Requirements
Read and follow all warning notices and instructions marked on the product or included in this
manual.

When installed in the final configuration, the product must comply with the applicable Safety
Standards and regulatory requirements of the country in which it is installed. If necessary, consult with
the appropriate regulatory agencies and inspection authorities to ensure compliance.

Ascertain the radiation hazards when working in an environment close to other antennas and
Electromagnetic fields, e.g. working on towers with other microwave transmitters etc. and act
accordingly.

4.2.1 Warn of Hazardous Voltages
On AC installations, hazardous voltages exist. Use caution when verifying or working with AC power.
Remove metal jewellery that could come into contact with AC power.

On DC sections, short circuiting the low voltage, low impedance circuits can cause arcing that may
result in burns or eye damage. Remove rings, watches etc. to avoid shorting DC circuits.

                  Note: Airspan products do not contain hazardous substances (as defined in UK
                  Control of Substances Hazardous to Health Regulations 1989 and the Dangerous
                  Substances Regulations 1990). At the end of any Airspan products life cycle, the
                  customer should consult with Airspan to ensure that the product is disposed of in
                  conformance with the relevant regulatory requirements.



                  Caution: Any modifications to this device not expressly authorised by the
                  manufacturer could void the users’ authority to operate this device.


4.2.2 Adhere to European Directive 1999/519/EC


European Directive 1999/519/EC details basic restrictions and reference levels on human exposure to
electromagnetic fields as advised by the ICNIRP. The directive states that adherence to these
recommended restrictions and reference levels should provide a high level of protection as regards
the established health effects that may result from exposure to such fields.




Page 12                           Commercial in Confidence                           SYN-UG-007 Rev 1


                                AirSynergy Equipment Installation Guide



4.3 Verify Installation Requirements
4.3.1 Verify the Tools
     Table 1 - AirSynergy installation tools
          Tools

          Small flat blade Screwdriver

          Large Flat Bladed Screwdriver

          20mm wrench or small Pipe wrench

          10mm wrench

          Wire strippers

          Wire cutters

          Small cross-head screwdriver

          Ring terminals crimp tool

          Tilt-meter (if accurate downtilt needs to be set)

          Krone punch-down tool


4.3.2 Verify the Parts and Kits
     Table 2 – AirSynergy installation parts and kits

 Installation Kit /        Installation Kit details             Note:
 Part:

 AirSynergy                1 x AirSynergy Universal
 mounting                  Mounting Plate

                           1 x Sun Shield


                           1 x Sector Antenna mounting          4 M4 nuts
                           plate with fixing kit                4 M4 flat washers
                                                                4 M4 spring washers

                                                                4 M5 SEMs

                           1 x Sector Antenna (front
                           mounting)




Page 13                              Commercial in Confidence                         SYN-UG-007 Rev 1


                               AirSynergy Equipment Installation Guide


 Connecting              CAT5e                                    External grade 25m with Weather
 cables                                                           hood pre-fitted

                         Earthing cable                           M6 Lug at each end



        Table 3 - AirSynergy additional items
          Additional items (not provided by Airspan)

          Cable ties

          Self amalgamating tape

          Black PVC tape

          Ring terminal for earth strap, M6

          Earth strap cable (4mm), yellow and green cable




        Table 4 – Antenna and feeder kits
          Installation Kit / Part           Note


          Antenna / Feeder (not           Antenna and feeder
          always provided by
          Airspan)
                                          Short feeder tail length of 0.5
                                          to 1.5m x2


        Table 5 - AirSynergy additional items
          Additional items (not provided by Airspan)

          Cable ties

          Self-amalgamating tape

          Black PVC tape

          Ring terminal for earth strap, M6

          Earth strap cable (4mm), yellow and green cable


4.3.3




Page 14                             Commercial in Confidence                           SYN-UG-007 Rev 1


                              AirSynergy Equipment Installation Guide


4.3.4 Verify Components
AirSynergy

        AirSynergy connectorised unit




       Figure 3 – AirSynergy connectorised unit with sunshield




       Figure 4 – AirSynergy unit with front sector antenna fitted



Page 15                            Commercial in Confidence             SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide



5 Install the AirSynergy mounting plate
5.1 Mount the AirSynergy Universal Mounting Plate
The AirSynergy is normally mounted on a pole (in close proximity to its external antenna if not using
the AirSynergy front mounted Antenna. Take care to install the mounting plate the correct way up so
that the AirSynergy unit will fit with the PoE connector pointing downwards.




      Figure 5 – AirSynergy mounting plate and fixings




      Figure 6 – Feed clamp bands through the quick release locking mechanisms




      Figure 7 – Press down the locking mechanism with the slack band fed through



Page 16                           Commercial in Confidence                         SYN-UG-007 Rev 1


                            AirSynergy Equipment Installation Guide




     Figure 8 – Tighten clamps with large flat blade screwdriver




     Figure 7 – AirSynergy mounting plate installed (large diameter concrete pole)




Page 17                          Commercial in Confidence                            SYN-UG-007 Rev 1


                              AirSynergy Equipment Installation Guide



6 Fit Front sector antenna to AirSynergy
The AirSynergy unit can be used either with a sector antenna mounted directly on the front or with a
remotely attached RF antenna.



6.1 Mount Front antenna to the AirSynergy unit
To mount the front antenna , perform the following steps:
Add text here to describe the mounting of the antenna to the front mount plate, securing of the
antenna cables with cable ties and the fitting of the antenna plus front mount plate to the front of the
AirSynergy unit.



      Figure 8 – AirSynergy front mount antenna and front mount plate




      Figure 9 – Connecting the antenna RF cables



                   Caution: Do not over-tighten the RF connector. RF failures can result when the
                   RF connector is over-tightened.


Weather-proofing of the RF N type connectors with weather-proofing tapes. (self amalgamating
followed by a layer of balck PVC tape.




Page 18                            Commercial in Confidence                           SYN-UG-007 Rev 1


                            AirSynergy Equipment Installation Guide


      Figure 10 – AirSynergy Front mount antenna connections – applying self amalgamating tape

Apply a layer of self amalgamating tape and a layer of electrical tape to the weather-exposed RF
connector.




      Figure 12 – AirSynergy antenna connections – applying PVC tape
Ensure the RF connector is completely sealed from the weather.



      Figure 13 – AirSynergy antenna with sealed RF connections



                  Note: It is recommended to place some cardboard or paper under the unit to
                  protect it from scratching.




Page 19                          Commercial in Confidence                         SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide



6.2 Secure AirSynergy and Antenna to pole mount plate
To mount the AirSynergy to the universal mounting plate, perform the following steps:
   1. Hook the studs into the top slots of the mounting plate. With the studs engaged in the top
      slots raise the unit slightly until the bottom studs also drop into their respective slots. Secure
      the flange nuts (4 positions).




     Figure 11 – Lift AirSynergy to top of pole-mount plate




     Figure 5 – AirSynergy drops down into slots at the top of pole-mount plate




Page 20                           Commercial in Confidence                           SYN-UG-007 Rev 1


                            AirSynergy Equipment Installation Guide




     Figure 16 – Gently lift the AirSynergy body until the bottom studs engage in the bottom slots




     Figure 17 – AirSynergy body engaged in the bottom slots

   2. The slot arrangement at the top allow the AirSynergy and front mounted antenna to be down-
      tilted by a few degrees to provide real downtilt or to compensate for the taper angle on the
      pole. With the flange nuts gently hand tightened the position can be accurately set with tilt-
      meter on the front face of the AirSynergy unit.




     Figure 12 – AirSynergy downtilt adjustment



Page 21                          Commercial in Confidence                          SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide


   3. The downtilt angles are not marked by the adjustment slots so a tiltmeter is required to set a
      specific angle and then tighten the flange nuts ith a 10mm wrench on each stud (4 positions)




     Figure 13 – Tighten flange nuts (4 poitions) once the required mounting angle is set


   4. There is an option to connect an earthing cable to the M6 screw fixing point at the bottom of
      the main body casting. This should be connected to a protection ground bar or directly to the
      steel structure of the power or pole. This is only required in areas of high lightning activity or
      when the AirSynergy unit is mounted on high exposed roofs or tower structures



   5. Connect the earth cable to the protection earth bar using suitable crimp lugs. Alternatively
      use a TK series clamp to join the earth cable to the steel structure of the mounting pole or
      tower structure.




     Figure 14 – AirSynergy attach earth cable to pole




Page 22                           Commercial in Confidence                           SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide


.

6.3 Install GPS Antenna
6.4 Install GPS antenna for AirSynergy
                  Note: AirSynergy units without a factory fitted Switching antenna all require a
                  GPS antenna which comes in a kit with a mounting bracket and a 25cm cable. A
                  prime consideration for a GPS antenna is a clear view of the sky, preferably 360
                  degrees


Install the GPS antenna bracket to the AirSynergy unit using the M6 threaded hole near the top of the
main using the fixing. The GPS Antenna is secured to the GPS mounting bracket with large nuts
supplied. The short RJ58 RF cable (TNC to TNC connections 25cm long) is fitted to the bottom of the
GPS antenna and across to the TNC connection point on the top connection plate of the main unit

6.4.1 Mount the GPS Antenna
The GPS antenna bracket can be optionally mounted on a Pole up to 40mm (1.5"). The Antenna
screws on to the 25m threaded tube.

To mount the GPS antenna, perform the following steps:
    1. The RJ58 antenna cable is provided with a TNC connector attached at each end. Run the
       cable from the AirSynergy GPS receiver connection point to the location of the GPS antenna.
    2. Thread the TNC connector cable through the threaded tube on the bracket and attach the
       TNC connector to the Antenna.
    3. Connect the tube to the antenna by holding the antenna firm and rotating the bracket around
       the cable until the thread is fully engaged in the threaded part of the antenna.
    4. Connect the bracket to the pole using the two U bolts and tightening with a 10mm spanner.


6.5 Connect PoE cable to the AirSynergy
Pull back the hinged protective dust cover and insert the PoE connector so that the RJ45 connector
engages and the Amphenol hood locks into place with the hinged dust cover.

    1. Cable and connect:
            o   PoE (Power over Ethernet)
            o   Protection Ground (An optional grounding cable should be used to connect the
                AirSynergy metal casting to a suitable grounding point on the tower.)




Page 23                          Commercial in Confidence                         SYN-UG-007 Rev 1


                           AirSynergy Equipment Installation Guide



7 Connect to Power System
                Caution: Hazardous voltage! Before working, ensure that the power is removed
                from the power connection cables. When the system is powered on, do not
                touch the power terminals.


7.1 Connect PSU Output to PoE injector
7.2 Run cables from the PoE injector to the AirSynergy
      a) Use this procedure to terminate the -54V DC supply into the PoE injector




     Figure 15 – AirSynergy power supply module and connection to the PoE injector




Page 24                        Commercial in Confidence                         SYN-UG-007 Rev 1


                          AirSynergy Equipment Installation Guide



8 Appendix A
8.1 Review Job Sheet
The Job Sheet should include the following information:

      Pole for installation identified
      Position on pole identified
      Pole access restrictions (highway regulations, other services on pole, power pole)
      Method of reaching pole positions (ladders, Elevated work platform)
      AC main fuseway available for PSU
      Configuration programming details known
      Point of connection for Ethernet (if applicable)
      All equipment items available at the installation site
           o Main AirSynergy unit
           o Mounting bracket and pole clamps
           o PSU
           o PoE injector (with fixing kit)
           o Ethernet cable assembly
           o GPS Antenna
           o GPS antenna installation kit
           o Front sector Antenna (if applicable)
           o Front sector Antenna mounting bracket ad fixing kit (if applicable)
           o External panel antenna (if applicable)
           o RF feeder cable tails (if applicable)
      Required tools
           o Large flat screw driver for pole clamps
           o Small flat screwdriver for PoE power terminations
           o Small cross-head screwdriver for PoE box lid and fixings for PoE injector and
               PSU
           o 20mm wrench or small pipe wrench for RF connections
           o 10mm wrench for main unit mounting flange nuts
           o Side cutters
           o Wire strippers
           o Krone punch down tool
           o Tilt meter to set antenna downtilts
           o Ring terminals crimp tool
      Required ancilliary equipment
           o Lap top PC for initial configuration
           o Ethernet cable for temporary connection of the lap top
      Other install materials
           o Self amalgamating
           o Black PVC tape
           o Cable ties
           o Labels


      Whether the system is required to be locked to a GPS timing reference.

      A BSID is required for each AirSynergy. This should be in a format xxxxxx:xxxxxx where x
       is a decimal digit.

Page 25                        Commercial in Confidence                      SYN-UG-007 Rev 1


                           AirSynergy Equipment Installation Guide


      Network configuration information for the SDR blade. This shall include the following
       information for the front panel and the backplane.

          o   IP Address: Should only be set if Management IP Mode is set to Static IP Address.
              See below for Management IP Mode parameter.
          o   Netmask: Should only be set if Management IP Mode is set to Static IP Address.
              See below for Management IP Mode parameter.
          o   Default Gateway: Should only be set if Management IP Mode is set to Static IP
              Address. See below for Management IP Mode parameter.
          o   Management VLAN: Specified as either Untagged or Tagged
          o   Management VLAN Tag: Should only be set if Management VLAN is set to Tagged
          o   Management IP Mode: Specified as Static IP Address or Obtain IP Address via
              DHCP
          o   Ethernet Mode: Specified as Auto-negotiate or Fixed
          o   Ethernet Rate: Need only be configured if Ethernet Mode is set to Fixed, specified
              as 10M or 100M.
          o   Ethernet Duplex: Need only be configured if Ethernet Mode is set to Fixed,
              specified as Full or Half.
      SNMP configuration information. This will allow events from the BS to arrive at the
       specified Netspan server. This will include the following information:

          o   Read Only Community: This should be specified to the same value as in Netspan
              Discovery Parameters (found under Server on Netspan’s left hand panel).
          o   Read Write Community: This should be specified to the same value as in Netspan
              Discovery Parameters (found under "Server" on Netspan’s left hand panel).
          o   Community: Normally specified to the same value as for Read Only Community.




Page 26                        Commercial in Confidence                        SYN-UG-007 Rev 1


                 AirSynergy Equipment Installation Guide




9 Appendix C – Glossary of Terms
AAA             Authentication, Authorization and Accounting
ARQ             Application Function
ASN             Automatic Repeat reQuest
ASN GW          Access Service Network
                ASN Gateway
BS              Base Station
BWA             Broadband Wireless Access
CPE             Customer Premises Equipment
FDD             Frequency Division Duplex
GUI             Graphical User Interface
HO              Handover/Handoff
IP              Internet Protocol
MAC             Media Access Control
MIMO            Multiple Input Multiple Output


MS              Mobile Station
NLOS            Non Line of Sight
NSP             Network Service Provider
OFDMA           Orthogonal Frequency Division Multiplexing (Multiple Access)
PHY             PHYsical Layer
SDR             Software Defined Radio
TDD             Time Division Duplex
VoIP            Voice over IP




Page 27              Commercial in Confidence                        SYN-UG-007 Rev 1


                             AirSynergy Equipment Installation Guide




10 Appendix D – Checklist
The Checklist below gives the high-level steps in the Workflow for this procedure. Detach or print this
page to use as a job-aid for completing the actions this procedure requires.

      Table 3 - Checklist for Procedure
        Procedure                         Actions                      Outcome

        1. Verify Prerequisites           Verify site requirements     All requirements are in
                                                                       place for a successful
                                          Verify safety                installation
                                          requirements

                                          Verify installation
                                          requirements

        2. Install AirSynergy             Install the universal
        universal mounting plate          mounting plate

                                          Verify connection torque
                                          settings

        3. Install AirSynergy on
        the mounting plate

        4. Connect and manage             Connect AirSynergy PoE
        cables                            cable

                                          Connect GPS

        5. Connect power system           Connect PSU to PoE
                                          injector

                                          Connect Power

                                          Connect Ethernet
                                          backhaul




Page 28                            Commercial in Confidence                         SYN-UG-007 Rev 1


                              AirSynergy Equipment Installation Guide




11 Appendix E
11.1 Revision History
Revision                   Originator                 Date                       Description

1                          J. Forrester               07-2011

Customer Service Help-Desk for customer service emergency

Airspan Networks have introduced the Airspan Tracker application to enable prompt and efficient
Customer Support services.

If you do not have an Airspan Tracker account, please obtain login credentials by filling-in the form in
the main page at www.airspan.com/Support Register New Account.

Worldwide Headquarters:
Airspan Networks Inc.
777, Yamato Road, Suite 310,
Boca Raton, FL 33431, USA
Tel: +1 561 893 8670

www.airspan.com

Feedback:
To provide feedback on this document, please send comments to the following email address:
jforrest@airspan.com




Page 29                           Commercial in Confidence                           SYN-UG-007 Rev 1



Document Created: 2011-07-25 10:56:51
Document Modified: 2011-07-25 10:56:51

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC