users manual 2

FCC ID: EWQ100GDLCN

Users Manual

Download: PDF
FCCID_1368021

CHAPTER 4

Itron/Sprague Meter Installation

This chapter provides the instructions to install the 100G Datalogging gas endpoint on an Itron/Sprague
Meter.




             Note Itron/Sprague meters are also known as Actaris and Schlumberger meters. For these
             instructions, all meters are referred to as Itron/Sprague meters.

To remove the index from the meter
1. Remove the index cover screws and the index cover from the Itron/Sprague meter. Examine the mounting
   screws. If they are 5/8" long and not corroded, keep them to re-attach the 100G Datalogging gas endpoint
   assembly. If the screws are not the correct length or if the screws are corroded, discard.




             Note Use the removed index cover as a temporary storage container for screws. Properly
             dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials.
             Do not leave materials on customer premises.




TDC-0823-005    100G Datalogging Installation Guide - Direct Mount                                        28
                                            Proprietary and Confidential


Itron/Sprague Meter Installation




2. Loosen the index mounting screws 1/2 to one turn. Slide the index to the left and off the mounting screws
   and remove from the meter.




    Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index is mounted in
    the endpoint later in this procedure. Verify the index mounting screws are 1/4" long and not corroded. If
    the screws are the correct length and not corroded, retain for later use. If the original screws are discarded,
    use the correct replacement screws (see Installation Prerequisites on page 7).
3. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free
   of gasket residue or dirt before you install the 100G Datalogging gas endpoint.




To assemble the 100G Datalogging gas endpoint and index
1. Separate the 100G Datalogging gas endpoint housing from the cover by pulling the cover straight out from
   the housing. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or snow. You
   will use the cover later in this installation procedure.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                        29
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




2. Screw the 10 - 24 x 1/4" screws into the index mounting posts two turns. Do not tighten the screws.




3. Align the index wriggler (1) with the endpoint drive post (2). Carefully slide the index onto the mounting
   screws. Verify the 100G Datalogging gas endpoint's housing drive post makes positive engagement with
   the index wriggler. Hold the index in place and tighten the index mounting screws. Install and tighten the
   mounting screws evenly.




              Caution Indexes have varying drive mechanism styles. Failure to align the endpoint wriggler
              with the index drive post can cause binding and lead to poor registration or meter failure. To
              verify proper engagement of the index to the endpoint housing, spin the wriggler one
              clockwise rotation, then one-counterclockwise rotation. Do not spin more than one complete
              rotation. The wriggler should spin freely, with little or no resistance.

4. Slide the endpoint cover over the index and housing. The endpoint label should be clearly visible and
   easily read.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                      30
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




Programming the 100G Datalogging Gas Endpoint Assembly
Program 100G Datalogging gas endpoints using:

    An FC200SR handheld computer with Endpoint-Link® or Endpoint-Link Pro version 5.3 or higher or
    An FC300 with SRead handheld computer with Endpoint-Link or Endpoint-Link Pro version 5.5 or higher
    or
    A 900MHz Belt Clip Radio with Endpoint-Link version 5.5 or higher and a customer-supplied laptop. The
    Belt Clip Radio connects to the user-supplied laptop using a USB cable or Bluetooth.
See the Endpoint-Link v5.3 (or higher) Endpoint Programming Guide (TDC-0744) for more complete
programming information.




    FC200SR               FC300 with SRead           900MHz Belt Clip Radio
              Caution The 100G Datalogging gas endpoint must be programmed before use. Follow the
              steps in this section to properly program the endpoint.

Take note of the index drive rate shown on the drive dial on the index. The endpoint is programmed based on
the drive rate. Itron meter index drive rates are typically 2-cubic feet or 0.05 cubic meters (not shown below).




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                      31
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




To program the 100G Datalogging gas endpoint
1. Program the index drive rate into the 100G Datalogging gas endpoint using the endpoint programming
   device. For all programming and "Check Endpoint" operations, hold the handheld computer as close to
   vertical as possible. For best success, keep the handheld programmer within six feet of the target endpoint.
   Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard
   to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the
   configuration file loaded into the endpoint programming device.
   During programming, the 100G Datalogging gas endpoint is set to the nearest 100 cubic feet; the last two
   digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint
   assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This
   verifies the endpoint is counting properly after assembly.




              Caution Do not turn the drive wriggler faster than one turn per second.

         Read or Check the 100G Datalogging gas endpoint using the endpoint programming device.
        If the read result is higher than the number programmed in Step 1, the 100G Datalogging gas endpoint
        is counting correctly.
        If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging
        gas endpoint.




Attaching the 100G Datalogging Gas Endpoint Assembly to the
Itron/Sprague Meter
After programming the 100G Datalogging gas endpoint, attach it to the Itron/Sprague meter.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                    32
                                              Proprietary and Confidential


Itron/Sprague Meter Installation



To attach the 100G Datalogging gas endpoint to the meter
1. Align the endpoint (1) so one of its four drive slots lines up with the meter's drive dog (2).




2. Carefully place the 100G Datalogging gas endpoint on the meter.
                Warning Failure to correctly align the meter drive post and endpoint drive slot can cause
                binding and lead to poor registration or meter failure. If there is a gap between the endpoint
                gasket and the meter, it may be the drive slot of the endpoint assembly's wriggler is not
                correctly aligned with the meter drive slot. Remove the 100G Datalogging gas endpoint
                assembly and repeat the alignment procedure. You must establish proper engagement of
                the meter drive dog within the endpoint wriggler slot.

3. Install endpoint to meter mounting screws in an alternating fashion. Use the original mounting screws if
   they were the correct size and not corroded. If the original screws were discarded, use the correct
   replacement screws (see Installation Prerequisites on page 7).
        Insert the right index cover mounting screw and tighten the screw enough to hold it in place. Do not
        completely tighten.
        Install the left index cover mounting screw and tighten to a snug fit. Finish by tightening the right
        mounting screw to a snug fit. Tighten each mounting screw evenly.




          Important Meter manufacturers: torque the mounting screws 15 to 20 inch-pounds.



TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                       33
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




4. Place a new tamper seal over the two screws in the tamper seal cups. Press the new tamper seals into place
   using an 11/32-inch nut driver or similar blunt tool.




5. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the
   customer premises.
100G Datalogging gas endpoint installation on the Itron/Sprague Meter is complete.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                  34
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




Attaching the 100G Datalogging Gas Endpoint Assembly to Flat-
faced Sprague Meters
100G Datalogging gas endpoint installation on a flat-faced Sprague meter requires the Itron Adapter Plate Kit
(CFG-0015-001).




Itron Adapter Plate Kit (CFG-0015-001)
1     Adapter Shim Plate
2    Index Cover Mounting Screws
3    Drive Dog
4    Adapter Plate Mounting Screws




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                   35
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




To attach the 100G Datalogging gas endpoint assembly to a flat-faced Sprague meter
1. Verify the kit includes the materials listed in the Itron Adapter Plate Kit table.
                Warning The Adapter Plate must fit flush against the meter face. Some older
                Sprague meters are not compatible with the adapter plate. The following
                examples illustrate the potential obstruction (problem) areas between the
                adapter plate and meter. Failure to mount adapter plate flush on the front of a
                meter could result in a binding condition and lead to poor registration or meter
                failure.




2. Remove the drive dog from the flat-faced Sprague meter. Replace it with the extended drive dog included
   in the kit. Hand-tighten to snug.
              Warning The meter drive dog shaft is surrounded by a gasket. A gas leak
              could result if the gasket is damaged. Do not use a tool to install or tighten the
              new drive dog. Hand-tighten only.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                36
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




3. Attach the Adapter Plate to the meter with the gasket against the meter face. Secure with the two adapter
   plate mounting screws in an alternating fashion.
        Insert the right adapter plate screw and tighten the screw enough to hold it in place.
        Install the left mounting screw and tighten to a snug fit.
        Finish by tightening the right mounting screw to a snug fit.
    Tighten each adapter plate screw evenly.
              Note 100G Datalogging gas endpoints must be assembled and programmed
              following the instructions in Assembling the 100G Datalogging Gas Endpoint
              and Index on page 29 and Programming the 100G Datalogging Gas Endpoint
              Assembly on page 31 prior to installation on the meter.
4. Align the white wriggler (1) so one of its four drive slots lines up with the meter's drive dog (2).




5. Carefully place the 100G Datalogging gas endpoint assembly on the meter.
                Warning Failure to correctly align the meter drive post and endpoint drive slot
                can cause binding and lead to poor registration or meter failure. If there is a gap
                between the endpoint gasket and the meter, remove the 100G Datalogging gas
                endpoint assembly and repeat the alignment procedure. You must engage the
                meter drive dog in the endpoint wriggler slot.

6. Secure the endpoint to the meter by installing mounting screws in an alternating fashion. Use the index
   cover mounting screws shipped with the Sprague 1A Adapter Plate Kit.
        Insert the right index cover mounting screw and tighten the screw enough to hold it in place. Do not
        completely tighten.
        Install the left index cover mounting screw and tighten to a snug fit.
        Finish by tightening the right mounting screw to a snug fit.
Tighten each mounting screw evenly.

          Important Meter manufacturers: torque the mounting screws 15 to 20 inch-pounds.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                      37
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




7. Place a new tamper seal over the two screws with tamper seal cups. Press the new tamper seals into place
   using an 11/32-inch nut driver or similar blunt tool.




8. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the
   customer premises.
100G Datalogging gas endpoint installation on the flat-faced Sprague meter is complete.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                  38
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




Securing Brass Meter Tags to Flat-faced Meters
Some older Sprague meters have metal index covers with brass meter tags attached (by screws or rivets) to
metal index covers.




Typically, brass meter tags have mounting (screw/rivet) holes on each end of the tag.




Mount brass meter tags using one of three Itron-approved methods.




To secure brass meter tags to flat-faced meters
1. Method 1 and 2: Carefully remove the brass meter tag from the meter index cover. Try not to damage the
   meter tag mounting holes. The Sprague Adapter Plate has tag mounting holes in the lower left and right
   corners. After attaching the 100G Datalogging gas endpoint assembly to the meter, secure the meter tag to
   one of the holes with a utility-approved and provided security seal.



TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                  39
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




    Method 1: Attach the meter tag to the Adapter Plate tag mounting hole




    Method 2: Attach the meter tag to the 100G Datalogging gas endpoint mounting hole
              Note If the brass meter tag will be secured to the meter utilizing the module-to-meter
              mounting hole, it must be attached during the 100G Datalogging gas endpoint installation
              procedure described in Step 1 of Attaching the 100G Datalogging Gas Endpoint to the Meter
              on page 32.


              Caution A protruding brass meter tag can present a safety concern particularly if the tag is
              damaged with sharp edges protruding from the meter.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                     40
                                              Proprietary and Confidential


Itron/Sprague Meter Installation




2. Method 3: Remove the 100G Datalogging gas endpoint index cover and place the meter tag inside the
   endpoint assembly for optimal meter tag security. (See To assemble the 100G Datalogging gas endpoint
   and index on page 29.)




Method 3: Place the brass meter tag inside the 100G Datalogging gas endpoint assembly




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                               41
                                              Proprietary and Confidential


CHAPTER 5

National/Lancaster Meter Installation

This chapter provides instructions to install the 100G Datalogging gas endpoint on 175 - 250 CFH
National/Lancaster meters.




To remove the index from the meter
1. Remove any tamper seals from the index cover screws. Remove the index cover screws and the index
   cover from the meter. Discard the index cover mounting screws and index cover. The 100G Datalogging
   gas endpoint includes new, different-size endpoint mounting screws




             Note You may use the removed index cover as a temporary storage container for
             screws. Properly dispose all unused screws, old index covers, gaskets, tamper
             seals, and other leftover materials. Do not leave materials on customer premises.




TDC-0823-005    100G Datalogging Installation Guide - Direct Mount                                 42
                                            Proprietary and Confidential


National/Lancaster Meter Installation




2. Unscrew one index mounting screw completely. Hold one hand under the index to catch the screw. While
   removing the other mounting screw, pull the index away from the meter to keep the index backplate
   against the back of the screw. Remove the screw completely after the index is free of the meter.




    Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index will be mounted
    in the endpoint later in this procedure. Discard the index mounting screws. The 100G Datalogging gas
    endpoint for National/Lancaster meters includes new, different-sized index mounting screws (see
    Installation Prerequisites on page 7 for screw information).
3. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free
   of gasket residue or dirt before you install the 100G Datalogging gas endpoint assembly.




4. Verify the meter drive dog points straight out from the meter.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                    43
                                              Proprietary and Confidential


National/Lancaster Meter Installation




5. If the index has mounting legs, verify each leg is parallel to the back of the index (as shown) to ensure the
   correct alignment between the endpoint and meter.




6. Verify the index wriggler is parallel to the index surface.
              Caution User only dial-type indexes from National (or
              Actaris/Schlumberger/Sprague) Meter with the 100G Datalogging gas endpoint.

7. Attach indexes without mounting legs to the endpoint's index housing mounting posts (as shown below)
   using Itron screws SCR-0037-001 .




    Attach indexes with mounting legs to the endpoint's index bracket mounting posts (as shown below) using
    Itron screws SCR-0015-001.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                      44
                                              Proprietary and Confidential


National/Lancaster Meter Installation




To assemble the 100G Datalogging gas endpoint and index
1. Separate the 100G Datalogging gas endpoint housing from the cover by pulling the cover straight out from
   the housing.




2. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or snow. You will use the
   cover later in this installation procedure.
              Caution Use only dial-type indexes from National (or Actaris/Schlumberger/Sprague) Meter
              with the 100G Datalogging gas endpoint.
              Indexes with bow-tie shaped wrigglers are not compatible with 100G Datalogging gas
              endpoints. Obtain a compatible index.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                     45
                                              Proprietary and Confidential


National/Lancaster Meter Installation




              Note National/Lancaster meter indexes are available in different models:

              Some National/Lancaster Meter indexes have index legs to mount the index on the meter or
              endpoint. Some indexes have both legs and index mounting holes and some have just
              mounting holes. Mounting methods are dependent on the index. Index types require different
              mounting screws to attach the index to the 100G Datalogging gas endpoint housing (see
              Installation Prerequisites on page 7). Indexes with legs must be mounted to the endpoint
              housing mounting posts. Indexes with mounting holes must be attached to the endpoint
              housing's bracket mounting posts.




              Indexes with mounting legs                                     Index with mounting holes




              1 Bracket mounting posts (indexes with legs)
              2 Housing mounting posts (indexes without legs)
    If your index has legs with mounting screw slots, skip steps 3 and 4. If your index has mounting screw
    holes in the index back plate (no legs), perform steps 3 and 4, and skip steps 5 and 6.
3. For indexes with mounting screw holes in the index back plate (no legs), use replacement index mounting
   screws (SCR-0037-001 - see Installation Prerequisites on page 7). Place one screw into the index's right-
   hand mounting screw hole.
              Note National/Lancaster index mounting screws are thread-forming screws and
              may require more torque.




4. Attach the screw to the endpoint housing's right-index mounting post just enough to hold the screw and
   the right end of the index in place.


TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                     46
                                              Proprietary and Confidential


National/Lancaster Meter Installation




5. For indexes with legs (mounting slots), screw one 10 - 20 x 3/8" screw (SCR-0017-001, see Installation
   Prerequisites on page 7 for screw information) into the right index mounting post one or two turns. Do not
   completely tighten the screw.
6. Place the right index mounting screw slot under the screw head. Do not completely tighten the screw.
7. Carefully slide the index drive post into the endpoint wriggler. Verify positive engagement of the index
   wriggler to the endpoint drive dog. (The following photos show index/wrigglers with positive
   engagement.)




              Caution Verify the index drive slot engages with the 100G Datalogging gas
              endpoint wriggler. Failure to mate the endpoint wriggler with the index drive post
              (or slot) can cause binding and lead to poor registration or meter failure.

8. Install and tighten the left index mounting screw (for indexes with either mounting screw slots or holes).
   Tighten the right index mounting screw. Tighten each index mounting screw evenly.




9. Slide the endpoint cover over the index and housing. The endpoint label should be clearly visible and
   easily read.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                    47
                                              Proprietary and Confidential


National/Lancaster Meter Installation




Programming the 100G Datalogging Gas Endpoint Assembly
Program the 100G Datalogging gas endpoint using:

    A FC200SR handheld computer with Endpoint-Link® or Endpoint-Link Pro version 5.3 or higher or
    A FC300 with SRead handheld computer with Endpoint-Link or Endpoint-Link Pro version 5.5 or higher
    or
    A 900MHz Belt Clip Radio with Endpoint-Link version 5.5 or higher and a customer-supplied laptop. The
    Belt Clip Radio connects to the user-supplied laptop using a USB cable or Bluetooth.
See the Endpoint-Link v5.3 (or higher) Endpoint Programming Guide (TDC-0744) for more complete
programming information.




    FC200SR               FC300 with SRead           900MHz Belt Clip Radio

              Caution The 100G Datalogging gas endpoint must be programmed before use.
              Follow the steps in this section to properly program the endpoint.

Take note of the index drive rate shown on a top right dial on the index. The endpoint is programmed based
on the drive rate. National/Lancaster meter index drive rates are typically 2-cubic feet.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                  48
                                              Proprietary and Confidential


National/Lancaster Meter Installation




To program the 100G Datalogging gas endpoint
1. Program the index drive rate into the 100G Datalogging gas endpoint using the endpoint programming
   device. For all programming and "Check Endpoint" operations, hold the handheld programmer as close to
   vertical as possible. For best success, keep the handheld programmer within 6 feet of the target endpoint.
   Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard
   to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the
   configuration file loaded into the endpoint programming device.
   During programming, the 100G Datalogging gas endpoint is set to the nearest 100 cubic feet; the last two
   digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint
   assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This
   verifies the endpoint is counting properly after assembly.




              Caution Do not turn the drive wriggler faster than one turn per second.

3. Read or Check the 100G Datalogging gas endpoint using the endpoint programming device.
        If the read result is higher than the number programmed in Step 1, the 100G Datalogging gas endpoint
        is counting correctly.
        If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging
        gas endpoint.


Attaching the 100G Datalogging Gas Endpoint Assembly to the
Meter
After programming the 100G Datalogging gas endpoint, attach it to the National/Lancaster meter.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                    49
                                              Proprietary and Confidential


National/Lancaster Meter Installation




To attach the 100G Datalogging gas endpoint to the meter
1. Align the white wriggler (1) so one of its four drive slots lines up with the meter's drive dog (2).




2. Carefully place the 100G Datalogging gas endpoint on the meter.
                Warning Failure to correctly align the meter drive post and endpoint drive slot
                can cause binding and lead to poor registration or meter failure. If there is a
                gap between the endpoint gasket and the meter, it may be the drive slot of the
                endpoint assembly's wriggler is not correctly aligned with the meter drive slot.
                Remove the 100G Datalogging gas endpoint assembly and repeat the
                alignment procedure. You must engage endpoint wriggler in the meter drive
                dog.

3. Install endpoint to meter mounting screws in an alternating fashion. 100G Datalogging gas endpoints for
   National/Lancaster meters come with new, different-size endpoint mounting screws (SCR-0014-004 - see
   Installation Prerequisites on page 7 for screw information.) Insert the right index cover mounting screw
   and tighten the screw enough to hold it in place. Do not completely tighten. Install the left index cover
   mounting screw and tighten to a snug fit. Finish by tightening the right mounting screw to a snug fit.
   Tighten each endpoint mounting screw evenly.

              Important Meter manufacturers should torque the mounting screws 15 to 20 inch-pounds.

4. Place new tamper seals over the screws. Press the new tamper seals into place using the 11/32-inch nut
   driver or similar blunt tool.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                      50
                                              Proprietary and Confidential


National/Lancaster Meter Installation




5. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the
   customer premises.
100G Datalogging gas endpoint on the National/Lancaster Meter is complete.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                51
                                              Proprietary and Confidential


CHAPTER 6

Elster American and Itron Actaris Commercial Meter Installation

This chapter provides instructions to install the 100G Datalogging gas endpoint on Elster American Meter and
Itron/Actaris/Schlumberger commercial meters.




          Warning Handle the commercial 100G Datalogging gas endpoint carefully so the metal
          passive radiator antenna is not damaged.


Removing the Index/ Index Assembly from the Meter
Commercial 100G Datalogging gas endpoints can be mounted on Elster American Meters in various
configurations. These instructions show metal mounting plates without tamper seal cups and plastic mounting
plates with tamper seal cups to represent mounting plate options.




Mounting plate with tamper seal cups               Mounting plate without tamper seal cups


Indexes may be mounted on the 100G Datalogging commercial Elster American Meter gas endpoint without
mounting plates.




TDC-0823-005    100G Datalogging Installation Guide - Direct Mount                                   52
                                            Proprietary and Confidential


Elster American and Itron Actaris Commercial Meter Installation




Index covers may (or may not) have tamper seal cups (on the back of the cover) for added security. Index
removal assumes the installer will remove any tamper seals or wires before continuing with these instructions.

          Note It may not be necessary to dismantle your commercial index assembly (index and cover). These
          instructions do not include index/cover assembly for those applications.

          Some diaphragm commercial meters do not require an index assembly mounting plate. Indexes can be
          mounted directly to the endpoint.



To remove the index assembly
1. Remove any tamper seals (1) (or wire seals) from the index cover and mounting plate screws (2). Set the
   index/cover assembly aside. You will re-install it later in these instructions.




2. Remove the index cover screws from the meter. Verify screws are 1/2" long and are not corroded. If the
   screws are the correct length and are not corroded, keep them to re-install the 100G Datalogging gas
   endpoint assembly later in this procedure. If the screws are damaged or not the correct length, discard.




              Note Properly dispose all unused screws, old index covers, gaskets, tamper
              seals, and other leftover materials. Do not leave materials on customer premises.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                   53
                                              Proprietary and Confidential


Elster American and Itron Actaris Commercial Meter Installation




3. Remove the tamper seals from the mounting plate. Remove the mounting plate screws and separate the
   mounting plate from the meter. Place the mounting plate where it will not be damaged. You may use it
   later in this installation.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                54
                                              Proprietary and Confidential


Elster American and Itron Actaris Commercial Meter Installation




Programming the 100G Datalogging Commercial Gas Endpoint
Program the 100G Datalogging gas endpoints using:

    A FC200SR handheld computer with Endpoint-Link® or Endpoint-Link Pro version 5.3 or higher or
    A FC300 with SRead handheld computer with Endpoint-Link or Endpoint-Link Pro version 5.5 or higher
    or
    A 900MHz Belt Clip Radio with Endpoint-Link version 5.5 or higher and a customer-supplied laptop. The
    Belt Clip Radio connects to the user-supplied laptop using a USB cable or Bluetooth.
See the Endpoint-Link v5.3 (or higher) Endpoint Programming Guide (TDC-0744) for more complete
programming information.




    FC200SR              FC300 with SRead            900MHz Belt Clip Radio

              Caution The 100G Datalogging commercial endpoint must be programmed before use.
              Follow the steps in this section to properly program the endpoint.

Take note of the index drive rate shown on the index. The endpoint is programmed based on the drive rate.
Elster American commercial meter index drive rates may be 5-, 10- or 100 cubic feet. The index shown has a
5-cubic foot drive rate.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                55
                                              Proprietary and Confidential


Elster American and Itron Actaris Commercial Meter Installation




To program the 100G Datalogging commercial gas endpoint
1. Program the index drive rate into the 100G Datalogging gas endpoint using the endpoint programming
   device. For all programming and "Check Endpoint" operations, hold the handheld as close to vertical as
   possible. For best success, keep the handheld programmer within 6 feet of the target endpoint. Verify you
   have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read
   Mobile/Handheld Mode) for your application. Programming parameters are based on the configuration file
   loaded into the endpoint programming device.
   During programming, the 100G Datalogging gas endpoint is set to the nearest 100 cubic feet; the last two
   digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint
   assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This
   verifies the endpoint is counting properly.




              Caution Do not turn the drive wriggler faster than one turn per second.

3. Read or Check the 100G Datalogging commercial gas endpoint using the endpoint programming device.
        If the read result is higher than the number programmed in Step 1, the 100G Datalogging gas endpoint
        is counting correctly.
        If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging
        gas endpoint.




TDC-0823-005      100G Datalogging Installation Guide - Direct Mount                                    56
                                              Proprietary and Confidential



Document Created: 2010-09-15 13:45:04
Document Modified: 2010-09-15 13:45:04

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC