Test Report_JAB

FCC ID: 2ADBX-PR1A

Test Report

Download: PDF
FCCID_4483824

                          Shenzhen Zhongjian Nanfang Testing Co., Ltd.
                                                                                                  Report No: CCISE160501103

1        Cover Page

                                      FCC REPORT
Applicant:                                  8devices

Address of Applicant:                       Gedimino 47, Kaunas, LT-44242, Lithuania

Equipment Under Test (EUT)

    Product Name:                           Broadband Digital Transmission System

    Model No.:                              Rambutan

Applicable standards:                       FCC CFR Title 47 Part 15 Subpart B

Date of sample receipt:                     10 May, 2016

Date of Test:                               10 May, to 01 Jun., 2016

Date of report issued:                      02 Jun., 2016

Test Result:                                Pass *
  * In the configuration tested, the EUT complied with the standards specified above.




 Authorized Signature:




           Bruce Zhang
        Laboratory Manager
This report details the results of the testing carried out on one sample. The results contained in this test report do not relate to other
samples of the same product and does not permit the use of the CCIS product certification mark. The manufacturer should ensure that all
products in series production are in conformity with the product sample detailed in this report.

This report may only be reproduced and distributed in full. If the product in this report is used in any configuration other than that detailed in
the report, the manufacturer must ensure the new system complies with all relevant standards.

This document cannot be reproduced except in full, without prior written approval of the Company. Any unauthorized alteration, forgery or
falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law.
Unless otherwise stated the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained for 90 days
only.


                                                                                 Report No: CCISE160501103

2      Version

      Version No.                        Date                                    Description
            00                     02 Jun., 2016                                   Original




    Tested by:                                                           Date:          02 Jun., 2016

                                       Test Engineer

    Reviewed by:                                                         Date:          02 Jun., 2016

                                    Project Engineer




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                           Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                          Page 2 of 18


                                                                                                                           Report No: CCISE160501103

3         Contents
                                                                                                                                                                                Page
1     COVER PAGE ....................................................................................................................................................... 1
2     VERSION ............................................................................................................................................................... 2
3     CONTENTS ........................................................................................................................................................... 3
4     TEST SUMMARY .................................................................................................................................................. 4
5     GENERAL INFORMATION .................................................................................................................................. 5
    5.1   CLIENT INFORMATION ...................................................................................................................................................... 5
    5.2   GENERAL DESCRIPTION OF E.U.T. ...................................................................................................................................... 5
    5.3   TEST MODE.................................................................................................................................................................... 5
    5.4   DESCRIPTION OF SUPPORT UNITS ....................................................................................................................................... 6
    5.5   LABORATORY FACILITY ...................................................................................................................................................... 6
    5.6   LABORATORY LOCATION ................................................................................................................................................... 6
    5.7   TEST INSTRUMENTS LIST.................................................................................................................................................... 7
6     TEST RESULTS AND MEASUREMENT DATA ................................................................................................ 8
    6.1   CONDUCTED EMISSION ..................................................................................................................................................... 8
    6.2   RADIATED EMISSION ...................................................................................................................................................... 11
7     TEST SETUP PHOTO ........................................................................................................................................ 17
8     EUT CONSTRUCTIONAL DETAILS ................................................................................................................ 18




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                                                                              Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                                                                                       Page 3 of 18


                                                                                  Report No: CCISE160501103

4      Test Summary

                      Test Item                                 Section in CFR 47                 Result
                Conducted Emission                                  Part 15.107                    Pass
                 Radiated Emission                                  Part 15.109                    Pass
Pass: The EUT complies with the essential requirements in the standard.




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                           Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                          Page 4 of 18


                                                                            Report No: CCISE160501103


5      General Information
5.1 Client Information
        Applicant:                          8devices
        Address of Applicant:               Gedimino 47, Kaunas, LT-44242, Lithuania
        Manufacturer/Factory:               8devices
    Address of Manufacturer/Factory:        Gedimino 47, Kaunas, LT-44242, Lithuania

5.2 General Description of E.U.T.
        Product Name:                       Broadband Digital Transmission System
        Model No.:                          Rambutan
        Power supply:                       DC 5V

5.3 Test Mode
             Operating mode                 Detail description
               On mode                  Keep the EUT in On mode
 The sample was placed 0.8m above the ground plane of 3m chamber. Measurements in both horizontal and
 vertical polarities were performed. During the test, each emission was maximized by: having the EUT
 continuously working, investigated all operating modes, rotated about all 3 axis (X, Y & Z) and considered
 typical configuration to obtain worst position, manipulating interconnecting cables, rotating the turntable,
 varying antenna height from 1m to 4m in both horizontal and vertical polarizations. The emissions worst-
 case are shown in Test Results of the following pages.




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                           Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                          Page 5 of 18


                                                                           Report No: CCISE160501103

5.4 Description of Support Units
      Manufacturer                 Description                 Model     Serial Number         FCC ID/DoC
           DELL                         PC                OPTIPLEX745          N/A                  DoC
           DELL                     MONITOR                  E178FPC           N/A                  DoC
           DELL                   KEYBOARD                    SK-8115          N/A                  DoC
           DELL                      MOUSE                   MOC5UO            N/A                  DoC

5.5 Laboratory Facility
        The test facility is recognized, certified, or accredited by the following organizations:
        ● FCC - Registration No.: 817957
        Shenzhen Zhongjian Nanfang Testing Co., Ltd. EMC Laboratory has been registered and fully
        described in a report filed with the (FCC) Federal Communications Commission. The acceptance letter
        from the FCC is maintained in out files. Registration 817957, February 27, 2012.
        ● IC - Registration No.: 10106A-1
        The 3m Semi-anechoic chamber of Shenzhen Zhongjian Nanfang Testing Co., Ltd. has been
        Registered by Certification and Engineering Bureau of Industry Canada for radio equipment testing
        with Registration No.: 10106A-1.
        ● CNAS - Registration No.: CNAS L6048
        Shenzhen Zhongjian Nanfang Testing Co., Ltd. is accredited to ISO/IEC 17025:2005 General
        Requirements for the Competence of Testing and Calibration laboratories for the competence of
        testing.The Registration No. is CNAS L6048.

5.6 Laboratory Location
        Shenzhen Zhongjian Nanfang Testing Co., Ltd.
        Address: No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
        Bao’an District,Shenzhen, Guangdong,China
        Tel: +86-755-23118282
        Fax: +86-755-23116366




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                         Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                        Page 6 of 18


                                                                                Report No: CCISE160501103

5.7 Test Instruments list
Radiated Emission:
                                                                             Inventory    Cal. Date     Cal. Due date
Item     Test Equipment          Manufacturer              Model No.
                                                                                No.      (mm-dd-yy)      (mm-dd-yy)
 1          3m SAC                 SAEMC                9(L)*6(W)* 6(H)      CCIS0001    08-23-2014     08-22-2017
 2     BiConiLog Antenna       SCHWARZBECK                VULB9163           CCIS0005    03-25-2016     03-25-2017
 3       Horn Antenna          SCHWARZBECK               BBHA9120D           CCIS0006    03-25-2016     03-25-2017
          Pre-amplifier
 4                                    HP                     8447D           CCIS0003    04-01-2016     03-31-2017
        (10kHz-1.3GHz)
          Pre-amplifier      Compliance Direction
 5                                                        PAP-1G18           CCIS0011    04-01-2016     03-31-2017
         (1GHz-18GHz)            Systems Inc.
       Spectrum analyzer
 6                            Rohde & Schwarz               FSP30            CCIS0023    03-28-2016     03-28-2017
           9k-30GHz
 7     EMI Test Receiver      Rohde & Schwarz               ESRP7            CCIS0167    03-28-2016     03-28-2017




Conducted Emission:
                                                                             Inventory     Cal.Date     Cal.Due date
Item     Test Equipment          Manufacturer              Model No.
                                                                                No.      (mm-dd-yy)      (mm-dd-yy)
 1      Shielding Room       ZhongShuo Electron      11.0(L)x4.0(W)x3.0(H)   CCIS0061    08-23-2014     08-22-2017
 2     EMI Test Receiver      Rohde & Schwarz                ESCI            CCIS0002    03-24-2016     03-24-2017
 3            LISN                  CHASE                  MN2050D           CCIS0074    03-26-2016     03-26-2017
 4       Coaxial Cable               CCIS                     N/A            CCIS0086    04-01-2016     03-31-2017




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                             Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                            Page 7 of 18


                                                                               Report No: CCISE160501103

6      Test results and Measurement Data
6.1 Conducted Emission
        Test Requirement:                FCC Part 15 B Section 15.107
        Test Method:                     ANSI C63.4:2014
        Test Frequency Range:            150kHz to 30MHz
        Class / Severity:                Class B                 Class B
        Receiver setup:                  RBW=9kHz, VBW=30kHz
        Limit:                                                                         Limit (dBµV)
                                           Frequency range (MHz)
                                                                           Quasi-peak               Average
                                                  0.15-0.5                   66 to 56*              56 to 46*
                                                    0.5-5                       56                     46
                                                   0.5-30                       60                     50
                                         * Decreases with the logarithm of the frequency.
        Test setup:




        Test procedure                   1. The E.U.T and simulators are connected to the main power through a
                                            line impedance stabilization network(L.I.S.N.). The provide a
                                            50ohm/50uH coupling impedance for the measuring equipment.
                                         2. The peripheral devices are also connected to the main power through
                                            a LISN that provides a 50ohm/50uH coupling impedance with 50ohm
                                            termination. (Please refers to the block diagram of the test setup and
                                            photographs).
                                         3. Both sides of A.C. line are checked for maximum conducted
                                            interference. In order to find the maximum emission, the relative
                                            positions of equipment and all of the interface cables must be changed
                                            according to ANSI C63.4: 2014 on conducted measurement.
        Test environment:                Temp.:       23 C         Humid.:   56%         Press.:    101kPa
        Measurement Record:                                                               Uncertainty: ±3.28dB
        Test Instruments:                Refer to section 5.7 for details
        Test mode:                       Refer to section 5.3 for details
        Test results:                    Pass




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                            Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                            Page 8 of 18


                                                                         Report No: CCISE160501103


Measurement data:
Line:




Notes:
1. An initial pre-scan was performed on the line and neutral lines with peak detector.
2. Quasi-Peak and Average measurement were performed at the frequencies with maximized peak emission.
3. Final Level =Receiver Read level + LISN Factor + Cable Loss.




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                  Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                 Page 9 of 18


                                                                         Report No: CCISE160501103


Neutral:




Notes:
1. An initial pre-scan was performed on the line and neutral lines with peak detector.
2. Quasi-Peak and Average measurement were performed at the frequencies with maximized peak emission.
3. Final Level =Receiver Read level + LISN Factor + Cable Loss.




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                  Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                 Page 10 of 18


                                                                           Report No: CCISE160501103

6.2 Radiated Emission
       Test Requirement:                 FCC Part 15 B Section 15.109
       Test Method:                      ANSI C63.4:2014
       Test Frequency Range:             30MHz to 6000MHz
       Test site:                        Measurement Distance: 3m (Semi-Anechoic Chamber)
       Receiver setup:                    Frequency      Detector        RBW      VBW          Remark
                                         30MHz-1GHz Quasi-peak          120kHz   300kHz    Quasi-peak Value
                                                           Peak          1MHz     3MHz       Peak Value
                                         Above 1GHz
                                                           RMS           1MHz     3MHz      Average Value
       Limit:                                 Frequency          Limit (dBuV/m @3m)          Remark
                                            30MHz-88MHz                   40.0          Quasi-peak Value
                                           88MHz-216MHz                   43.5          Quasi-peak Value
                                           216MHz-960MHz                  46.0          Quasi-peak Value
                                            960MHz-1GHz                   54.0          Quasi-peak Value
                                                                          54.0            Average Value
                                             Above 1GHz
                                                                          74.0             Peak Value
       Test setup:                       Below 1GHz




                                         Above 1GHz




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                      Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                     Page 11 of 18


                                                                               Report No: CCISE160501103


       Test Procedure:                  1. The EUT was placed on the top of a rotating table 0.8 meters above the
                                           ground at a 3 meter semi-anechoic camber. The table was rotated 360
                                           degrees to determine the position of the highest radiation.
                                        2. The EUT was set 3 meters away from the interference-receiving
                                           antenna, which was mounted on the top of a variable-height antenna
                                           tower.
                                        3. The antenna height is varied from one meter to four meters above the
                                           ground to determine the maximum value of the field strength. Both
                                           horizontal and vertical polarizations of the antenna are set to make the
                                           measurement.
                                        4. For each suspected emission, the EUT was arranged to its worst case
                                           and then the antenna was tuned to heights from 1 meter to 4 meters
                                           and the rotatable table was turned from 0 degrees to 360 degrees to
                                           find the maximum reading.
                                        5. The test-receiver system was set to Peak Detect Function and Specified
                                           Bandwidth with Maximum Hold Mode.
                                        6. If the emission level of the EUT in peak mode was 10dB lower than the
                                           limit specified, then testing could be stopped and the peak values of the
                                           EUT would be reported. Otherwise the emissions that did not have 10dB
                                           margin would be re-tested one by one using peak, quasi-peak or
                                           average method as specified and then reported in a data sheet.
       Test environment:                Temp.:       25 C         Humid.:     55%         Press.:    1 01kPa
       Measurement Record:                                                                 Uncertainty: ±4.88dB
       Test Instruments:                Refer to section 5.7 for details
       Test mode:                       Refer to section 5.3 for details
       Test results:                    Passed




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                            Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                            Page 12 of 18


                                                                         Report No: CCISE160501103


Measurement Data:
Below 1GHz
Horizontal:




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                  Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                 Page 13 of 18


                                                                         Report No: CCISE160501103


Vertical:




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                  Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                 Page 14 of 18


                                                                         Report No: CCISE160501103


Above 1GHz
Horizontal:




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                  Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                 Page 15 of 18


                                                                         Report No: CCISE160501103


Vertical:




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                  Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                 Page 16 of 18


                                                                         Report No: CCISE160501103

7      Test Setup Photo
                                                   Radiated Emission




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                  Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                 Page 17 of 18


                                                                                 Report No: CCISE160501103


                                                  Conducted Emission




8      EUT Constructional Details
     Reference to the test report No. CCISE160501101




                                                     ------End of report------




Shenzhen Zhongjian Nanfang Testing Co., Ltd.                                          Project No.: CCISE1605011
No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road,
Bao’an District, Shenzhen, Guangdong, China
Telephone: +86 (0) 755 2311 8282 Fax: +86 (0) 755 2311 6366                                         Page 18 of 18



Document Created: 2016-10-27 09:33:35
Document Modified: 2016-10-27 09:33:35

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC