Virginia Tech

1915-EX-ST-2018

Status: Pending

N/A
2018-11-09
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Virginia Tech

Address
Attention: Scott Midkiff
Street Address: 800 Drillfield DR, Burruss Hall Suite 314 (0169)
P.O. Box:
City: Blacksburg
State: VA
Zip Code: 24061
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Nealy
First Name: Randall
Title: Lecturer
Phone Number: 540-231-7280

Explanation
Please explain in the area below why an STA is necessary:
The STA is required for preliminary experiments and to evaluate the feasibility of a full scale radio test-bed in the Arlington area.

Purpose of Operation
Please explain the purpose of operation:  Testing LTE. Operations will be only for the purpose of advancing radio technology. The transmissions will evaluate radio frequency systems under real world conditions. Experiment topics include spectrum sensing, dynamic frequency sharing, propagation studies, evolving communications architectures and wireless network security. Initial experiments will include LTE or LTE-like transmissions.

Information
Callsign: WN9XQB
Class of Station: FX MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 12/15/2018
Operation End Date: 05/15/2019

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Ettus Research N210 5 Yes
Ettus Research X310 5 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Scott Midkiff
Title of Applicant (if any): VP for Information Technology and CIO
Date: 2018-11-09 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Arlington Virginia North  38  52  51 West  77  6  57 Arlington, VA 5.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 3.65000000-3.70000000 GHz MO 100.000000 mW 400.000000 mW P 10M0D7D OFDM LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 3.65000000-3.70000000 GHz MO 100.000000 mW 400.000000 mW P 20M0D7D OFDM LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.65000000-3.70000000 GHz FX 100.000000 mW 400.000000 mW P 10M0D7D OFDM LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.65000000-3.70000000 GHz FX 100.000000 mW 400.000000 mW P 20M0D7D OFDM LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 5.92500000-7.12500000 GHz FX 100.000000 mW 400.000000 mW P 20M0D7D OFDM LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 5.92500000-7.12500000 GHz FX 100.000000 mW 400.000000 mW P 40M0D7D OFDM LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 5.92500000-7.12500000 GHz MO 100.000000 mW 400.000000 mW P 20M0D7D OFDM LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 5.92500000-7.12500000 GHz MO 100.000000 mW 400.000000 mW P 40M0D7D OFDM LTE