Exhibit 1 Request for STA

0692-EX-ST-2017 Text Documents

United States Cellular Corporation

2017-05-26ELS_192650

                   Exhibit 1 - Request for Special Temporary Authorization



U.S. Cellular submits this application for a six (6) month special temporary authorization from
the Federal Communications Commission to conduct short-term experimental testing between
3550-3600 MHz in suburban and rural environments in Penobscot and Somerset counties in
Maine as well as Buncombe and Henderson counties in North Carolina. The experimental testing
will involve studying the radio propagation characteristics of frequencies in the proposed
Citizens Broadband Radio Service (CBRS) spectrum to help determine the applicability of this
spectrum to support various future wireless services.

Radio System:

The test will involve base station and end-user equipment operating in the proposed CBRS band.
The base station equipment will be mounted on existing U.S. Cellular tower facilities and will
transmit at a maximum EIRP of 47 dBm/10 MHz, consistent with the current proposed CBRS
rules for Class-B CBRS Base Station Devices. The user equipment will transmit at a maximum
EIRP of 23 dBm, also consistent with proposed CBRS rules. LTE Modulation will be used with
up to two (2) 20 MHz carriers within the 3550 to 3600 MHz spectrum.

Test Locations:

The base station equipment and antennas will be installed at four (4) locations.

                    Latitude          Longitude          Antenna Height (AGL)
                  N 35° 19’ 43.8”   W 82° 29’ 35.8”              156’
                  N 35° 31’ 52.7”   W 82° 40’ 36.7”              140’
                  N 45° 05’ 35.0”   W 69° 05’ 05.6”              220’
                  N 44° 45’ 57.2”   W 69° 37’ 30.2”              150’


The end-user equipment will placed at various locations within 10 miles of the base station
locations listed above. The end-user equipment will be mounted at heights up to 15’ above
ground level (AGL).

Directional antennas will be used at both the base station and end-user equipment locations.

All the base station and end-user locations will be outside of the proposed CBRS “Exclusion
Zones” defined by the National Telecommunications and Information Administration (NTIA)
which protects incumbent users of the spectrum.



Document Created: 2017-05-26 16:43:13
Document Modified: 2017-05-26 16:43:13

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC