Ultra Electronics - Tactical Communication Systems (TCS)

1242-EX-ST-2019

Status: Pending

N/A
2019-07-04

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Jul 4 2019]Correspondence2019-07-04
E-Mail generated [Jul 9 2019]Correspondence2019-07-09
E-Mail generated [Jul 9 2019]Correspondence2019-07-09
Dismiss E-mail Notification generated [Jul 25 2019]Correspondence2019-07-25
Dismissal Without Prejudice generated [Jul 24 2019]Correspondence2019-07-31
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Ultra Electronics - Tactical Communication Systems (TCS)

Address
Attention: Robert Simpson
Street Address: 5990 Cote de Liesse
P.O. Box:
City: Montreal
State:
Zip Code:
Country: Canada
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Simpson
First Name: Robert
Title: Special Operations Sales Manager
Phone Number: 8136956564

Explanation
Please explain in the area below why an STA is necessary:
To Conduct a United States Special Operation Command Technical Experimentation at Texas A&M, Rellis Campus, Bryan, TX from 15-18 July 2019.

Purpose of Operation
Please explain the purpose of operation:  Illustrate the aggregate bandwidth and data rates with simultaneous operations Point-to-Point, Point-to-Multipoint, and Universal mesh waveform (Silvus/TSM) statistics with overlapping network layers to ensure that nodes can connect via a diversity of waveforms (including ECCM/AJ), channel bandwidths, network topologies, frequency bands, routes, antenna types and polarization, MIMO paths and radio channels

Information
Callsign:
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 07/15/2019
Operation End Date: 07/19/2019

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Ultra Electronics - TCS X500 1 No
Ultra Electronics - TCS X510 1 No
Silvus Handheld radio SC4200 1 No
Trellisware TW650 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Robert Simpson
Title of Applicant (if any): Special Operations Sale Manager
Date: 2019-07-04 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Byran Texas North  30  38  4 West  96  28  41 6.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1350.00000000-1390.00000000 MHz FX 1.260000 W 30.500000 W M 0.00030000 % 26H5D1D 128QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1350.00000000-1390.00000000 MHz FX 1.260000 W 30.500000 W M 0.00030000 % 26M5D1D 128QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2200.00000000-2310.00000000 MHz FX 1.600000 W 2.700000 W M 0.00030000 % 22H8D1D 64QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2200.00000000-2310.00000000 MHz FX 1.600000 W 2.700000 W M 0.00030000 % 22M8D1D 64QAM

19831

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC