                     Accion Systems’ TILE Propellant Tank Environmental Testing
                               From December 20th, 2017 to July 24th, 2018


                                  Document release date: July 25th, 2018
                                         Updated: March 18th, 2019




                                                                                  1


Accion Systems Inc.
www.accion-systems.com
529 Main Street, Suite 114 ∙ Boston ∙ MA 02129
Phone 617-500-2563

Accion TILE Propellant Tank Testing i
Order of qualification testing on any test hardware is always 1) humidity, 2) vibration and 3) thermal testing ii. Qualification vibration testing is always started
immediately following humidity to ensure test hardware is fully saturated iii. All qualification-level vibration and thermal testing is done per NASA-GSFC-700A.

Additionally, each test article is exposed to vacuum (depressurized from ambient pressure) multiple times throughout its test lifecycle and subsequently
inspected for leaks. iv

Tests in Table 1 are grouped by hardware designation and are not chronological.
                                                      Table 1 List of TILE Propellant Tank Tests from December 20, 2017 to July 24, 2018

 Tests Run                Test Description            Test Objective              Test Levels              Pass/Fail     Test              Hardware Tested                    Results
                                                                                                           Criteria      Completion        (all hardware listed below
                                                                                                                         Date              contained a sublimation
                                                                                                                         (yyyy/mm/dd)      barrier)
 Lifetime Test            Thruster performance        Verify successful tank      1 microtorr vacuum       -Bi-polar     2018/02/16        TILE 50 Qualification Tank SN02    PASS –
                          test under vacuum           vacuum pump-down and                                 operation?                                                         successful bi-
                                                      thruster lifetime ion                                -Propellant                                                        polar
                                                      emission test                                        leaks?                                                             operation, no
                                                                                                                                                                              leaks detected
 Launch Vibration v       3-axis, random vibration    Verify system can operate   Qualification level:     Propellant    2017/12/20        TILE 500 Prototype Tank 02         PASS – no
                                                      nominally after launch      14.1 grms per            leaks?                                                             leaks detected
                                                      vibration                   NASA-GSFC-700A
 Humidity Exposure        Long duration/high          Verify propellant water     Qualification level:     Propellant    2018/05/23        TILE 500 Prototype Tank 02         PASS – no
 Test vi                  humidity exposure           absorption does NOT         99%, 10 days             leaks?                                                             leaks detected
                                                      cause liquid leaking
 Thermal Vacuum           Thermal stress test post-   Verify the system has no    Qualification level: -   Propellant    2018/05/29        TILE 500 Prototype Tank 02         PASS – no
 Survivable               vibration                   workmanship flaws and       30 C to +90 C, <10       leaks?                                                             leaks detected
 Temperature Cycling                                  functions nominally after   microtorr
                                                      thermal cycling
 Humidity Exposure Test   Long duration/high          Verify propellant water     Qualification level:     Propellant    2018/06/06        TILE 500 Qualification Tank SN03   PASS – no
                          humidity exposure           absorption does NOT         99%, 15 days             leaks?                                                             leaks detected
                                                      cause liquid leaking
 Launch Vibration +       3-axis, random vibration    Verify system can operate   Qualification level:     Propellant    2018/06/07        TILE 500 Qualification Tank SN03   PASS – no
 Depressurization         while depressurizing per    nominally after exposure    14.1 grms per            leaks?                                                             leaks detected
                          Falcon 9 launch pressure    to vibration during         NASA-GSFC-700A
                          profile                     depressurization
 Thermal Vacuum           Thermal stress test post-   Verify the system has no    Qualification level:     Propellant    2018/06/27        TILE 500 Qualification Tank SN03   PASS – no
 Survivable               vibration                   workmanship flaws and       -30C to +90 C, <10       leaks?                                                             leaks detected
 Temperature Cycling                                  functions nominally after   microtorr
                                                      thermal cycling

                                                                                                                                                                                               2


Accion Systems Inc.
www.accion-systems.com
529 Main Street, Suite 114 ∙ Boston ∙ MA 02129
Phone 617-500-2563
 Tests Run                 Test Description           Test Objective              Test Levels            Pass/Fail    Test           Hardware Tested                    Results
                                                                                                         Criteria     Completion     (all hardware listed below
                                                                                                                      Date           contained a sublimation
                                                                                                                      (yyyy/mm/dd)   barrier)
 Humidity Exposure Test    Long duration/high         Verify propellant water     Qualification level:   Propellant   2018/06/06     TILE 500 Qualification Tank SN04   PASS – no
                           humidity exposure          absorption does NOT         99%, 36 days           leaks?                                                         leaks detected
                                                      cause liquid leaking
 Launch Vibration +        3-axis, random vibration   Verify system can operate   Qualification level:   Propellant   2018/06/26     TILE 500 Qualification Tank SN04   PASS – no
 Depressurization          while depressurizing per   nominally after exposure    14.1 grms per          leaks?                                                         leaks detected
                           Falcon 9 launch pressure   to vibration during         NASA-GSFC-700A
                           profile                    depressurization
 Humidity Exposure Test    Long duration/high         Verify propellant water     Qualification level:   Propellant   2018/07/24     TILE 500 Qualification Tank SN05   PASS – no
                           humidity exposure          absorption does NOT         99%, 96 days           leaks?                                                         leaks detected
                                                      cause liquid leaking
 Launch Vibration +        3-axis, random vibration   Verify system can operate   Qualification level:   Propellant   2018/05/03     TILE 500 Qualification Tank SN05   PASS – no
 Depressurization (rapid   (worst case)               nominally after exposure    14.1 grms per          leaks?                                                         leaks detected
 depressurizing)                                      to vibration during         NASA-GSFC-700A
                                                      depressurization
 Launch Vibration +        Worst case axis, random    Verify system can operate   Qualification level:   Propellant   2018/05/04     TILE 500 Qualification Tank SN05   PASS – no
 Depressurization (rapid   vibration while rapidly    nominally after exposure    14.1 grms per          leaks?                                                         leaks detected
 depressurizing)           depressurizing             to vibration during         NASA-GSFC-700A
 Run 1 of 4 vii                                       depressurization
 Launch Vibration +        Worst case axis, random    Verify system can operate   Qualification level:   Propellant   2018/05/04     TILE 500 Qualification Tank SN05   PASS – no
 Depressurization (rapid   vibration while rapidly    nominally after exposure    14.1 grms per          leaks?                                                         leaks detected
 depressurizing) repeat    depressurizing             to vibration during         NASA-GSFC-700A
 Run 2 of 4                                           depressurization
 Launch Vibration +        Worst case axis, random    Verify system can operate   Qualification level:   Propellant   2018/05/04     TILE 500 Qualification Tank SN05   PASS – no
 Depressurization (rapid   vibration while rapidly    nominally after exposure    14.1 grms per          leaks?                                                         leaks detected
 depressurizing) repeat    depressurizing             to vibration during         NASA-GSFC-700A
 Run 3 of 4                                           depressurization
 Launch Vibration +        Worst case axis, long      Verify system can operate   NASA-GSFC-700A         Propellant   2018/05/04     TILE 500 Qualification Tank SN05   PASS – no
 Depressurization (long    duration, random           nominally after exposure    Qualification level:   leaks?                                                         leaks detected
 duration + rapid          vibration while rapidly    to vibration during         +20% grms &
 depressurizing) repeat    depressurizing             depressurization            +100% duration
 Run 4 of 4
 Launch Vibration +        Worst case                 Verify system can operate   Qualification level:   Propellant   2018/05/29     TILE 500 Qualification Tank SN05   PASS – no
 Depressurization (rapid   axis/orientation, random   nominally after exposure    14.1 grms per          leaks?                                                         leaks detected
 depressurizing)           vibration while rapidly    to vibration during         NASA-GSFC-700A
                           depressurizing             depressurization
 Humidity Exposure Test    Long duration/high         Verify propellant water     Qualification level:   Propellant   2018/03/07     TILE Qualification Tank SN01       PASS – no
                           humidity exposure          absorption does NOT         99%, 12+ days          leaks?       thru           thru SN40                          leaks detected
                                                      cause liquid leaking                                            2018/06/20


                                                                                                                                                                                         3


Accion Systems Inc.
www.accion-systems.com
529 Main Street, Suite 114 ∙ Boston ∙ MA 02129
Phone 617-500-2563

i
   Inspection occurs pre and post test; each design is inspected before and after each test both visually and with use of leak detection equipment
ii
    Deviation from this order of testing is acceptable only if supported by engineering analysis
iii
    See above (ii)
iv
    Multiple depressurizations: the test articles are placed inside vacuum chambers and exposed to at least millitorr pressures during a depressurization
v
    Test done out of order as developmental test to qualification levels
vi
    During humidity testing, the test hardware is exposed to high humidity continuously per the levels specified except for mass measurements taken outside the chamber
periodically
vii
     TILE 500 Qualification Tank SN05 was subjected to multiple, harsh (rapid) depressurization profiles and an extended duration vibration test for design verification




                                                                                                                                                                           4