Sunset Vine APP Productions

1343-EX-ST-2015

Status: Grant Expired Due to New License

WJ9XIZ
2016-01-28

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Jan 29 2016]Correspondence2016-01-29
Narrative Explanation of Operation and Frequency CoordinationText Documents2015-12-22
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Sunset Vine APP Productions

Address
Attention: Thomas Copeland
Street Address: 18 Beaumont Street
P.O. Box:
City: Oxford
State:
Zip Code: OX12NA
Country: United Kingdom
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Imlay
First Name: Christopher
Title: Communications Counsel
Phone Number: 3013845525

Explanation
Please explain in the area below why an STA is necessary:
An STA is necessary for a United Kingdom video production company can conduct video production and international broadcast operations using various frequency bands for video transmission from boats to land and for relay of video signals to a land-based production area, and for audio cueing and operational communications incidental to broadcast and video production operations at the ISAF Sailing World Cup sailboat race in Miamis Biscayne Bay. The applicant cannot obtain licenses for this single event in time for the event and in some cases the bands to be used are not allocated for broadcast auxiliary operations in any case.

Purpose of Operation
Please explain the purpose of operation:  Video production and broadcast operations for a unique sailing regatta for an international audience by a video production and broadcast company based in the United Kingdom.

Information
Callsign: WJ9XIZ
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 01/19/2016
Operation End Date: 01/31/2016

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
various various 40 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Thomas Copeland
Title of Applicant (if any): Technical Producer
Date: 2015-12-22 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Biscayne Bay Florida North  25  43  30 West  80  10  50 Biscayne Bay, near Coconut Grove, Florida 10.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 450.00000000-470.00000000 MHz MO 5.000000 W 5.000000 W P 11K2F3E
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2200.00000000-2290.00000000 MHz MO 5.000000 W 5.000000 W P 8M00D7W COFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 6875.00000000-7125.00000000 MHz MO 0.500000 W 0.500000 W P 8M00D7W COFDM

17765

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC