Toggle navigation
FCC.report
IBFS
ELS
FCC ID
Contact
About
FCC.report
›
ELS
›
Spire Global, Inc.
›
1228-EX-ST-2019
Spire Global, Inc.
1228-EX-ST-2019
Status: Pending
N/A
2019-07-03
Documents and Communications:
[
refresh
]
Description
Category
Date
Narrative
Text Documents
2019-07-03
Schedule S
Text Documents
2019-07-03
Orbital Debris Assessment Report and Mitigation Plan
Text Documents
2019-07-03
E-Mail generated [Jul 18 2019]
Correspondence
2019-07-18
E-Mail generated [Jul 25 2019]
Correspondence
2019-07-25
Supplement 090919
Text Documents
2019-09-09
Response to FCC OET 082219
Text Documents
2019-08-22
Amendment of Period of Operation
Text Documents
2019-08-22
Dismissal Without Prejudice generated [Sep 3 2020]
Correspondence
2020-09-03
Dismiss E-mail Notification generated [Sep 3 2020]
Correspondence
2020-09-03
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY
Applicant Name
Name of Applicant:
Spire Global, Inc.
Address
Attention:
Ananda Martin
Street Address:
575 Florida Street, Suite 150
P.O. Box:
City:
San Francisco
State:
CA
Zip Code:
94110
Country:
E-Mail Address:
[email protected]
Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:
Last Name:
Martin
First Name:
Ananda
Title:
General Counsel
Phone Number:
+14156329730
Explanation
Please explain in the area below why an STA is necessary:
Spire Global, Inc. (Spire) requests experimental special temporary authority (STA) for one (1) to-be-deployed Spire LEMUR-2 satellite bus (LEMUR-2 Satellite), which will host a payload (KeyW Payload) to be operated by KeyW Corporation (KeyW) onboard. Grant of the LEMUR-2 Satellite STA request will allow KeyW to provide valuable demonstration and test data to the United States Air Force in a timely manner.
Purpose of Operation
Please explain the purpose of operation:
The Spire LEMUR-2 satellite bus will host a payload for KeyW. The LEMUR-2 Satellite subject to this STA request will (i) receive commands and software updates and (ii) downlink telemetry and data gathered by the KeyW Payload. Spire notes that the LEMUR-2 Satellite will not contain its typical Automatic Identification System, Automatic Dependent Surveillance-Broadcast, and Global Navigation Satellite System Radio Occultation payloads. Instead, this LEMUR-2 Satellite will only contain the KeyW Payload and standard LEMUR-2 Satellite radios and associated hardware. These radios and hardware have already been approved for use by the Commission (see IBFS File No. SAT-AMD-20180102-00001).
Information
Callsign:
Class of Station:
MO
Nature of Service:
Experimental
Requested Period of Operation
Operation Start Date:
05/01/2020
Operation End Date:
10/31/2020
Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:
Manufacturer
Model Number
No. Of Units
Experimental
Spire
LEMUR-2
1
Yes
Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form):
Ananda Martin
Title of Applicant (if any):
General Counsel
Date:
2019-07-02 00:00:00.0
Station Location
City
State
Latitude
Longitude
Mobile
Radius of Operation
North
West
NGSO satellite
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
100.00
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
8025.00000000-8400.00000000 MHz
MO
1.000000 W 2.200000 W
P
0.00100000 %
60M0G1D
QPSK
City
State
Latitude
Longitude
Mobile
Radius of Operation
North
West
NGSO satellite
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
80.00
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
2020.00000000-2025.00000000 MHz
MO
1.000000 W 2.700000 W
P
0.00100000 %
5M00G1D
QPSK
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
2200.00000000-2290.00000000 MHz
MO
1.000000 W 2.700000 W
P
0.00100000 %
1M00G1D
QPSK
City
State
Latitude
Longitude
Mobile
Radius of Operation
North
West
NGSO satellite
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
402.00000000-403.00000000 MHz
MO
2.000000 W 1.400000 W
P
0.00100000 %
200KG1D
GMSK
26428
© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC