Sceye

1013-EX-ST-2020

Status: Pending

N/A
2020-07-20

Documents and Communications: [refresh]

DescriptionCategoryDate
Roswell L Band AFTRCC CoordinationPre Coordination Document2020-07-20
Roswell S Band AFTRCC CoordinationPre Coordination Document2020-07-20
Description of MissionText Documents2020-07-20
Directional Antenna Information SheetText Documents2020-07-20
E-Mail generated [Jul 20 2020]Correspondence2020-07-20
Grant E-mail Notification generated [Aug 10 2020]Correspondence2020-08-10
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Sceye

Address
Attention: Frank Sneeringer
Street Address: 50 George Applebay Way, Building 200
P.O. Box:
City: Moriarty
State: NM
Zip Code: 87035
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Sneeringer
First Name: Frank
Title: System Design Engineer
Phone Number: 3025931588

Explanation
Please explain in the area below why an STA is necessary:
Sceye Inc is developing and manufacturing a high altitude airship platform for commercial use. To communicate with the remote piloted platform L and S band radio communications are required for command/control and video downlink from the platform.

Purpose of Operation
Please explain the purpose of operation:  Flight testing of two funded airship platforms are planned. Airships will ascend from ground level and operate at a nominal cruise altitude of 60,000 to 65,000 ft. The first flight is scheduled for September to October of 2020, and second flight for May to July 2021, depending on weather windows and flight conditions. The first flight has a nominal operation time of 24 hours and is primarily a technology demonstrator. Radio testing will be carried out of our Roswell, NM and Moriarty, NM facilities. A separate application will be put in for the second ship as it will be more than 6 months separated from the first ship flight.

Information
Callsign: WQ9XTT
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 08/10/2020
Operation End Date: 02/01/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Persistent Systems MPU5 4 No
Advanced Microwave Products FSX1 9 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Frank Sneeringer
Title of Applicant (if any): System Design Engineer
Date: 2020-06-30 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Roswell New Mexico North  33  18  50 West  104  32  42 Roswell, NM 242.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 1443.67000000-1445.33000000 MHz MO 2.000000 W 30.600000 W M 0.00050000 % 1M66F1D BFSK, Positive Logic
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 1500.67000000-1502.33000000 MHz MO 2.000000 W 3.900000 W M 0.00050000 % 1M66F1D BFSK, Positive Logic
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 1519.67000000-1521.33000000 MHz MO 2.000000 W 30.600000 W M 0.00050000 % 1M66F1D BFSK, Positive Logic
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 2367.00000000-2387.00000000 MHz MO 10.000000 W 1.217000 kW P 0.00150000 % 18M0D1D OFDM

19459

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC